RERA registered P52100052683 Active
Mango Tree Villa Tower 1
Shewalewadi, Pune · Residential / Group Housing by Palchin Real Estates Private Limited
Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.
In short
Mango Tree Villa Tower 1 in Shewalewadi is MahaRERA-registered (P52100052683) and still under construction, with possession filed for October 2027. Buyers have already registered 74 sales here at a median ₹13,633 per sq ft of carpet — not an asking price. About 97% of the 76 units are sold. Palchin Real Estates Private Limited is the promoter.
- Sold here at
- ₹13,633
- per sq ft, 74 registered sales
- Available
- 3, 4 BHK
- 2 left · 1,252–1,650 sq ft
- Now due
- Oct 2027
- 4 months later than first promised
Shewalewadi, PMRDA, Pune, 412307
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 76 flats are filed unit by unit with the authority, the highest on floor 19. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK Residences
4 BHK Residences
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 3 BHK | 1252 sq ft (116.27 sq m) | ~1502 sq ft | ~1753 sq ft | 1 left of 38 |
| 4 BHK | 1650 sq ft (153.33 sq m) | ~1980 sq ft | ~2310 sq ft | 1 left of 38 |
74 / 76
97% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
3 BHK 38 flats · 1 available
1,252 sq ft carpet as drawn
- Carpet, filed
- 1,252 sq ft
- Built-up
- about 1,502 sq ft
- Super built-up
- about 1,753 sq ft
Every room in this flat
Living and dining about 308 sq ft, Master bedroom about 205 sq ft, Second bedroom about 164 sq ft, Third bedroom about 133 sq ft, Kitchen about 123 sq ft, Bath about 72 sq ft, Balcony about 72 sq ft, Second bath about 62 sq ft, Passage about 62 sq ft, Third bath about 51 sq ft.
4 BHK 38 flats · 1 available
1,650 sq ft carpet as drawn
- Carpet, filed
- 1,650 sq ft
- Built-up
- about 1,980 sq ft
- Super built-up
- about 2,310 sq ft
Every room in this flat
Living and dining about 367 sq ft, Master bedroom about 244 sq ft, Second bedroom about 196 sq ft, Third bedroom about 159 sq ft, Kitchen about 147 sq ft, Fourth bedroom about 147 sq ft, Bath about 86 sq ft, Balcony about 86 sq ft, Passage about 86 sq ft, Second bath about 73 sq ft, Third bath about 61 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹12,138 to ₹16,078 per sq ft |
|---|---|
| Sold and booked | 60 sold, 14 booked |
| Still available | 2 flats, 1252–1650 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from June 2027 to October 2027, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Shewalewadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Pune Solapur Road |
| Bounded north by | Premium Tower 2 |
| Bounded east by | Ramp |
| Bounded south by | Canal |
| Bounded west by | 9 m Driveway |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Palchin Real Estates Private Limited |
|---|---|
| Registered office | 41/44, Sp Centre, Minoo Desai Marg, Near Radio Club, Colaba, Mumbai City 400005 |
Professionals named on the filing
| Architect | Fourth Dimension Architects Private Limited CA/95/18785 |
|---|---|
| Engineer | ER. Ambadas T Kharatmol |
| Engineer | Rahul Krishna Singh Revulagadda |
| Chartered Accountant | BR Nagda & Company 127270 |
| Chartered Accountant | Harshad Doshi & Co 196528 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Palchin- Title Report (MTV Project).pdf | 6 August 2024 2 older versions on file |
|---|---|
| Promoter's declaration, Form B MTV Tower 1- Affidavit (Form B).pdf | 11 August 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052683 |
| Promoter | Palchin Real Estates Private Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Shewalewadi — Haveli taluka, pincode 412307 |
| Applied on | 11 August 2023 |
| Registered on | 20 September 2023 |
| Completion, as first filed | 30 June 2027 |
| Due | 30 October 2027 4 months later |
| Units declared | 76 |
| Units sold | 74 of 76 sold (97%), 2 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100143617 |
| Current status | Active |
| Record last changed | 18 February 2026 · 8 months ago |
Where the sold count comes from, and whether it holds up. 74 of 76 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 76 flats and reaches the same answer — 60 sold, every one with money recorded as received against a named flat, 14 booked with a price agreed but nothing received yet, and 2 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 18 February 2026.
- Is Mango Tree Villa Tower 1 registered with MahaRERA?
- Yes. It is registered as P52100052683, filed on 20 September 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Mango Tree Villa Tower 1 due to be handed over?
- The promoter has told MahaRERA October 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Mango Tree Villa Tower 1 been delayed?
- Yes. The first date filed was June 2027. It now stands at October 2027, 4 months later.
- What did buyers actually pay in Mango Tree Villa Tower 1?
- A median of ₹13,633 per square foot of carpet, across 74 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Mango Tree Villa Tower 1?
- 2 of 76 were still unsold at the promoter's last filing, in 3, 4 BHK, from 1,252–1,650 sq ft of carpet.
- Are there complaints against Mango Tree Villa Tower 1?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Mango Tree Villa Tower 1?
- Palchin Real Estates Private Limited, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 14 October 2026. The authority's own registry page for P52100052683 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Shewalewadi
Stock image
- Registered here
- ₹10,676
- On offer
- 2, 3 BHK
Joyville Celestia Phase 5
- Due
- Feb 2029
- Units
- 169
- Carpet
- 544–1,062
- Sold at
- ₹59.7 lakh
Stock image
- Registered here
- ₹10,753
- On offer
- 2, 4 BHK
Joyville Celestia Phase 6
- Due
- Jan 2030
- Units
- 592
- Carpet
- 546–1,086
- Sold at
- ₹59.2 lakh
Stock image
- Registered here
- ₹10,275
Joyville Hadapsar Annexe Phase 16
- Due
- Apr 2027
- Units
- 252
- Carpet
- 348–747
- Sold at
- ₹57.2 lakh