Tech Tower

Viman Nagar, Pune · Commercial by Raisoni Properties

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Tech Tower in Viman Nagar is MahaRERA-registered (P52100054776) and still under construction, with possession filed for April 2029. No registered sale rate is on file for this project or its locality yet. Raisoni Properties is the promoter.

Stock image, not a photograph of Tech Tower Stock image
Where
Viman Nagar
pincode 411014
Price
Not filed
no agreement or valuation on the register
Available
Office Space
11 left · 1,055–1,787 sq ft
Now due
Apr 2029
16 months later than first promised
A stock photograph, not Tech Tower. We have no picture of this site yet.

Where this is

Viman Nagar, PMC, Pune, 411014

Street map of Viman Nagar centred on the coordinate filed for Tech Tower, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Taluka
Haveli
Pincode
411014
Coordinates
18.522833, 73.932204

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 17 units are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Office Space 17 units · 11 available

1 unit 1055 sq ft 98.0 sq m as filed
1 unit 1787 sq ft 166.0 sq m as filed

15 units have no usable carpet area on file, so they are counted above but not drawn.

Units sold

3 / 17

Early sales

18% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Office Space 17 units · 11 available

1,055 sq ft carpet as drawn, from 1,055–1,787 sq ft filed in this configuration

Carpet, filed
1,055 sq ft
Built-up
about 1,266 sq ft
Super built-up
about 1,477 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2029

Revised projection

The completion date has moved from December 2027 to April 2029, 16 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No 60/5, Plot No. B, Kharadi 411014 is the plot this project is built on, as filed
Street, as filed Survey No 60/5, Plot No. B of village Kharadi , Taluka – Pune City, Pune-411014
Bounded north by By land bearing Survey No 60 1
Bounded east by By Development Plan Road bearing Survey No 61
Bounded south by By remaining land out of Survey No 60 5
Bounded west by By remaining land out of Survey No 60 5

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRaisoni Properties
Registered office207, Time Square, Satara Road, Pune 411037

Professionals named on the filing

Architect Parvez Jamadar & Associates 356
Engineer Rohinee Engineers PCMC/LE/0651/2017
Engineer Yogesh Shinde NA
Chartered Accountant Pravin Pise & Associates 193912
Chartered Accountant Vaibhav s Bhise 608997

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

4 December 2023 is when an advocate last certified the title to this land
Title report lEGAL TITLE rAISONI.pdf 4 December 2023
Promoter's declaration, Form B GetUserDocumentFileContent (9) (2).pdf 19 March 2025 3 older versions on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100054776
Promoter Raisoni Properties
Project typeCommercial · Building development
LocalityViman Nagar — Haveli taluka, pincode 411014
Applied on06 December 2023
Registered on12 February 2024
Completion, as first filed31 December 2027
Due30 April 2029 16 months later
Units declared17
Units sold 3 of 17 sold (18%), 14 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 14 August 2026
Application referenceREA52100150305
Current statusActive
Record last changed 22 November 2025 · 10 months ago

Where the sold count comes from, and whether it holds up. 3 of 17 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 3 of 17 sold, leaving 14. The unit-by-unit list they file separately covers 17 units and marks 6 sold with 11 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 22 November 2025.

Common questions

Is Tech Tower registered with MahaRERA?
Yes. It is registered as P52100054776, filed on 12 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Tech Tower due to be handed over?
The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Tech Tower been delayed?
Yes. The first date filed was December 2027. It now stands at April 2029, 16 months later.
How many units are left in Tech Tower?
11 of 17 were still unsold at the promoter's last filing, in Offices, from 1,055–1,787 sq ft of carpet.
Are there complaints against Tech Tower?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Tech Tower?
Raisoni Properties, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100054776 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.