RERA registered PR1260002502170 Active
Malhar Aarambh
Undri, Pune · Residential / Group Housing by Malhar Enterprises
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Malhar Aarambh in Undri is MahaRERA-registered (PR1260002502170) and still under construction, with possession filed for April 2030. No sales are registered in this project yet. Units the same size elsewhere in Undri have registered at ₹7,608 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Malhar Enterprises is the promoter.
- Nearby at
- ₹7,608
- per sq ft, same sizes in Undri
- Available
- 2 BHK
- 8 left · 673–694 sq ft
- Now due
- Apr 2030
- 4 months later than first promised
Where this is
Undri, PMC, Pune, 411060
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 8 flats are filed unit by unit with the authority, the highest on floor 2. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 8 units · all available
0 / 8
0% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 8 flats · 8 available
673 sq ft carpet as drawn, from 673–694 sq ft filed in this configuration
- Carpet, filed
- 673 sq ft
- Built-up
- about 808 sq ft
- Super built-up
- about 942 sq ft
Every room in this flat
Living and dining about 196 sq ft, Master bedroom about 131 sq ft, Second bedroom about 105 sq ft, Kitchen about 78 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 39 sq ft, Passage about 33 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Malhar Aarambh yet. The promoter has filed no agreement values, so nothing below is this project's own price.
| On sale here | Registered in Undri | Which for this size is |
|---|---|---|
| 2 BHK 673–694 sq ft | ₹7,608/sq ft 2525 sales, 29 projects | ₹51.2 lakh–₹52.8 lakh middle half ₹6,896–8,564/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Undri, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Undri.
The state values these at ₹5,030 per sq ft of carpet — one rate across all 8 still available, which puts the smallest at ₹33.9 lakh and the largest at ₹34.9 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | UNDRI · shown on this site as Undri |
|---|---|
| Taluka | Haveli |
| Street, as filed | Undri |
| Bounded north by | 12 mtr. wide road |
| Bounded east by | 9 mtr. wide road |
| Bounded south by | Plot No. 5 |
| Bounded west by | Adjoining S. no. 53/5 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Malhar Enterprises |
|---|---|
| Registered office | Office No. 320, F P No. 493, Patil Plaza, Parvati, Mitramandal Chowk, Pune 411009 |
Professionals named on the filing
| Architect | Tanay Manoj Kanase CA/2020/120727 |
|---|---|
| Engineer | Rajkumar C Chigdole |
| Chartered Accountant | Deokar Yadav & Associates 172409 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search Report Format A 08012026.pdf | 8 January 2026 |
|---|---|
| Conveyance deed 7-12 extract.pdf | 2 December 2025 |
| Promoter's declaration, Form B Form B Promoter.pdf | 2 December 2025 |
| Annexure A declaration Order 50 Annex A Declaration Cum Undertaking.pdf | 2 December 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1260002502170 |
| Promoter | Malhar Enterprises |
| Project type | Residential / Group Housing · Building development |
| Locality | Undri — Haveli taluka, pincode 411060 |
| Applied on | 02 December 2025 |
| Registered on | 23 January 2026 |
| Completion, as first filed | 30 December 2029 |
| Due | 30 April 2030 4 months later |
| Units declared | 8 |
| Units sold | None sold yet, all 8 on the market |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 23 January 2026 |
| Application reference | ACK27112504903 |
| Current status | Active |
| Record last changed | 23 January 2026 · 8 months ago |
Nothing has sold yet. The promoter's quarterly progress report says none of the 8 flats are gone, and the unit-by-unit list they file separately says the same: all 8 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 23 January 2026.
Common questions
- Is Malhar Aarambh registered with MahaRERA?
- Yes. It is registered as PR1260002502170, filed on 23 January 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Malhar Aarambh due to be handed over?
- The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Malhar Aarambh been delayed?
- Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
- What does a flat in Malhar Aarambh cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Undri have registered at ₹7,608 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Malhar Aarambh?
- 8 of 8 were still unsold at the promoter's last filing, in 2 BHK, from 673–694 sq ft of carpet.
- Are there complaints against Malhar Aarambh?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Malhar Aarambh?
- Malhar Enterprises, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for PR1260002502170 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Undri
Stock image
- Valued from
- ₹8,106
- On offer
- Offices + showroom
- Due
- Sep 2029
- Units
- 30
- Carpet
- 344–4,499
- Typical unit
- ~₹45.8 lakh
Stock image
- Registered here
- ₹7,210
- On offer
- 2, 3 BHK + shops
- Due
- Apr 2029
- Units
- 35
- Carpet
- 224–916
- Sold at
- ₹66.1 lakh
Stock image
- Registered here
- ₹6,018
- On offer
- 2, 3 BHK + shops
- Due
- Sep 2030
- Units
- 113
- Carpet
- 157–1,124
- Sold at
- ₹38.2 lakh