RERA registered P52100079826 Active
Gauri Nandan Apartments
Vadgaon Maval, Pune · Mixed by VC Bace Constrotech LLP
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Gauri Nandan Apartments in Vadgaon Maval is MahaRERA-registered (P52100079826) and still under construction, with possession filed for April 2028. Buyers have already registered 8 sales here at a median ₹7,363 per sq ft of carpet — not an asking price. VC Bace Constrotech LLP is the promoter.
- Sold here at
- ₹7,363
- per sq ft, 8 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 10 left · 110–488 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Vadgaon Maval, Maval, Pune, 412106
The promoter filed a coordinate that falls outside Pune district, so it is not used here. The link above searches Maps by name and locality instead.
Unit sizes on file
All 24 units are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 10 units · 3 available
2 BHK 10 units · 3 available
Shops 4 units · all available
2 / 24
8% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 10 units · 3 available
261 sq ft carpet as drawn, from 253–261 sq ft filed in this configuration
- Carpet, filed
- 261 sq ft
- Built-up
- about 313 sq ft
- Super built-up
- about 365 sq ft
Every room in this unit
Living and dining about 98 sq ft, Master bedroom about 65 sq ft, Kitchen about 39 sq ft, Bath about 23 sq ft, Balcony about 23 sq ft, Passage about 13 sq ft.
2 BHK 10 units · 3 available
461 sq ft carpet as drawn, from 461–488 sq ft filed in this configuration
- Carpet, filed
- 461 sq ft
- Built-up
- about 553 sq ft
- Super built-up
- about 645 sq ft
Every room in this unit
Living and dining about 134 sq ft, Master bedroom about 90 sq ft, Second bedroom about 72 sq ft, Kitchen about 54 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Second bath about 27 sq ft, Passage about 22 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,313 to ₹11,092 per sq ft |
|---|---|
| Sold and booked | 8 sold, 0 booked |
| Still available | 10 units, 110–488 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Wadagaon (CT) · shown on this site as Vadgaon Maval |
|---|---|
| Taluka | Mawal |
| Street, as filed | Mauje Vadgaon |
| Bounded north by | Survey No 107 |
| Bounded east by | Plot No 1 |
| Bounded south by | 9 Meter Road |
| Bounded west by | Plot No 3 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | VC Bace Constrotech LLP |
|---|---|
| Registered office | Survey No 749 Office No 206, 749, Spectra, Kothrud, Pune 411038 |
Professionals named on the filing
| Architect | Shubhankar Manoj Tak CA/2019/111822 |
|---|---|
| Engineer | Vikas Kamble NPVMN/R/2024/APL/00126 |
| Engineer | Yogesh Shinde STATE/R/2025/APL/22669 |
| Chartered Accountant | CA Priyesh Jain 194983 |
| Chartered Accountant | Nilesh Raut 137790 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Legal Title Report 25122024.pdf | 23 January 2025 |
|---|---|
| Promoter's declaration, Form B Form-B Affidavit (Promoter).pdf | 23 January 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100079826 |
| Promoter | VC Bace Constrotech LLP |
| Project type | Mixed · Building development |
| Locality | Vadgaon Maval — Mawal taluka, pincode 412106 |
| Applied on | 28 January 2025 |
| Registered on | 27 March 2025 |
| Completion, as first filed | 30 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 24 |
| Units sold | 2 of 24 sold (8%), 22 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100167633 |
| Current status | Active |
| Record last changed | 25 March 2026 · 6 months ago |
Where the sold count comes from, and whether it holds up. 2 of 24 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 2 of 24 sold, leaving 22. The unit-by-unit list they file separately covers 24 units and marks 8 sold with 10 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 25 March 2026.
Common questions
- Is Gauri Nandan Apartments registered with MahaRERA?
- Yes. It is registered as P52100079826, filed on 27 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Gauri Nandan Apartments due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Gauri Nandan Apartments been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Gauri Nandan Apartments?
- A median of ₹7,363 per square foot of carpet, across 8 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Gauri Nandan Apartments?
- 10 of 24 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 110–488 sq ft of carpet.
- Are there complaints against Gauri Nandan Apartments?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Gauri Nandan Apartments?
- VC Bace Constrotech LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100079826 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Vadgaon Maval
Stock image
- Nearby
- ₹5,364–5,479
- On offer
- 1, 2 BHK + shops
- Due
- Apr 2030
- Units
- 27
- Carpet
- 104–517
- Typical unit
- ~₹28 lakh
Stock image
- Nearby
- ₹5,364
- On offer
- 2 BHK + shops
- Due
- Dec 2029
- Units
- 56
- Carpet
- 181–550
- Typical unit
- ~₹21 lakh
Stock image
- Nearby
- ₹5,479
- On offer
- 1 BHK
- Due
- Jul 2027
- Units
- 16
- Carpet
- 337–341
- Typical flat
- ~₹18.4 lakh