RERA registered P52100053194 Active
Yashwin Urbo Centro - Phase 1
Wakad, Pune · Others by Vilas Javdekar Infinitee Developers Pvt. Ltd.
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Yashwin Urbo Centro - Phase 1 in Wakad is MahaRERA-registered (P52100053194) and still under construction, with possession filed for April 2028. Buyers have already registered 689 sales here at a median ₹10,261 per sq ft of carpet — not an asking price. 1 complaint sits on the filing. Vilas Javdekar Infinitee Developers Pvt. Ltd. is the promoter.
- Sold here at
- ₹10,261
- per sq ft, 689 registered sales
- Available
- 2, 3, 4 BHK
- 7 left · 836–1,181 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Wakad, PCMC, Pune, 411057
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Unit sizes on file
All 704 units are filed unit by unit with the authority, the highest on floor 34. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 220 units · 2 available
3 BHK 423 units · 2 available
5 further sizes, 5 units between them
4 BHK 53 units · 3 available
Shops 8 units · all sold
670 / 704
95% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 220 units · 2 available
697 sq ft carpet as drawn, from 682–836 sq ft filed in this configuration
- Carpet, filed
- 697 sq ft
- Built-up
- about 836 sq ft
- Super built-up
- about 976 sq ft
Every room in this unit
Living and dining about 203 sq ft, Master bedroom about 135 sq ft, Second bedroom about 108 sq ft, Kitchen about 81 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 41 sq ft, Passage about 34 sq ft.
3 BHK 423 units · 2 available
1,044 sq ft carpet as drawn, from 864–1,058 sq ft filed in this configuration
- Carpet, filed
- 1,044 sq ft
- Built-up
- about 1,253 sq ft
- Super built-up
- about 1,462 sq ft
Every room in this unit
Living and dining about 257 sq ft, Master bedroom about 171 sq ft, Second bedroom about 137 sq ft, Third bedroom about 111 sq ft, Kitchen about 103 sq ft, Bath about 60 sq ft, Balcony about 60 sq ft, Second bath about 51 sq ft, Passage about 51 sq ft, Third bath about 43 sq ft.
4 BHK 53 units · 3 available
1,178 sq ft carpet as drawn, from 1,176–1,181 sq ft filed in this configuration
- Carpet, filed
- 1,178 sq ft
- Built-up
- about 1,414 sq ft
- Super built-up
- about 1,649 sq ft
Every room in this unit
Living and dining about 262 sq ft, Master bedroom about 175 sq ft, Second bedroom about 140 sq ft, Third bedroom about 113 sq ft, Kitchen about 105 sq ft, Fourth bedroom about 105 sq ft, Bath about 61 sq ft, Balcony about 61 sq ft, Passage about 61 sq ft, Second bath about 52 sq ft, Third bath about 44 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,162 to ₹14,106 per sq ft |
|---|---|
| Sold and booked | 697 sold, 0 booked |
| Still available | 7 units, 209–1181 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
7 further sales are set aside. They divide out beyond ₹25,652 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Wakad |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Pune |
| Bounded north by | Plot No A2 |
| Bounded east by | Mumbai-Bangalore Highway Service Road |
| Bounded south by | Survey No 114 and 121 |
| Bounded west by | Survey No 122 1 and 122 2 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Vilas Javdekar Infinitee Developers Pvt. Ltd. |
|---|---|
| Registered office | 306 , 307, 306, Siddharth Towers, S. No. 12/ 3B, Opposite Contacare Eye Hospital, Kothrud, Pune 411038 |
| Registered agents | 16 licensed agents may sell this project |
Professionals named on the filing
| Architect | AR Priya Honmute CA/2018/101709 |
|---|---|
| Architect | Asad ahmed CA/2023/158747 |
| Architect | Deepali Patidar CA/2017/83464 |
| Architect | Neha Bagayatkar CA/2018/101242 |
| Architect | Voussoirs CA/92/14618 |
| Engineer | Sagar Kale REG/PMC/STE/3343/25 |
| Chartered Accountant | Abhijit mundada 134685 |
| Chartered Accountant | Sunil Nimbalkar 197121 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12504265 | Dec 2025 | Order passed Dec 2025 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report YUC phase 1 TSR_W122_Pg 1 to 14.pdf | 14 September 2023 1 older version on file |
|---|---|
| Promoter's declaration, Form B YUC phase 1 Form B Promoter.pdf | 1 September 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100053194 |
| Promoter | Vilas Javdekar Infinitee Developers Pvt. Ltd. |
| Project type | Others · Building development |
| Locality | Wakad — Mulshi taluka, pincode 411057 |
| Applied on | 14 September 2023 |
| Registered on | 17 October 2023 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 704 |
| Units sold | 670 of 704 sold (95%), 34 still unsoldfilings disagree |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 12 August 2026 |
| Application reference | REA52100146581 |
| Current status | Active |
| Record last changed | 11 August 2025 · 14 months ago |
Where the sold count comes from, and whether it holds up. 670 of 704 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 670 of 704 sold, leaving 34. The unit-by-unit list they file separately covers 704 units and marks 697 sold with 7 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 11 August 2025.
Common questions
- Is Yashwin Urbo Centro - Phase 1 registered with MahaRERA?
- Yes. It is registered as P52100053194, filed on 17 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Yashwin Urbo Centro - Phase 1 due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Yashwin Urbo Centro - Phase 1 been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Yashwin Urbo Centro - Phase 1?
- A median of ₹10,261 per square foot of carpet, across 689 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Yashwin Urbo Centro - Phase 1?
- 7 of 704 were still unsold at the promoter's last filing, in 2, 3, 4 BHK, from 836–1,181 sq ft of carpet.
- Are there complaints against Yashwin Urbo Centro - Phase 1?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Yashwin Urbo Centro - Phase 1?
- Vilas Javdekar Infinitee Developers Pvt. Ltd., as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100053194 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Wakad
Stock image
- Valued from
- ₹9,285
- On offer
- Offices + shops
- Due
- Apr 2030
- Units
- 201
- Carpet
- 326–970
- Sold at
- ₹1.3 crore
Stock image
- Registered here
- ₹11,311
- On offer
- 2, 3 BHK + shops
Yashwin Urbo Centro Phase 2
3 complaints
- Due
- Oct 2029
- Units
- 1039
- Carpet
- 480–1,062
- Sold at
- ₹99.6 lakh
Stock image
- Due
- Jan 2028
- Units
- —
- Carpet
- —
- Typical flat
- —