In short

Akshay Anantam in Wakad is MahaRERA-registered (P52100018878) and still under construction, with possession filed for March 2028. Buyers have already registered 158 sales here at a median ₹11,093 per sq ft of carpet — not an asking price. About 82% of the 194 units are sold. 13 complaints sit on the filing. Sneh Constructions is the promoter.

Stock image, not a photograph of Akshay Anantam Stock image
Where
Wakad
pincode 411057
Sold here at
₹11,093
per sq ft, 158 registered sales
Available
1 Room Kitchen, 1 BHK, 2 BHK
35 left · 150–556 sq ft
Now due
Mar 2028
4.6 years later than first promised
A stock photograph, not Akshay Anantam. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Village
Wakad
Taluka
Mulshi
Pincode
411057
Coordinates
18.595992, 73.762322

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 194 units are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 Room Kitchen 2 units · 1 available

2 units 150 sq ft 13.92 sq m as filed

1 BHK 106 units · 24 available

19 units 233 sq ft 21.63 sq m as filed
1 unit 260 sq ft 24.11 sq m as filed
21 units 275 sq ft 25.53 sq m as filed
2 units 277 sq ft 25.7 sq m as filed
50 units 350 sq ft 32.51 sq m as filed
13 units 357 sq ft 33.16 sq m as filed

2 BHK 85 units · 10 available

11 units 452 sq ft 42.0 sq m as filed
5 units 466 sq ft 43.29 sq m as filed
5 units 467 sq ft 43.36 sq m as filed
11 units 478 sq ft 44.43 sq m as filed
5 units 494 sq ft 45.87 sq m as filed
5 units 495 sq ft 45.96 sq m as filed
13 units 500 sq ft 46.49 sq m as filed
13 units 503 sq ft 46.72 sq m as filed
1 unit 530 sq ft 49.28 sq m as filed
1 unit 538 sq ft 50.01 sq m as filed
1 unit 553 sq ft 51.41 sq m as filed
13 units 556 sq ft 51.66 sq m as filed
1 unit 568 sq ft 52.76 sq m as filed

Shops 1 unit · all sold

1 unit 794 sq ft 73.75 sq m as filed
Units sold

159 / 194

Nearly sold out

82% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 Room Kitchen 2 units · 1 available

150 sq ft carpet as drawn

Carpet, filed
150 sq ft
Built-up
about 180 sq ft
Super built-up
about 210 sq ft
Every room in this unit

Living and sleeping about 90 sq ft, Kitchen about 30 sq ft, Bath about 16 sq ft, Balcony about 14 sq ft.

1 BHK 106 units · 24 available

350 sq ft carpet as drawn, from 233–357 sq ft filed in this configuration

Carpet, filed
350 sq ft
Built-up
about 420 sq ft
Super built-up
about 490 sq ft
Every room in this unit

Living and dining about 131 sq ft, Master bedroom about 88 sq ft, Kitchen about 52 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Passage about 18 sq ft.

2 BHK 85 units · 10 available

500 sq ft carpet as drawn, from 452–568 sq ft filed in this configuration

Carpet, filed
500 sq ft
Built-up
about 600 sq ft
Super built-up
about 700 sq ft
Every room in this unit

Living and dining about 146 sq ft, Master bedroom about 97 sq ft, Second bedroom about 78 sq ft, Kitchen about 58 sq ft, Bath about 34 sq ft, Balcony about 34 sq ft, Second bath about 29 sq ft, Passage about 24 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹11,093 per sq ft of carpet, median of 158 registered sales
Range across those sales ₹5,358 to ₹14,614 per sq ft
Sold and booked 159 sold, 0 booked
Still available 35 units, 150–794 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Aug 2023
Current status Due Mar 2028

Revised projection

The completion date has moved from August 2023 to March 2028, 4.6 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No 168/2 Part and 4 Part is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed Wakad Thergaon Road
Bounded north by S No 164 Cha 2 part and 3 part
Bounded east by By 45 mtr wide wakad thergaon road
Bounded south by S No 168 cha 5
Bounded west by S No 164 cha 2 part and 4 part

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSneh Constructions
Registered officeHouse No 4, House No.4, Akshay Center, Aundh Ravet Road, Near Mcdonalds, 16 No Bus Stop, Pune 411033

Professionals named on the filing

Architect Vastushilp CA/99/24888
Architect Vivek Garode
Engineer Jw Consultants LLP
Engineer Nitin Vijay Lale
Engineer Sayyed Mansoor Civil Engineers and Architects -
Chartered Accountant CA Siddhant Abhay Bhora 614922
Chartered Accountant SPCM & Associates 108970

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

13 cases against this project, 10 with an order on record, filed between Mar 2024 and Jul 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604301 Jul 2026 No order on record
CC12604034 Jun 2026 No order on record
CC12603670 Jun 2026 No order on record
CC12601583 Mar 2026 Order passed Mar 2026
CC12601434 Mar 2026 Order passed Mar 2026
CC12601419 Mar 2026 Order passed Mar 2026
CC12601420 Mar 2026 Order passed Mar 2026
CC12601421 Mar 2026 Order passed Mar 2026
CC12601280 Mar 2026 Order passed Mar 2026
CC12503187 Sep 2025 Order passed Sep 2025
Show the remaining 3 cases
CC005000000471450 Aug 2024 Order passed Aug 2024
CC005000000310549 Mar 2024 Order passed Mar 2024
CC005000000310551 Mar 2024 Order passed Mar 2024

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

10 April 2024 is when an advocate last certified the title to this land
Title report supp s and t 080424.pdf 10 April 2024 3 older versions on file
Promoter's declaration, Form B Form B.pdf 12 August 2024 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100018878
Promoter Sneh Constructions
Project typeOthers · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on04 December 2018
Registered on10 December 2018
Completion, as first filed28 August 2023
Due31 March 2028 4.6 years later
Units declared194
Units sold 159 of 194 sold (82%), 35 still unsold
Complaints13 on record with MahaRERA
Certificate on file Extension certificate, issued 13 August 2026
Application referenceREA52100047126
Current statusActive
Record last changed 13 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 159 of 194 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 194 units and reaches the same answer — 159 sold, 157 of them with money recorded as received against a named unit, and 35 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 August 2026.

Common questions

Is Akshay Anantam registered with MahaRERA?
Yes. It is registered as P52100018878, filed on 10 December 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Akshay Anantam due to be handed over?
The promoter has told MahaRERA March 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Akshay Anantam been delayed?
Yes. The first date filed was August 2023. It now stands at March 2028, 4.6 years later.
What did buyers actually pay in Akshay Anantam?
A median of ₹11,093 per square foot of carpet, across 158 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Akshay Anantam?
35 of 194 were still unsold at the promoter's last filing, in 1, 2 BHK + 1 RK, from 150–556 sq ft of carpet.
Are there complaints against Akshay Anantam?
13 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Akshay Anantam?
Sneh Constructions, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100018878 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad

Stock image, not a photograph of Arham Palazzo Stock image
Nearby
₹10,574
On offer
1 RK +2 more
New launch

Arham Palazzo

Vedant Infrastructures · Wakad

0 sold
Due
Jun 2029
Units
14
Carpet
240–2,215
Typical unit
~₹25.4 lakh
PM1260002602013
Stock image, not a photograph of Arise Capital Stock image
Valued from
₹9,375
On offer
Offices +2 more
Under construction

Arise Capital

Vinode Wakadkar Buildcon LLP · Wakad

0 sold
Slipped 4 months
Due
Jul 2030
Units
95
Carpet
211–6,681
Typical unit
~₹19.9 lakh
PC1260002600906