RERA registered P52100049330 Active
Mayuri Adhinathpuram
Undri, Pune · Residential / Group Housing by Mayuri Landmarksllp
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Mayuri Adhinathpuram in Undri is MahaRERA-registered (P52100049330) and still under construction, with possession filed for December 2028. Buyers have already registered 245 sales here at a median ₹7,045 per sq ft of carpet — not an asking price. Mayuri Landmarksllp is the promoter.
- Sold here at
- ₹7,045
- per sq ft, 245 registered sales
- Available
- 1, 2 BHK
- 88 left · 347–632 sq ft
- Now due
- Dec 2028
- a year later than first promised
Where this is
Undri, PMC, Pune, 411060
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 341 flats are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 136 units · 19 available
2 BHK 205 units · 69 available
137 / 341
40% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 136 flats · 19 available
447 sq ft carpet as drawn, from 231–478 sq ft filed in this configuration
- Carpet, filed
- 447 sq ft
- Built-up
- about 536 sq ft
- Super built-up
- about 626 sq ft
Every room in this flat
Living and dining about 168 sq ft, Master bedroom about 112 sq ft, Kitchen about 67 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Passage about 22 sq ft.
2 BHK 205 flats · 69 available
630 sq ft carpet as drawn, from 372–632 sq ft filed in this configuration
- Carpet, filed
- 630 sq ft
- Built-up
- about 756 sq ft
- Super built-up
- about 882 sq ft
Every room in this flat
Living and dining about 183 sq ft, Master bedroom about 122 sq ft, Second bedroom about 98 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,463 to ₹14,854 per sq ft |
|---|---|
| Sold and booked | 243 sold, 10 booked |
| Still available | 88 flats, 231–632 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to December 2028, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | UNDRI · shown on this site as Undri |
|---|---|
| Taluka | Haveli |
| Street, as filed | WADACHI WADI ROAD |
| Bounded north by | BY COMMON ROAD AND SR NO 54 |
| Bounded east by | BY PROPERTY OF SR NO53 H NO 9 |
| Bounded south by | BY PART OF S NO45 AND COMMON ROAD |
| Bounded west by | BY PROPERTY OF SR NO53 H NO 7 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Mayuri Landmarksllp |
|---|---|
| Registered office | Sr No 53/8, Mayuri Landmarks LLP, Wadachiwadi, Maharashtra, Undri, Pune 411060 |
Professionals named on the filing
| Architect | Mr Jaideepdeshpande CA/ 2003/31278 |
|---|---|
| Engineer | Mr Milind Kulkarni |
| Engineer | Rohinee Badgujar PCMC/LE/0651/2017 |
| Engineer | Rupesh Subhash Bamane NA |
| Chartered Accountant | Pravin Pise 193912 |
| Chartered Accountant | S D Medadkar & Co 040590 |
| Chartered Accountant | Vaibhav S Bhise 608997 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A Legal Title Report.pdf | 30 January 2023 3 older versions on file |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 26 December 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100049330 |
| Promoter | Mayuri Landmarksllp |
| Project type | Residential / Group Housing · Building development |
| Locality | Undri — Haveli taluka, pincode 411060 |
| Applied on | 16 November 2022 |
| Registered on | 07 February 2023 |
| Completion, as first filed | 31 December 2027 |
| Due | 31 December 2028 a year later |
| Units declared | 341 |
| Units sold | 137 of 341 sold (40%), 204 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 20 August 2026 |
| Application reference | REA52100123447 |
| Current status | Active |
| Record last changed | 12 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 137 of 341 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 137 of 341 sold, leaving 204. The unit-by-unit list they file separately covers 341 flats and marks 243 sold with 88 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 12 May 2026.
Common questions
- Is Mayuri Adhinathpuram registered with MahaRERA?
- Yes. It is registered as P52100049330, filed on 07 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Mayuri Adhinathpuram due to be handed over?
- The promoter has told MahaRERA December 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Mayuri Adhinathpuram been delayed?
- Yes. The first date filed was December 2027. It now stands at December 2028, a year later.
- What did buyers actually pay in Mayuri Adhinathpuram?
- A median of ₹7,045 per square foot of carpet, across 245 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Mayuri Adhinathpuram?
- 88 of 341 were still unsold at the promoter's last filing, in 1, 2 BHK, from 347–632 sq ft of carpet.
- Are there complaints against Mayuri Adhinathpuram?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Mayuri Adhinathpuram?
- Mayuri Landmarksllp, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100049330 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Undri
Stock image
- Registered here
- ₹7,210
- On offer
- 2, 3 BHK + shops
- Due
- Dec 2028
- Units
- 35
- Carpet
- 224–916
- Sold at
- ₹66.1 lakh
Stock image
- Registered here
- ₹6,018
- On offer
- 2, 3 BHK + shops
- Due
- Sep 2030
- Units
- 113
- Carpet
- 157–1,124
- Sold at
- ₹38.2 lakh
Stock image
- Nearby
- ₹7,528
- On offer
- 2 BHK
- Due
- Dec 2029
- Units
- 8
- Carpet
- 673–694
- Typical flat
- ~₹51.5 lakh