Z Zomefy

RERA registered P52100046513 Active

Songs From The Wood -Phase 2

Wanowrie, Pune · Residential / Group Housing by Total Environment Building Systems Private Limited

Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.

In short

Songs From The Wood -Phase 2 in Wanowrie is MahaRERA-registered (P52100046513) and still under construction, with possession filed for December 2029. Buyers have already registered 21 sales here at a median ₹18,117 per sq ft of carpet — not an asking price. About 26% of the 80 units are sold. 4 complaints sit on the filing. Total Environment Building Systems Private Limited is the promoter.

Stock image, not a photograph of Songs From The Wood -Phase 2 Stock image
Where
Wanowrie
pincode 411013
Sold here at
₹18,117
per sq ft, 21 registered sales
Available
3 BHK
29 left · 1,445–2,511 sq ft
Possession
Dec 2029
as filed with MahaRERA
A stock photograph, not Songs From The Wood -Phase 2. We have no picture of this site yet.

Where this is

Wanowrie, PMC, Pune, 411013

Street map of Wanowrie centred on the coordinate filed for Songs From The Wood -Phase 2, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
wanwadi
Taluka
Haveli
Pincode
411013
Coordinates
18.511151, 73.905217

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 80 flats are filed unit by unit with the authority, the highest on floor 27. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 80 units · 29 available

64 units 1445 sq ft 134.24 sq m as filed
16 units 2511 sq ft 233.28 sq m as filed
Units sold

21 / 80

Early sales

26% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 80 flats · 29 available

1,445 sq ft carpet as drawn, from 1,445–2,511 sq ft filed in this configuration

Carpet, filed
1,445 sq ft
Built-up
about 1,734 sq ft
Super built-up
about 2,023 sq ft
Every room in this flat

Living and dining about 355 sq ft, Master bedroom about 237 sq ft, Second bedroom about 190 sq ft, Third bedroom about 154 sq ft, Kitchen about 142 sq ft, Bath about 83 sq ft, Balcony about 83 sq ft, Second bath about 71 sq ft, Passage about 71 sq ft, Third bath about 59 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹18,117 per sq ft of carpet, median of 21 registered sales
Range across those sales ₹12,991 to ₹30,373 per sq ft
Sold and booked 11 sold, 10 booked
Still available 29 flats, 1445–2511 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2029
Current status Due Dec 2029

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 28/1 to 20/A 1/2B is the plot this project is built on, as filed
Revenue village wanwadi · shown on this site as Wanowrie
TalukaHaveli
Street, as filed Bhagwan Tatyasaheb Kawade Rd
Bounded north by 12 M Wide Proposed DP Road
Bounded east by Private Property
Bounded south by Adjacent Canel
Bounded west by Adj Survey No - 83

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerTotal Environment Building Systems Private Limited
Registered officeSurvey.No. 13/56A/57A, Total Environment, Bhagwan Tatyasaheb Kawade Road, Near Orange Blossom Special, Uday Baug, Pune 411013

Professionals named on the filing

Architect Jagdish P Deshpande Architects
Architect Shibanee & Kamal Architects 667A
Architect Vishal J Deshpande 0
Engineer Shibanee & Kamal Architects 667A
Engineer Surendra Kumar Sagar
Engineer Total Environment 667A
Chartered Accountant SAJ and Company 067926
Chartered Accountant Suresh Surana & Associates LLP 215814

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

4 cases against this project, 4 with an order on record, filed between Feb 2026 and Mar 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
SM12600189 Mar 2026 Order passed Mar 2026
SM12600193 Mar 2026 Order passed Mar 2026
SM12600118 Feb 2026 Order passed Feb 2026
SM12600121 Feb 2026 Order passed Feb 2026

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

5 August 2022 is when an advocate last certified the title to this land
Title report download (14).pdf 5 August 2022
Promoter's declaration, Form B Promoter -Form B Total_compressed.pdf 2 July 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100046513
Promoter Total Environment Building Systems Private Limited
Project typeResidential / Group Housing · Building development
LocalityWanowrie — Haveli taluka, pincode 411013
Applied on04 July 2022
Registered on10 August 2022
Completion, as first filed31 December 2029
Due31 December 2029
Units declared80
Units sold 21 of 80 sold (26%), 59 still unsold
Complaints4 on record with MahaRERA
Certificate on file Corrected certificate, issued 14 August 2026
Application referenceREA52100114750
Current statusActive
Record last changed 01 November 2025 · 10 months ago

Where the sold count comes from, and whether it holds up. 21 of 80 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 80 flats and reaches the same answer — 11 sold, every one with money recorded as received against a named flat, 10 booked with a price agreed but nothing received yet, and 29 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 01 November 2025.

Common questions

Is Songs From The Wood -Phase 2 registered with MahaRERA?
Yes. It is registered as P52100046513, filed on 10 August 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Songs From The Wood -Phase 2 due to be handed over?
The promoter has told MahaRERA December 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Songs From The Wood -Phase 2 been delayed?
No. December 2029 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Songs From The Wood -Phase 2?
A median of ₹18,117 per square foot of carpet, across 21 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Songs From The Wood -Phase 2?
29 of 80 were still unsold at the promoter's last filing, in 3 BHK, from 1,445–2,511 sq ft of carpet.
Are there complaints against Songs From The Wood -Phase 2?
4 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Songs From The Wood -Phase 2?
Total Environment Building Systems Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100046513 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wanowrie

Stock image, not a photograph of Punde Heights Stock image
Nearby
₹10,523
On offer
1, 2 BHK
Under construction

Punde Heights

Pushkaraj Reality · Wanowrie

0 sold
Due
Dec 2027
Units
16
Carpet
487–608
Typical flat
~₹51.2 lakh
P52100079495