RERA registered P52100049567 Active
City Heights
Talegaon Dabhade, Pune · Others by Saga Chrishh Associates
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
City Heights in Talegaon Dabhade is MahaRERA-registered (P52100049567) and still under construction, with possession filed for July 2027. Buyers have already registered 48 sales here at a median ₹5,426 per sq ft of carpet — not an asking price. Saga Chrishh Associates is the promoter.
- Sold here at
- ₹5,426
- per sq ft, 48 registered sales
- Available
- Multi Purpose Room, Shops
- 11 left · 210–2,678 sq ft
- Now due
- Jul 2027
- 14 months later than first promised
Where this is
Talegaon Dabhade, Maval, Pune, 410507
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 59 units are filed unit by unit with the authority, the highest on floor 9. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 2 units · all sold
2 BHK 46 units · all sold
Multi Purpose Room 4 units · all available
Shops 7 units · all available
25 / 59
42% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 2 units · none available
399 sq ft carpet as drawn, from 399–402 sq ft filed in this configuration
- Carpet, filed
- 399 sq ft
- Built-up
- about 479 sq ft
- Super built-up
- about 559 sq ft
Every room in this unit
Living and dining about 150 sq ft, Master bedroom about 100 sq ft, Kitchen about 60 sq ft, Bath about 35 sq ft, Balcony about 35 sq ft, Passage about 20 sq ft.
2 BHK 46 units · none available
581 sq ft carpet as drawn, from 392–798 sq ft filed in this configuration
- Carpet, filed
- 581 sq ft
- Built-up
- about 697 sq ft
- Super built-up
- about 813 sq ft
Every room in this unit
Living and dining about 169 sq ft, Master bedroom about 113 sq ft, Second bedroom about 90 sq ft, Kitchen about 68 sq ft, Bath about 39 sq ft, Balcony about 39 sq ft, Second bath about 34 sq ft, Passage about 28 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,009 to ₹7,578 per sq ft |
|---|---|
| Sold and booked | 48 sold, 0 booked |
| Still available | 11 units, 210–2678 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from May 2026 to July 2027, 14 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Talegaon Dabhade (R) · shown on this site as Talegaon Dabhade |
|---|---|
| Taluka | Mawal |
| Street, as filed | TALEGAON CHAKAN ROAD |
| Bounded north by | HISSA NO 5 SURVEY NO 435 1 |
| Bounded east by | MUMBAI CHAKAN ROAD |
| Bounded south by | HISSA NO 3 OUT 435 1 |
| Bounded west by | SURVEY NO 435 436 437 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Saga Chrishh Associates |
|---|---|
| Registered office | 2 Nd Floor, Khandge Automobiles, Near Fun Square, Opp To Petrol Pump, Talegaon Dabhade, Pune 410506 |
Professionals named on the filing
| Architect | Mr P P VHANSHETTI CBTDM/R/2021/APL/00275 |
|---|---|
| Engineer | Shree Disigns CBTDM/R/2021/APL00275 |
| Chartered Accountant | Ashish Udawant 194415 |
| Chartered Accountant | Ganesh Devkar & Associate |
| Chartered Accountant | Ganesh Devkar & Associates 101811 |
| Chartered Accountant | Pillay & Associates 199929 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report search final(1)ss_merged_compressed.pdf | 6 August 2022 |
|---|---|
| Conveyance deed CITY HEIGHTS SALE DEED (2)_11zon.pdf | 24 April 2026 |
| Promoter's declaration, Form B affadavit_compressed.pdf | 8 August 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100049567 |
| Promoter | Saga Chrishh Associates |
| Project type | Others · Building development |
| Locality | Talegaon Dabhade — Mawal taluka, pincode 410507 |
| Applied on | 18 August 2022 |
| Registered on | 15 February 2023 |
| Completion, as first filed | 31 May 2026 |
| Due | 31 July 2027 14 months later |
| Units declared | 59 |
| Units sold | 25 of 59 sold (42%), 34 still unsoldfilings disagree |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 21 August 2026 |
| Application reference | REA52100118360 |
| Current status | Active |
| Record last changed | 31 July 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 25 of 59 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 25 of 59 sold, leaving 34. The unit-by-unit list they file separately covers 59 units and marks 48 sold with 11 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 31 July 2026.
Common questions
- Is City Heights registered with MahaRERA?
- Yes. It is registered as P52100049567, filed on 15 February 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is City Heights due to be handed over?
- The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has City Heights been delayed?
- Yes. The first date filed was May 2026. It now stands at July 2027, 14 months later.
- What did buyers actually pay in City Heights?
- A median of ₹5,426 per square foot of carpet, across 48 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in City Heights?
- 11 of 59 were still unsold at the promoter's last filing, in Multi-purpose + shops, from 210–2,678 sq ft of carpet.
- Are there complaints against City Heights?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building City Heights?
- Saga Chrishh Associates, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100049567 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Talegaon Dabhade
Stock image
- Nearby
- ₹5,585
- On offer
- 3 BHK
- Due
- Oct 2028
- Units
- 14
- Carpet
- 889–929
- Typical flat
- ~₹50.7 lakh
Stock image
- Valued from
- ₹6,878
- On offer
- Offices
- Due
- Apr 2029
- Units
- 11
- Carpet
- 271–2,723
- Typical unit
- ~₹32 lakh
Stock image
- Registered here
- ₹6,711
- On offer
- 1, 2, 3 BHK +2 more
- Due
- Apr 2029
- Units
- 41
- Carpet
- 139–957
- Sold at
- ₹37 lakh