Z Zomefy

Registration ended P52100077186 Lapsed

Samarth Paradise

Tathawade, Pune · Residential / Group Housing by Samarth Associates

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

This registration has lapsed. MahaRERA ends a registration when the completion date passes with no extension filed, and that is what has happened here — the date was August 2026. Construction may well be continuing, and a lapse is not a finding against the builder. It does mean the register no longer stands behind the dates and unit counts below, and that the RERA protections you would be buying under are not currently in force. Everything on this page is the promoter's last filing, kept here because it is the record of what was promised.

In short

Samarth Paradise in Tathawade was MahaRERA-registered as P52100077186, but that registration has lapsed. Buyers have already registered 6 sales here at a median ₹10,726 per sq ft of carpet — not an asking price. Samarth Associates is the promoter.

Stock image, not a photograph of Samarth Paradise Stock image
Where
Tathawade
pincode 411033
Sold here at
₹10,726
per sq ft, 6 registered sales
Available
2 BHK
2 left · 447 sq ft
Was due
Aug 2026
36 days past its date, not handed over
A stock photograph, not Samarth Paradise. We have no picture of this site yet.

Where this is

Tathawade, PCMC, Pune, 411033

Village
Tathwade
Taluka
Mulshi
Pincode
411033

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 14 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 7 units · none available

7 units 341 sq ft 31.64 sq m as filed

2 BHK 7 units · 2 available

7 units 447 sq ft 41.5 sq m as filed
Units sold

5 / 14

Early sales

36% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 7 flats · none available

341 sq ft carpet as drawn

Carpet, filed
341 sq ft
Built-up
about 409 sq ft
Super built-up
about 477 sq ft
Every room in this flat

Living and dining about 128 sq ft, Master bedroom about 85 sq ft, Kitchen about 51 sq ft, Bath about 30 sq ft, Balcony about 30 sq ft, Passage about 17 sq ft.

2 BHK 7 flats · 2 available

447 sq ft carpet as drawn

Carpet, filed
447 sq ft
Built-up
about 536 sq ft
Super built-up
about 626 sq ft
Every room in this flat

Living and dining about 130 sq ft, Master bedroom about 87 sq ft, Second bedroom about 69 sq ft, Kitchen about 52 sq ft, Bath about 30 sq ft, Balcony about 30 sq ft, Second bath about 26 sq ft, Passage about 22 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,726 per sq ft of carpet, median of 6 registered sales
Range across those sales ₹9,706 to ₹11,435 per sq ft
Sold and booked 6 sold, 0 booked
Still available 2 flats, 341–447 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Feb 2026
Current status Was due Aug 2026

Revised projection

The completion date has moved from February 2026 to August 2026, 6 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

25/1/23 is the plot this project is built on, as filed
Revenue village Tathwade · shown on this site as Tathawade
TalukaMulshi
Street, as filed -
Bounded north by Property of Waykar S No 25 1 and 6 Mtr Road
Bounded east by Property of Mr Khambote S No 25 2A
Bounded south by Property of Mr Videshi Pashpada of S No 47
Bounded west by Property of Mr Navale out of S No 25 1

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerSamarth Associates
Registered officeS. No. 13/2, Nirmitee, Shitole Nagar, Old Sangvi, Pune 411027

Professionals named on the filing

Architect Shree Associates Pcmc/Le/0491/2026
Architect Shree Associates Mr. Pritam Tarode
Architect Shree Associates Mr. Pritam Tarode
Architect Shree Associates Mr. Pritam Tarode
Architect Shree Associates Mr. Pritam Tarode
Engineer Shrikant Sanjay Bhoite
Engineer Shrikant Sanjay Bhoite
Engineer Shrikant Sanjay Bhoite
Engineer Shrikant Sanjay Bhoite
Chartered Accountant Jejerao Awale & Associates 620601
Chartered Accountant Khutwad Bhoyate & Co. 139513
Chartered Accountant Vishvajeet Nalage & Company
Chartered Accountant Vishvajeet Nalage & Company
Chartered Accountant Vishvajeet Nalage & Company
Chartered Accountant Vishvajeet Nalage & Company

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

8 May 2024 is when an advocate last certified the title to this land
Title report 2 Legal Title Report.pdf 8 May 2024
Promoter's declaration, Form B 9 Form B.pdf 8 May 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100077186
Promoter Samarth Associates
Project typeResidential / Group Housing · Building development
LocalityTathawade — Mulshi taluka, pincode 411033
Applied on28 May 2024
Registered on29 July 2024
Completion, as first filed28 February 2026
Was due30 August 2026 6 months later
Units declared14
Units sold 5 of 14 sold (36%), 9 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 19 August 2026
Application referenceREA52100160594
Current statusLapsed
Record last changed 28 April 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 5 of 14 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 5 of 14 sold, leaving 9. The unit-by-unit list they file separately covers 14 flats and marks 6 sold with 2 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 28 April 2026.

Common questions

Is Samarth Paradise registered with MahaRERA?
It was, as P52100077186, filed on 29 July 2024. That registration has since lapsed. A promoter may not advertise, market or sell in a project whose registration is not current, and a lapse does not by itself say the building has stopped.
When was Samarth Paradise due to be handed over?
August 2026, and that date has passed without a handover being filed — 36 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
What did buyers actually pay in Samarth Paradise?
A median of ₹10,726 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Samarth Paradise?
2 of 14 were still unsold at the promoter's last filing, in 2 BHK, from 447 sq ft of carpet.
Are there complaints against Samarth Paradise?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Samarth Paradise?
Samarth Associates, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100077186 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Tathawade

Stock image, not a photograph of Ganga Amber Ph Ii Stock image
Registered here
₹7,786
On offer
2 BHK
Under construction

Ganga Amber Ph Ii

Shri Siddhivinayak Developers · Tathawade

44 sold

23 complaints

Slipped 2 years
Due
Jun 2027
Units
206
Carpet
605–790
Sold at
₹52 lakh
P52100026055
Stock image, not a photograph of Ganga Aurum Park C Stock image
Registered here
₹8,452
On offer
2 BHK
Under construction

Ganga Aurum Park C

Ecostar Goel Properties LLP · Tathawade

91 sold

6 complaints

Due
Dec 2026
Units
103
Carpet
528–694
Sold at
₹53.5 lakh
P52100014268