Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

A G Landmark in Wakad is MahaRERA-registered (P52100051063) and still under construction, with possession filed for April 2027. Buyers have already registered 96 sales here at a median ₹15,744 per sq ft of carpet — not an asking price. About 72% of the 133 units are sold. A G Landmarks is the promoter.

Stock image, not a photograph of A G Landmark Stock image
Where
Wakad
pincode 411057
Sold here at
₹15,744
per sq ft, 96 registered sales
Available
Hall, Office Space, Showroom
25 left · 123–5,457 sq ft
Now due
Apr 2027
4 months later than first promised
A stock photograph, not A G Landmark. We have no picture of this site yet.

Where this is

Wakad, PCMC, Pune, 411057

Street map of Wakad centred on the coordinate filed for A G Landmark, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Wakad
Taluka
Mulshi
Pincode
411057
Coordinates
18.590748, 73.751483

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 133 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration not filed 1 unit · all available

1 unit 5457 sq ft 506.96 sq m as filed

Hall 122 units · 18 available

12 units 123 sq ft 11.4–11.43 sq m as filed
6 units 145 sq ft 13.47 sq m as filed
86 units 169 sq ft 15.7 sq m as filed
18 units 179 sq ft 16.6–16.63 sq m as filed

Office Space 4 units · all available

4 units 4504 sq ft 418.42 sq m as filed

Showroom 6 units · 2 available

1 unit 381 sq ft 35.39 sq m as filed
2 units 3709 sq ft 344.57 sq m as filed
2 units 3831 sq ft 355.9 sq m as filed
1 unit 8219 sq ft 763.56 sq m as filed
Units sold

96 / 133

Selling steadily

72% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 4 units · 4 available

4,504 sq ft carpet as drawn

Carpet, filed
4,504 sq ft
Built-up
about 5,405 sq ft
Super built-up
about 6,306 sq ft

Showroom 6 units · 2 available

3,709 sq ft carpet as drawn, from 381–8,219 sq ft filed in this configuration

Carpet, filed
3,709 sq ft
Built-up
about 4,451 sq ft
Super built-up
about 5,193 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹15,744 per sq ft of carpet, median of 96 registered sales
Range across those sales ₹12,193 to ₹17,744 per sq ft
Sold and booked 96 sold, 0 booked
Still available 25 units, 123–8219 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2026
Current status Due Apr 2027

Revised projection

The completion date has moved from December 2026 to April 2027, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

47/2 is the plot this project is built on, as filed
Revenue village Wakad
TalukaMulshi
Street, as filed Wakad
Bounded north by S No 52 p
Bounded east by Sr no 47 p
Bounded south by 45 M Wide Road
Bounded west by S No 52 p

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerA G Landmarks
Registered officeSr No 127/1A, Sr No 127/A, Gaikwad Avenue, Off Iti Road, Aundh, Pune 411007

Professionals named on the filing

Architect Sangram Salunke CA/18/91601
Engineer Nitin Marne PCMC/SE/0011/2017
Chartered Accountant Pravin Pise 193912
Chartered Accountant Priyesh Prakash Jain 194983
Chartered Accountant nilesh raut 142319

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

27 March 2023 is when an advocate last certified the title to this land
Title report Legal title Report 22112022.pdf 27 March 2023
Promoter's declaration, Form B Form-B Affidavit 04092024.pdf 21 October 2024 2 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100051063
Promoter A G Landmarks
Project typeOthers · Building development
LocalityWakad — Mulshi taluka, pincode 411057
Applied on31 March 2023
Registered on22 May 2023
Completion, as first filed31 December 2026
Due30 April 2027 4 months later
Units declared133
Units sold 96 of 133 sold (72%), 37 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 22 May 2023
Application referenceREA52100135220
Current statusActive
Record last changed 13 September 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 96 of 133 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 133 units and reaches the same answer — 96 sold, every one with money recorded as received against a named unit, and 25 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 13 September 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is A G Landmark registered with MahaRERA?
Yes. It is registered as P52100051063, filed on 22 May 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is A G Landmark due to be handed over?
The promoter has told MahaRERA April 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has A G Landmark been delayed?
Yes. The first date filed was December 2026. It now stands at April 2027, 4 months later.
What did buyers actually pay in A G Landmark?
A median of ₹15,744 per square foot of carpet, across 96 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in A G Landmark?
25 of 133 were still unsold at the promoter's last filing, in Hall +2 more, from 123–5,457 sq ft of carpet.
Are there complaints against A G Landmark?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building A G Landmark?
A G Landmarks, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100051063 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Wakad

Stock image, not a photograph of Anp Bizsquare Stock image
Valued from
₹7,955
On offer
Offices + shops
Under construction

Anp Bizsquare

Five Star Vighnesh Associates (Aop) · Wakad

49 sold
Slipped 14 months
Due
Nov 2026
Units
68
Carpet
215–1,023
Sold at
₹49.3 lakh
P52100055995