Z Zomefy

RERA registered P52100028847 Active

Skyline Pride

Alandi, Pune · Residential / Group Housing by Ajit Dnyaneshwar Pawar

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Skyline Pride in Alandi is MahaRERA-registered (P52100028847) and still under construction, with possession filed for October 2026. Buyers have already registered 28 sales here at a median ₹5,206 per sq ft of carpet — not an asking price. About 65% of the 43 units are sold. Ajit Dnyaneshwar Pawar is the promoter.

Stock image, not a photograph of Skyline Pride Stock image
Where
Alandi
pincode 412105
Sold here at
₹5,206
per sq ft, 28 registered sales
Available
1 BHK
3 left · 461 sq ft
Now due
Oct 2026
3.3 years later than first promised
A stock photograph, not Skyline Pride. We have no picture of this site yet.

Where this is

Alandi, PCMC, Pune, 412105

Village
Pimpri Chinchawad (M Corp.)
Taluka
Haveli
Pincode
412105

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 43 flats are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 43 units · 3 available

43 units 461 sq ft 42.83 sq m as filed
Units sold

28 / 43

Selling steadily

65% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 43 flats · 3 available

461 sq ft carpet as drawn

Carpet, filed
461 sq ft
Built-up
about 553 sq ft
Super built-up
about 645 sq ft
Every room in this flat

Living and dining about 173 sq ft, Master bedroom about 115 sq ft, Kitchen about 69 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,206 per sq ft of carpet, median of 28 registered sales
Range across those sales ₹3,742 to ₹6,074 per sq ft
Sold and booked 28 sold, 0 booked
Still available 3 flats, 461 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2023
Current status Due Oct 2026

Revised projection

The completion date has moved from June 2023 to October 2026, 3.3 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

gat no 272, hissa no. 1/2 is the plot this project is built on, as filed
Revenue village Pimpri Chinchawad (M Corp.) · shown on this site as Alandi
TalukaHaveli
Street, as filed NASHIK-PUNE HIGHWAY
Bounded north by road
Bounded east by property of shree ramesh babban gayakwad
Bounded south by property of shree pandit gayakwad
Bounded west by property of shree dashrath gayakwad

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAjit Dnyaneshwar Pawar
Registered officeGat No 272, 1/2, Rasgandh Developer, Borhadewadi, Moshi, Pimpari Chinchwad, Pune 412105

Professionals named on the filing

Architect Makarand Ittam CA/2011/54198
Engineer Priti A Patil EN17-31915
Chartered Accountant CA Viren Pokar 157639
Chartered Accountant Prasant Patel 162482

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

1 April 2021 is when an advocate last certified the title to this land
Title report SEARCH REPORT - NEW_compressed.pdf 1 April 2021
Promoter's declaration, Form B FORM-B- CO-PROMOTERS.pdf 8 July 2024 3 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100028847
Promoter Ajit Dnyaneshwar Pawar
Project typeResidential / Group Housing · Building development
LocalityAlandi — Haveli taluka, pincode 412105
Applied on14 March 2021
Registered on05 April 2021
Completion, as first filed30 June 2023
Due31 October 2026 3.3 years later
Units declared43
Units sold 28 of 43 sold (65%), 15 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 15 May 2026
Application referenceREA52100086592
Current statusActive
Record last changed 15 May 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 28 of 43 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 43 flats and reaches the same answer — 28 sold, every one with money recorded as received against a named flat, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 May 2026.

Common questions

Is Skyline Pride registered with MahaRERA?
Yes. It is registered as P52100028847, filed on 05 April 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Skyline Pride due to be handed over?
The promoter has told MahaRERA October 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Skyline Pride been delayed?
Yes. The first date filed was June 2023. It now stands at October 2026, 3.3 years later.
What did buyers actually pay in Skyline Pride?
A median of ₹5,206 per square foot of carpet, across 28 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Skyline Pride?
3 of 43 were still unsold at the promoter's last filing, in 1 BHK, from 461 sq ft of carpet.
Are there complaints against Skyline Pride?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Skyline Pride?
Ajit Dnyaneshwar Pawar, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100028847 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Alandi

Stock image, not a photograph of Dnyanvishwa Stock image
Registered here
₹4,461
On offer
1, 2 BHK
Under construction

Dnyanvishwa

Dattakrupa Associates · Alandi

36 sold
Slipped 6.1 years
Due
Dec 2030
Units
239
Carpet
399–433
Sold at
₹19.7 lakh
P52100014850
Stock image, not a photograph of Dwaarka Avenue Stock image
Registered here
₹5,240
On offer
2 BHK
Under construction

Dwaarka Avenue

Monarch Developers · Alandi

79 sold
Slipped a year
Due
Mar 2027
Units
28
Carpet
736–744
Sold at
₹38.8 lakh
P52100055016