Mihir Amara Phase 1

Wakad, Pune · Residential / Group Housing by Mihir Synthetics

Official record Updated from the register 23 October 2026. Anything filed since then is not here yet.

In short

Mihir Amara Phase 1 in Wakad is MahaRERA-registered (P52100033531) and still under construction, with possession filed for December 2026. Buyers have already registered 310 sales here at a median ₹8,770 per sq ft of carpet — not an asking price. About 99% of the 312 units are sold. 8 complaints sit on the filing. Mihir Synthetics is the promoter.

Stock image, not a photograph of Mihir Amara Phase 1 Stock image
Where
Wakad
pincode 411057
Sold here at
₹8,770
per sq ft, 310 registered sales
Available
2, 3 BHK
2 left · 754–1,101 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not Mihir Amara Phase 1. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Wakad · Mulshi

Wakad, PCMC, Pune, 411057

Taluka Mulshi
Pincode 411057

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 312 flats are filed unit by unit with the authority, the highest on floor 27. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
312 Total Licenced Units
Residential Typology • 0.6% of tower

1 BHK Residences

0 Available 2 registered total
Estimated Market Window ₹48.2 lakh
Locality Benchmark ₹8,770 / sq ft
Carpet Variations as Filed Span: 550 sq ft
550 sq ft 51.12 sq m 2 units
None available
Residential Typology • 22.4% of tower

2 BHK Residences

1 Available 70 registered total
Estimated Market Window ₹66.1 lakh – ₹68.8 lakh
Locality Benchmark ₹8,770 / sq ft
Carpet Variations as Filed Span: 754 to 784 sq ft
754 sq ft 70.05 sq m 46 units
784 sq ft 72.82 sq m 24 units
Govt ASR Base: ₹53.2 lakh 1 of 70 available
Dominant Typology • 76.9% of tower

3 BHK Residences

1 Available 240 registered total
Estimated Market Window ₹74.6 lakh – ₹1 crore
Locality Benchmark ₹8,770 / sq ft
Carpet Variations as Filed Span: 851 to 1150 sq ft
851 sq ft 79.07 sq m 4 units
1020 sq ft 94.77 sq m 24 units
1033 sq ft 95.96 sq m 1 unit
1101 sq ft 102.31 sq m 103 units
1150 sq ft 106.8 sq m 108 units
Govt ASR Base: ₹77.7 lakh 1 of 240 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
1 BHK 550 sq ft (51.12 sq m) ~660 sq ft ~770 sq ft 0 left of 2
2 BHK 754 – 784 sq ft (70.05 – 72.82 sq m) ~905 – 941 sq ft ~1056 – 1098 sq ft 1 left of 70
3 BHK 851 – 1150 sq ft (79.07 – 106.8 sq m) ~1021 – 1380 sq ft ~1191 – 1610 sq ft 1 left of 240
Units sold

310 / 312

Nearly sold out

99% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 2 flats · none available

550 sq ft carpet as drawn

Carpet, filed
550 sq ft
Built-up
about 660 sq ft
Super built-up
about 770 sq ft
Every room in this flat

Living and dining about 206 sq ft, Master bedroom about 138 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Passage about 28 sq ft.

2 BHK 70 flats · 1 available

754 sq ft carpet as drawn, from 754–784 sq ft filed in this configuration

Carpet, filed
754 sq ft
Built-up
about 905 sq ft
Super built-up
about 1,056 sq ft
Every room in this flat

Living and dining about 220 sq ft, Master bedroom about 146 sq ft, Second bedroom about 117 sq ft, Kitchen about 88 sq ft, Bath about 51 sq ft, Balcony about 51 sq ft, Second bath about 44 sq ft, Passage about 37 sq ft.

3 BHK 240 flats · 1 available

1,150 sq ft carpet as drawn, from 851–1,150 sq ft filed in this configuration

Carpet, filed
1,150 sq ft
Built-up
about 1,380 sq ft
Super built-up
about 1,610 sq ft
Every room in this flat

Living and dining about 283 sq ft, Master bedroom about 189 sq ft, Second bedroom about 151 sq ft, Third bedroom about 123 sq ft, Kitchen about 113 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 47 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹8,770 per sq ft of carpet, median of 310 registered sales
Range across those sales ₹5,655 to ₹10,936 per sq ft
Sold and booked 310 sold, 0 booked
Still available 2 flats, 550–1150 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2026
Declared at registration
Current Statutory Date
Due
Dec 2026
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S. No. 153/1/A Part, 153/20, 21, 22, 24, 27, 31, 33, 34, 35 is the plot this project is built on, as filed
TalukaMulshi
Street, as filed Pune Mumbai Highway
Bounded north by Adjoining Building A1 and A2
Bounded east by Adjoining Building A4
Bounded south by Adjoining S No 153 Part
Bounded west by Adjoining Building B2

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMihir Synthetics
Registered office1, Amogh Apartments, Lane No 15, Near Symbiosis School, Prabhat Road, Pune 411004

Professionals named on the filing

Architect AB Architects CA/2006/38955
Architect Amit Bhat Architects
Engineer Satish Marathe Consulting Engineers
Engineer Suraaj Kathale
Chartered Accountant Ashish Rathi & Co 154212
Chartered Accountant M/S Anurag Meherwal And Co. 166503

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

8 cases against this project, 0 with an order on record, filed between Mar 2026 and Jul 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604341 Jul 2026 No order on record
CC12603279 May 2026 No order on record
CC12603075 May 2026 No order on record
CC12603019 May 2026 No order on record
CC12602367 Apr 2026 No order on record
CC12602358 Apr 2026 No order on record
CC12602359 Apr 2026 No order on record
CC12601876 Mar 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

11 October 2022 is when an advocate last certified the title to this land
Title report TITLE SEARCH REPORT -MHR 28092022_1.pdf 11 October 2022 2 older versions on file
Promoter's declaration, Form B Form B.pdf 14 February 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100033531
Promoter Mihir Synthetics
Project typeResidential / Group Housing · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on15 February 2022
Registered on22 February 2022
Completion, as first filed31 December 2026
Due31 December 2026
Units declared312
Units sold 310 of 312 sold (99%), 2 still unsold
Complaints8 on record with MahaRERA
Certificate on file Original registration certificate, issued 08 April 2022
Application referenceREA52100103462
Current statusActive
Record last changed 28 March 2022 · over 4 years ago 4 years untouched

Where the sold count comes from, and whether it holds up. 310 of 312 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 312 flats and reaches the same answer — 310 sold, every one with money recorded as received against a named flat, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 March 2022.

MahaRERA has not recorded a change to this project's record in 4 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Mihir Amara Phase 1 registered with MahaRERA?
Yes. It is registered as P52100033531, filed on 22 February 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Mihir Amara Phase 1 due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Mihir Amara Phase 1 been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in Mihir Amara Phase 1?
A median of ₹8,770 per square foot of carpet, across 310 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Mihir Amara Phase 1?
2 of 312 were still unsold at the promoter's last filing, in 2, 3 BHK, from 754–1,101 sq ft of carpet.
Are there complaints against Mihir Amara Phase 1?
8 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Mihir Amara Phase 1?
Mihir Synthetics, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 23 October 2026. The authority's own registry page for P52100033531 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Wakad

Stock image, not a photograph of Kohinoor Regalia Towers Stock image
Registered here
₹13,391
On offer
2, 3 BHK
Under construction

Kohinoor Regalia Towers

Godiva Buildcon Private Limited · Wakad

13 sold
Slipped 4 months
Due
Oct 2030
Units
148
Carpet
686–9,460
Sold at
₹1.3 crore
PR1260002500271