RERA registered P52100079777 Active

Radha Madhav Vihar Phase 1

Shirur, Pune · Residential / Group Housing by Aditya Corporate

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Radha Madhav Vihar Phase 1 in Shirur is MahaRERA-registered (P52100079777) and still under construction, with possession filed for July 2028. Buyers have already registered 14 sales here at a median ₹3,823 per sq ft of carpet — not an asking price. About 47% of the 30 units are sold. Aditya Corporate is the promoter.

Stock image, not a photograph of Radha Madhav Vihar Phase 1 Stock image
Where
Shirur
pincode 412210
Sold here at
₹3,823
per sq ft, 14 registered sales
Available
1 BHK
10 left · 470 sq ft
Now due
Jul 2028
4 months later than first promised
A stock photograph, not Radha Madhav Vihar Phase 1. We have no picture of this site yet.

Where this is

Shirur, Pune, 412210

Street map of Shirur centred on the coordinate filed for Radha Madhav Vihar Phase 1, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Shirur
Taluka
Shirur
Pincode
412210
Coordinates
18.820661, 74.363771

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 30 flats are filed unit by unit with the authority, the highest on floor 5. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 25 units · 10 available

20 units 470 sq ft 43.71 sq m as filed
5 units 476 sq ft 44.2 sq m as filed

2 BHK 5 units · none available

5 units 725 sq ft 67.35 sq m as filed
Units sold

14 / 30

Selling steadily

47% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 25 flats · 10 available

470 sq ft carpet as drawn, from 470–476 sq ft filed in this configuration

Carpet, filed
470 sq ft
Built-up
about 564 sq ft
Super built-up
about 658 sq ft
Every room in this flat

Living and dining about 176 sq ft, Master bedroom about 118 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Passage about 24 sq ft.

2 BHK 5 flats · none available

725 sq ft carpet as drawn

Carpet, filed
725 sq ft
Built-up
about 870 sq ft
Super built-up
about 1,015 sq ft
Every room in this flat

Living and dining about 211 sq ft, Master bedroom about 141 sq ft, Second bedroom about 113 sq ft, Kitchen about 84 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,823 per sq ft of carpet, median of 14 registered sales
Range across those sales ₹3,173 to ₹5,314 per sq ft
Sold and booked 14 sold, 0 booked
Still available 10 flats, 470–725 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2028
Current status Due Jul 2028

Revised projection

The completion date has moved from March 2028 to July 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Gat No. 55/2/A (Part) is the plot this project is built on, as filed
Revenue village Shirur
TalukaShirur
Street, as filed Shirur
Bounded north by By S No 55-2A Part
Bounded east by By S No 55-2B
Bounded south by By 30 Feet Wide Road and S No 55-2A Part
Bounded west by By S No 55-1A-5 and 20 Feet Wide Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAditya Corporate
Registered office554, Joshiwadi, Shirur, Pune 412210

Professionals named on the filing

Architect Pratik Prakash Chopda CA/2016/76590
Engineer Chhatrapati Construction
Engineer Ravindra A Karnavat PMC356
Chartered Accountant A.B. Thorat & Co. 146031
Chartered Accountant Anil Mardikar & Co. 100454
Chartered Accountant Anurag Meherwal and Co

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

11 March 2025 is when an advocate last certified the title to this land
Title report Title Search Report Annexure.pdf 11 March 2025
Promoter's declaration, Form B Form B.pdf 11 March 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100079777
Promoter Aditya Corporate
Project typeResidential / Group Housing · Building development
LocalityShirur — Shirur taluka, pincode 412210
Applied on11 March 2025
Registered on26 March 2025
Completion, as first filed31 March 2028
Due31 July 2028 4 months later
Units declared30
Units sold 14 of 30 sold (47%), 16 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 26 March 2025
Application referenceREA52100168201
Current statusActive
Record last changed 26 March 2025 · 18 months ago

Where the sold count comes from, and whether it holds up. 14 of 30 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 30 flats and reaches the same answer — 14 sold, 13 of them with money recorded as received against a named flat, and 10 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 26 March 2025.

Common questions

Is Radha Madhav Vihar Phase 1 registered with MahaRERA?
Yes. It is registered as P52100079777, filed on 26 March 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Radha Madhav Vihar Phase 1 due to be handed over?
The promoter has told MahaRERA July 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Radha Madhav Vihar Phase 1 been delayed?
Yes. The first date filed was March 2028. It now stands at July 2028, 4 months later.
What did buyers actually pay in Radha Madhav Vihar Phase 1?
A median of ₹3,823 per square foot of carpet, across 14 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Radha Madhav Vihar Phase 1?
10 of 30 were still unsold at the promoter's last filing, in 1 BHK, from 470 sq ft of carpet.
Are there complaints against Radha Madhav Vihar Phase 1?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Radha Madhav Vihar Phase 1?
Aditya Corporate, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100079777 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Shirur

Stock image, not a photograph of Sumati Heights Stock image
Nearby
₹5,398
On offer
2 BHK
Under construction

Sumati Heights

Rushabh Realty · Shirur

0 sold
Slipped 4 months
Due
Apr 2030
Units
42
Carpet
721–757
Typical flat
~₹40.9 lakh
PR1260002502181