Z Zomefy

RERA registered P52100080479 Active

Silver Arch

Talegaon Dabhade, Pune · Residential / Group Housing by Mgr Infra

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Silver Arch in Talegaon Dabhade is MahaRERA-registered (P52100080479) and still under construction, with possession filed for April 2031. Buyers have already registered 32 sales here at a median ₹6,073 per sq ft of carpet — not an asking price. About 46% of the 70 units are sold. Mgr Infra is the promoter.

Stock image, not a photograph of Silver Arch Stock image
Where
Talegaon Dabhade
pincode 410507
Sold here at
₹6,073
per sq ft, 32 registered sales
Available
2 BHK
20 left · 526–560 sq ft
Now due
Apr 2031
4 months later than first promised
A stock photograph, not Silver Arch. We have no picture of this site yet.

Where this is

Talegaon Dabhade, Maval, Pune, 410507

Village
Talegaon Dabhade (M Cl)
Taluka
Mawal
Pincode
410507

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 70 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 70 units · 20 available

28 units 526 sq ft 48.85 sq m as filed
14 units 547 sq ft 50.85 sq m as filed
28 units 560 sq ft 52.0 sq m as filed
Units sold

32 / 70

Selling steadily

46% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 70 flats · 20 available

526 sq ft carpet as drawn, from 526–560 sq ft filed in this configuration

Carpet, filed
526 sq ft
Built-up
about 631 sq ft
Super built-up
about 736 sq ft
Every room in this flat

Living and dining about 153 sq ft, Master bedroom about 102 sq ft, Second bedroom about 82 sq ft, Kitchen about 61 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Second bath about 31 sq ft, Passage about 26 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,073 per sq ft of carpet, median of 32 registered sales
Range across those sales ₹3,804 to ₹6,878 per sq ft
Sold and booked 32 sold, 0 booked
Still available 20 flats, 526–560 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2030
Current status Due Apr 2031

Revised projection

The completion date has moved from December 2030 to April 2031, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SR. NO. 49/2/2 is the plot this project is built on, as filed
Revenue village Talegaon Dabhade (M Cl) · shown on this site as Talegaon Dabhade
TalukaMawal
Street, as filed VARALE ROAD
Bounded north by 12 MTR ROAD
Bounded east by APURVA GARDEN
Bounded south by 48
Bounded west by 49 HISSA 3

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMgr Infra
Registered office05, Sairaj Apartment, Baner Road, Baner Chowk, Baner, Pune 411045

Professionals named on the filing

Architect Sp Associates STATE/R/2024/APL/203
Engineer Sp Associates STATE/R/2024/APL/14203
Chartered Accountant Tejas Khachane & Associates 632538
Chartered Accountant Umakant Gund & Associates 632930

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

19 March 2025 is when an advocate last certified the title to this land
Title report TapScanner 25-02-2025-12꞉39(3) (2).pdf 19 March 2025 1 older version on file
Promoter's declaration, Form B PROMOTAR.pdf 19 March 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100080479
Promoter Mgr Infra
Project typeResidential / Group Housing · Building development
LocalityTalegaon Dabhade — Mawal taluka, pincode 410507
Applied on20 March 2025
Registered on10 June 2025
Completion, as first filed31 December 2030
Due30 April 2031 4 months later
Units declared70
Units sold 32 of 70 sold (46%), 38 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 10 June 2025
Application referenceREA52100168312
Current statusActive
Record last changed 10 June 2025 · 15 months ago

Where the sold count comes from, and whether it holds up. 32 of 70 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 70 flats and reaches the same answer — 32 sold, every one with money recorded as received against a named flat, and 20 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 June 2025.

Common questions

Is Silver Arch registered with MahaRERA?
Yes. It is registered as P52100080479, filed on 10 June 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Silver Arch due to be handed over?
The promoter has told MahaRERA April 2031. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Silver Arch been delayed?
Yes. The first date filed was December 2030. It now stands at April 2031, 4 months later.
What did buyers actually pay in Silver Arch?
A median of ₹6,073 per square foot of carpet, across 32 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Silver Arch?
20 of 70 were still unsold at the promoter's last filing, in 2 BHK, from 526–560 sq ft of carpet.
Are there complaints against Silver Arch?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Silver Arch?
Mgr Infra, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100080479 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Talegaon Dabhade