Z Zomefy

RERA registered PC1260002600820 Active

The Vantage E

Wakad, Pune · Commercial by Kuber Properties

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

The Vantage E in Wakad is MahaRERA-registered (PC1260002600820) and still under construction, with possession filed for July 2031. No registered sale rate is on file for this project or its locality yet. None of the units are filed as sold yet. Kuber Properties is the promoter.

Stock image, not a photograph of The Vantage E Stock image
Where
Wakad
pincode 411057
Price
Not filed
no agreement or valuation on the register
Available
Office Space, Shops
2 left · 1,041–3,658 sq ft
Now due
Jul 2031
4 months later than first promised
A stock photograph, not The Vantage E. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Street map of Wakad centred on the coordinate filed for The Vantage E, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Wakad
Taluka
Mulshi
Pincode
411057
Coordinates
18.559050, 73.816893

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 6 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Office Space 4 units · 1 available

4 units 3658 sq ft 339.86 sq m as filed

Shops 2 units · 1 available

1 unit 1041 sq ft 96.69 sq m as filed
1 unit 1094 sq ft 101.63 sq m as filed
Units sold

0 / 6

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 4 units · 1 available

3,658 sq ft carpet as drawn

Carpet, filed
3,658 sq ft
Built-up
about 4,390 sq ft
Super built-up
about 5,121 sq ft

Shops 2 units · 1 available

1,041 sq ft carpet as drawn, from 1,041–1,094 sq ft filed in this configuration

Carpet, filed
1,041 sq ft
Built-up
about 1,249 sq ft
Super built-up
about 1,457 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Mar 2031
Current status Due Jul 2031

Revised projection

The completion date has moved from March 2031 to July 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

156/1/Pt is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed Wakad Gaon
Bounded north by Adjoining Plot
Bounded east by The Vantage A, B, C & D
Bounded south by Adjoining Plot
Bounded west by 18 meter Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKuber Properties
Registered officeOffice No. 106, 106, Chinar Heights, Prabhat Road, Opp. Lijjat Papad, Deccan Gymkhana, Pune 411004

Professionals named on the filing

Architect Promod Dube CA/2004/33731
Engineer Satish Deshpande
Chartered Accountant Pushpa Bogati 137351

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

20 May 2026 is when an advocate last certified the title to this land
Title report Legal title report.pdf 20 May 2026
Promoter's declaration, Form B form B VVBHALGAT THE VANTAGE E.pdf 20 May 2026
Annexure A declaration ANNEXURE A.pdf 20 May 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPC1260002600820
Promoter Kuber Properties
Project typeCommercial · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on21 May 2026
Registered on17 June 2026
Completion, as first filed19 March 2031
Due19 July 2031 4 months later
Units declared6
Units sold None sold yet, all 6 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 17 June 2026
Application referenceACK20052601057
Current statusActive
Record last changed 17 June 2026 · 4 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 6 units are gone, and the unit-by-unit list they file separately says the same: all 6 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 17 June 2026.

Common questions

Is The Vantage E registered with MahaRERA?
Yes. It is registered as PC1260002600820, filed on 17 June 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is The Vantage E due to be handed over?
The promoter has told MahaRERA July 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has The Vantage E been delayed?
Yes. The first date filed was March 2031. It now stands at July 2031, 4 months later.
How many units are left in The Vantage E?
2 of 6 were still unsold at the promoter's last filing, in Offices + shops, from 1,041–3,658 sq ft of carpet.
Are there complaints against The Vantage E?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building The Vantage E?
Kuber Properties, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for PC1260002600820 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad

Stock image, not a photograph of Sky Sanctum Stock image
Registered here
₹12,491
On offer
2, 3 BHK
Under construction

Sky Sanctum

Mohar Lifespaces LLP · Wakad

90 sold
Slipped 4 months
Due
Apr 2029
Units
60
Carpet
616–1,033
Sold at
₹1 crore
P52100079426
Stock image, not a photograph of Sky World Stock image
Registered here
₹8,576
On offer
2, 3 BHK + 1 RK
Under construction

Sky World

Siyaram Developers · Wakad

40 sold

1 complaint

Slipped a year
Due
Oct 2027
Units
115
Carpet
316–1,068
Sold at
₹85 lakh
P52100052484