RERA registered P52100080336 Active
Aventis
Tathawade, Pune · Residential / Group Housing by Devsia Infracon LLP
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Aventis in Tathawade is MahaRERA-registered (P52100080336) and still under construction, with possession filed for October 2030. Buyers have already registered 123 sales here at a median ₹10,600 per sq ft of carpet — not an asking price. About 62% of the 199 units are sold. Devsia Infracon LLP is the promoter.
- Sold here at
- ₹10,600
- per sq ft, 123 registered sales
- Available
- 2, 3 BHK
- 76 left · 735–997 sq ft
- Now due
- Oct 2030
- 4 months later than first promised
Where this is
Tathawade, PCMC, Pune, 411057
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 199 flats are filed unit by unit with the authority, the highest on floor 26. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 97 units · 13 available
3 BHK 102 units · 63 available
123 / 199
62% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 97 flats · 13 available
735 sq ft carpet as drawn
- Carpet, filed
- 735 sq ft
- Built-up
- about 882 sq ft
- Super built-up
- about 1,029 sq ft
Every room in this flat
Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.
3 BHK 102 flats · 63 available
997 sq ft carpet as drawn
- Carpet, filed
- 997 sq ft
- Built-up
- about 1,196 sq ft
- Super built-up
- about 1,396 sq ft
Every room in this flat
Living and dining about 245 sq ft, Master bedroom about 163 sq ft, Second bedroom about 131 sq ft, Third bedroom about 106 sq ft, Kitchen about 98 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 49 sq ft, Third bath about 41 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,248 to ₹11,615 per sq ft |
|---|---|
| Sold and booked | 120 sold, 3 booked |
| Still available | 76 flats, 735–997 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from June 2030 to October 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Tathwade · shown on this site as Tathawade |
|---|---|
| Taluka | Mulshi |
| Street, as filed | PUNE BANGLORE EXPRESSWAY |
| Bounded north by | 24 MTR DP ROAD |
| Bounded east by | SURVEY NO 166 P AND 155 1 |
| Bounded south by | 18 MTR DP ROAD |
| Bounded west by | SURVEY NO 164 4 8 9 AND 13 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Devsia Infracon LLP |
|---|---|
| Registered office | Office No 410 412, Office No M 69,, City Avenue, Near Bhumkar Chowk, Next To Jaguar Showroom, Wakad, Pune 411057 |
Professionals named on the filing
| Architect | Vk A Architecture CA/2002/29235 |
|---|---|
| Engineer | S K Consultants & Engineers STATE/R/2024/APL/14306 |
| Chartered Accountant | N B Sayed & Associates 631662 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TSR Aventis Final_.pdf | 30 April 2026 1 older version on file |
|---|---|
| Conveyance deed 712 Extract-20-21.pdf | 30 April 2026 11 older versions on file |
| Promoter's declaration, Form B FORM B BUILDER.pdf | 11 March 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100080336 |
| Promoter | Devsia Infracon LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Tathawade — Mulshi taluka, pincode 411057 |
| Applied on | 11 March 2025 |
| Registered on | 22 May 2025 |
| Completion, as first filed | 21 June 2030 |
| Due | 21 October 2030 4 months later |
| Units declared | 199 |
| Units sold | 123 of 199 sold (62%), 76 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100168195 |
| Current status | Active |
| Record last changed | 05 May 2026 · 5 months ago |
Where the sold count comes from, and whether it holds up. 123 of 199 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 199 flats and reaches the same answer — 120 sold, every one with money recorded as received against a named flat, 3 booked with a price agreed but nothing received yet, and 76 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 05 May 2026.
Common questions
- Is Aventis registered with MahaRERA?
- Yes. It is registered as P52100080336, filed on 22 May 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aventis due to be handed over?
- The promoter has told MahaRERA October 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aventis been delayed?
- Yes. The first date filed was June 2030. It now stands at October 2030, 4 months later.
- What did buyers actually pay in Aventis?
- A median of ₹10,600 per square foot of carpet, across 123 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Aventis?
- 76 of 199 were still unsold at the promoter's last filing, in 2, 3 BHK, from 735–997 sq ft of carpet.
- Are there complaints against Aventis?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aventis?
- Devsia Infracon LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100080336 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Tathawade
Stock image
- Registered here
- ₹11,694
- On offer
- 1, 3, 4 BHK + shops
- Due
- Oct 2028
- Units
- 182
- Carpet
- 157–1,338
- Sold at
- ₹1.3 crore
Stock image
- Registered here
- ₹9,851
- On offer
- 2 BHK
- Due
- Apr 2029
- Units
- 478
- Carpet
- 416–684
- Sold at
- ₹67.2 lakh
Stock image
- Nearby
- ₹9,833–10,106
- On offer
- 2, 3 BHK
- Due
- Dec 2030
- Units
- 66
- Carpet
- 660–995
- Typical flat
- ~₹66.1 lakh