Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Arianna Homes in Somatane is MahaRERA-registered (P52100053619) and still under construction, with possession filed for July 2027. Buyers have already registered 93 sales here at a median ₹5,863 per sq ft of carpet — not an asking price. About 36% of the 256 units are sold. Shreeji Developers is the promoter.
- Sold here at
- ₹5,863
- per sq ft, 93 registered sales
- Available
- 2, 3 BHK
- 119 left · 627–1,490 sq ft
- Now due
- Jul 2027
- 4 months later than first promised
Where this is
Somatane, Maval, Pune, 410506
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 256 flats are filed unit by unit with the authority, the highest on floor 14. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 248 units · 118 available
8 further sizes, 25 units between them
3 BHK 8 units · 1 available
93 / 256
36% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 248 flats · 118 available
720 sq ft carpet as drawn, from 627–919 sq ft filed in this configuration
- Carpet, filed
- 720 sq ft
- Built-up
- about 864 sq ft
- Super built-up
- about 1,008 sq ft
Every room in this flat
Living and dining about 210 sq ft, Master bedroom about 140 sq ft, Second bedroom about 112 sq ft, Kitchen about 84 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.
3 BHK 8 flats · 1 available
1,490 sq ft carpet as drawn
- Carpet, filed
- 1,490 sq ft
- Built-up
- about 1,788 sq ft
- Super built-up
- about 2,086 sq ft
Every room in this flat
Living and dining about 366 sq ft, Master bedroom about 244 sq ft, Second bedroom about 195 sq ft, Third bedroom about 159 sq ft, Kitchen about 147 sq ft, Bath about 85 sq ft, Balcony about 85 sq ft, Second bath about 73 sq ft, Passage about 73 sq ft, Third bath about 61 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,132 to ₹6,237 per sq ft |
|---|---|
| Sold and booked | 93 sold, 0 booked |
| Still available | 119 flats, 627–1490 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2027 to July 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Somatane |
|---|---|
| Taluka | Mawal |
| Street, as filed | SOMATNE ROAD |
| Bounded north by | GAT NO 119 |
| Bounded east by | GAT NO 117 |
| Bounded south by | GAT NO 122 AND 123 |
| Bounded west by | GAT NO 119 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shreeji Developers |
|---|---|
| Registered office | Sect No 26, Office No 208, 2nd Floor, 26, A Square Building, Ganga Nagar Road, Akurdi Railway Station, Akurdi Pradhikaran, Pune 411044 |
Professionals named on the filing
| Architect | Vilas Tarvadi CA/92/14877 |
|---|---|
| Engineer | Devang M Joshi |
| Engineer | Jrcc Consultants LLP |
| Chartered Accountant | Bharat H Shah |
| Chartered Accountant | Mitul Patel 171135 |
| Chartered Accountant | PILLAY and ASSOCIATES 199929 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Somatane 120 Rera Format-2.pdf | 3 October 2023 3 older versions on file |
|---|---|
| Promoter's declaration, Form B Shreeji Developers - Form B_compressed.pdf | 18 September 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100053619 |
| Promoter | Shreeji Developers |
| Project type | Residential / Group Housing · Building development |
| Locality | Somatane — Mawal taluka, pincode 410506 |
| Applied on | 29 August 2020 |
| Registered on | 21 November 2023 |
| Completion, as first filed | 31 March 2027 |
| Due | 31 July 2027 4 months later |
| Units declared | 256 |
| Units sold | 93 of 256 sold (36%), 163 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 21 November 2023 |
| Application reference | REA52100075699 |
| Current status | Active |
| Record last changed | 21 November 2023 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 93 of 256 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 256 flats and reaches the same answer — 93 sold, 92 of them with money recorded as received against a named flat, and 119 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 21 November 2023.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Arianna Homes registered with MahaRERA?
- Yes. It is registered as P52100053619, filed on 21 November 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Arianna Homes due to be handed over?
- The promoter has told MahaRERA July 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Arianna Homes been delayed?
- Yes. The first date filed was March 2027. It now stands at July 2027, 4 months later.
- What did buyers actually pay in Arianna Homes?
- A median of ₹5,863 per square foot of carpet, across 93 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Arianna Homes?
- 119 of 256 were still unsold at the promoter's last filing, in 2, 3 BHK, from 627–1,490 sq ft of carpet.
- Are there complaints against Arianna Homes?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Arianna Homes?
- Shreeji Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100053619 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Somatane
Stock image
- Registered here
- ₹5,346
- On offer
- 1 BHK + shops
- Due
- Dec 2026
- Units
- 45
- Carpet
- 266–383
- Sold at
- ₹20.4 lakh
Stock image
- Due
- Apr 2028
- Units
- —
- Carpet
- —
- Typical unit
- —
Stock image
- Registered here
- ₹7,033
- On offer
- 1, 2 BHK
1 complaint
- Due
- Dec 2026
- Units
- 230
- Carpet
- 312–649
- Sold at
- ₹22.4 lakh