RERA registered P52100076753 Active
GOLDEN NEST B building
Autade Handewadi, Pune · Others by Bhagwat Pardeshi Realty
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
GOLDEN NEST B building in Autade Handewadi is MahaRERA-registered (P52100076753) and still under construction, with possession filed for December 2028. Buyers have already registered 27 sales here at a median ₹6,540 per sq ft of carpet — not an asking price. Bhagwat Pardeshi Realty is the promoter.
- Sold here at
- ₹6,540
- per sq ft, 27 registered sales
- Available
- 1, 2, 3 BHK
- 19 left · 482–986 sq ft
- Possession
- Dec 2028
- as filed with MahaRERA
Where this is
Autade Handewadi, PMRDA, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 46 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 14 units · 1 available
2 BHK 31 units · 17 available
3 BHK 1 unit · all available
21 / 46
46% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 14 flats · 1 available
472 sq ft carpet as drawn, from 460–482 sq ft filed in this configuration
- Carpet, filed
- 472 sq ft
- Built-up
- about 566 sq ft
- Super built-up
- about 661 sq ft
Every room in this flat
Living and dining about 177 sq ft, Master bedroom about 118 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Passage about 24 sq ft.
2 BHK 31 flats · 17 available
677 sq ft carpet as drawn, from 483–834 sq ft filed in this configuration
- Carpet, filed
- 677 sq ft
- Built-up
- about 812 sq ft
- Super built-up
- about 948 sq ft
Every room in this flat
Living and dining about 197 sq ft, Master bedroom about 131 sq ft, Second bedroom about 105 sq ft, Kitchen about 79 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 39 sq ft, Passage about 33 sq ft.
3 BHK 1 flat · 1 available
986 sq ft carpet as drawn
- Carpet, filed
- 986 sq ft
- Built-up
- about 1,183 sq ft
- Super built-up
- about 1,380 sq ft
Every room in this flat
Living and dining about 242 sq ft, Master bedroom about 162 sq ft, Second bedroom about 129 sq ft, Third bedroom about 105 sq ft, Kitchen about 97 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 48 sq ft, Passage about 48 sq ft, Third bath about 40 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,907 to ₹7,295 per sq ft |
|---|---|
| Sold and booked | 27 sold, 0 booked |
| Still available | 19 flats, 460–986 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | OUATADE HANDEWADI · shown on this site as Autade Handewadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | HANDEWADI ROAD |
| Bounded north by | ADJOINING PART OF S NO 1 |
| Bounded east by | ADJOINING PART OF S NO 1 |
| Bounded south by | 60 METER |
| Bounded west by | ADJOINING PART OF S NO 1 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Bhagwat Pardeshi Realty |
|---|---|
| Registered office | Plot No 3, Pandurang Nivas, Padmadarshan Society, Off Pune Satara Road, Besides Treasure Park Society, Padmavati, Pune 411009 |
Professionals named on the filing
| Architect | Jyotindra B Nikam CA/96/19709 |
|---|---|
| Engineer | Swapnil Nimhan REG/PMC/TEMP/0012/23 |
| Chartered Accountant | Rahul Shriniwas Jaju 149944 |
| Chartered Accountant | S P Shaha and Co 104934 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TITAL REPORT CHAVAN upload final 15042024.pdf | 15 April 2024 5 older versions on file |
|---|---|
| Promoter's declaration, Form B 1 Declaration in FORM B.pdf | 16 October 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100076753 |
| Promoter | Bhagwat Pardeshi Realty |
| Project type | Others · Building development |
| Locality | Autade Handewadi — Haveli taluka, pincode 411028 |
| Applied on | 06 November 2023 |
| Registered on | 25 June 2024 |
| Completion, as first filed | 31 December 2028 |
| Due | 31 December 2028 |
| Units declared | 46 |
| Units sold | 21 of 46 sold (46%), 25 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 26 June 2024 |
| Application reference | REA52100149144 |
| Current status | Active |
| Record last changed | 20 February 2025 · 19 months ago |
Where the sold count comes from, and whether it holds up. 21 of 46 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 21 of 46 sold, leaving 25. The unit-by-unit list they file separately covers 46 flats and marks 27 sold with 19 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 20 February 2025.
Common questions
- Is GOLDEN NEST B building registered with MahaRERA?
- Yes. It is registered as P52100076753, filed on 25 June 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is GOLDEN NEST B building due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has GOLDEN NEST B building been delayed?
- No. December 2028 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in GOLDEN NEST B building?
- A median of ₹6,540 per square foot of carpet, across 27 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in GOLDEN NEST B building?
- 19 of 46 were still unsold at the promoter's last filing, in 1, 2, 3 BHK, from 482–986 sq ft of carpet.
- Are there complaints against GOLDEN NEST B building?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building GOLDEN NEST B building?
- Bhagwat Pardeshi Realty, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100076753 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Autade Handewadi
Stock image
- Due
- Dec 2028
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Nearby
- ₹6,471–6,599
- On offer
- 1, 2, 3 BHK
- Due
- Mar 2032
- Units
- 336
- Carpet
- 492–786
- Typical flat
- ~₹41.1 lakh
Stock image
- Nearby
- ₹6,589
- On offer
- 2 BHK
- Due
- Dec 2030
- Units
- 24
- Carpet
- 573–661
- Typical flat
- ~₹40.5 lakh