Z Zomefy

RERA registered P52100045598 Active

Vaanya Cluster C

Alandi, Pune · Residential / Group Housing by Pharande Promoters and Builders

Official record Updated from the register 30 October 2026. Anything filed since then is not here yet.

In short

Vaanya Cluster C in Alandi is MahaRERA-registered (P52100045598) and still under construction, with possession filed for June 2027. Buyers have already registered 67 sales here at a median ₹8,187 per sq ft of carpet — not an asking price. About 97% of the 69 units are sold. Pharande Promoters and Builders is the promoter.

Stock image, not a photograph of Vaanya Cluster C Stock image
Where
Alandi
pincode 412105
Sold here at
₹8,187
per sq ft, 67 registered sales
Available
2 BHK
2 left · 662 sq ft
Possession
Jun 2027
as filed with MahaRERA
A stock photograph, not Vaanya Cluster C. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pimpri Chinchawad (M Corp.) · Haveli

Alandi, PCMC, Pune, 412105

Village Pimpri Chinchawad (M Corp.)
Taluka Haveli
Pincode 412105
Promoter Pin Coordinates 18.671443, 73.837083

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 69 flats are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
69 Total Licenced Units
Dominant Typology • 73.9% of tower

2 BHK Residences

2 Available 51 registered total
Estimated Market Window ₹54.2 lakh – ₹57.9 lakh
Locality Benchmark ₹8,187 / sq ft
Carpet Variations as Filed Span: 662 to 707 sq ft
662 sq ft 61.5 sq m 33 units
707 sq ft 65.64 sq m 18 units
Govt ASR Base: ₹50.2 lakh – ₹56.2 lakh 2 of 51 available
Executive Typology • 26.1% of tower

3 BHK Residences

0 Available 18 registered total
Estimated Market Window ₹68.8 lakh
Locality Benchmark ₹8,187 / sq ft
Carpet Variations as Filed Span: 840 sq ft
840 sq ft 78.05 sq m 18 units
None available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 662 – 707 sq ft (61.5 – 65.64 sq m) ~794 – 848 sq ft ~927 – 990 sq ft 2 left of 51
3 BHK 840 sq ft (78.05 sq m) ~1008 sq ft ~1176 sq ft 0 left of 18
Units sold

67 / 69

Nearly sold out

97% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 51 flats · 2 available

662 sq ft carpet as drawn, from 662–707 sq ft filed in this configuration

Carpet, filed
662 sq ft
Built-up
about 794 sq ft
Super built-up
about 927 sq ft
Every room in this flat

Living and dining about 193 sq ft, Master bedroom about 129 sq ft, Second bedroom about 103 sq ft, Kitchen about 77 sq ft, Bath about 45 sq ft, Balcony about 45 sq ft, Second bath about 39 sq ft, Passage about 32 sq ft.

3 BHK 18 flats · none available

840 sq ft carpet as drawn

Carpet, filed
840 sq ft
Built-up
about 1,008 sq ft
Super built-up
about 1,176 sq ft
Every room in this flat

Living and dining about 207 sq ft, Master bedroom about 138 sq ft, Second bedroom about 110 sq ft, Third bedroom about 90 sq ft, Kitchen about 83 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 41 sq ft, Third bath about 34 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,187 per sq ft of carpet, median of 67 registered sales
Range across those sales ₹7,359 to ₹8,736 per sq ft
Sold and booked 67 sold, 0 booked
Still available 2 flats, 662–840 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Jun 2027
Declared at registration
Current Statutory Date
Due
Jun 2027
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gat No 737, 738, 739, 742 Part, Moshi Boradewadi is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed Moshi
Bounded north by Proposed Residential Building
Bounded east by Gat No 724 736 737 738
Bounded south by Proposed Residential Building
Bounded west by Gat No 106 742 Part

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerPharande Promoters and Builders
Registered office98/2, Tarangan, Pune Nasik Highway, Opp. Panjarpole Trust, Guruvihar Bhosari, Pune 411039
Registered agents 22 licensed agents may sell this project

Professionals named on the filing

Architect Anil Pawar & Associates
Architect Landmark Design Group
Engineer Nivas Salokhe
Engineer Shubham Devram Pawar
Chartered Accountant CA Jayant Daharwal
Chartered Accountant G N Mantri & Associates 198137

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

25 May 2022 is when an advocate last certified the title to this land
Title report TITLE REPORT REVISED.pdf 25 May 2022
Promoter's declaration, Form B FORM-B.pdf 6 May 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100045598
Promoter Pharande Promoters and Builders
Project typeResidential / Group Housing · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on21 May 2022
Registered on26 May 2022
Completion, as first filed30 June 2027
Due30 June 2027
Units declared69
Units sold 67 of 69 sold (97%), 2 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 26 May 2022
Application referenceREA52100110511
Current statusActive
Record last changed 26 May 2022 · over 4 years ago 4 years untouched

Where the sold count comes from, and whether it holds up. 67 of 69 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 69 flats and reaches the same answer — 67 sold, 66 of them with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 26 May 2022.

MahaRERA has not recorded a change to this project's record in 4 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Vaanya Cluster C registered with MahaRERA?
Yes. It is registered as P52100045598, filed on 26 May 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Vaanya Cluster C due to be handed over?
The promoter has told MahaRERA June 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Vaanya Cluster C been delayed?
No. June 2027 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Vaanya Cluster C?
A median of ₹8,187 per square foot of carpet, across 67 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Vaanya Cluster C?
2 of 69 were still unsold at the promoter's last filing, in 2 BHK, from 662 sq ft of carpet.
Are there complaints against Vaanya Cluster C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Vaanya Cluster C?
Pharande Promoters and Builders, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 30 October 2026. The authority's own registry page for P52100045598 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Alandi

Stock image, not a photograph of Skyline Pride Stock image
Registered here
₹5,206
On offer
1 BHK
Under construction

Skyline Pride

Ajit Dnyaneshwar Pawar · Alandi

65 sold
Slipped 3.3 years
Due
Oct 2026
Units
43
Carpet
461
Sold at
₹24 lakh
P52100028847
Stock image, not a photograph of Skyways Pratham Stock image
Registered here
₹5,673
On offer
1, 2, 3 BHK
Under construction

Skyways Pratham

M/s Malhar Promoters and Land Developers LLP · Alandi

31 sold
Slipped 16 months
Due
Apr 2028
Units
189
Carpet
323–999
Sold at
₹34.3 lakh
P52100051577