Z Zomefy

RERA registered P52100054837 Active

Morya Park

Saswad, Pune · Others by Gajdant Constructions LLP

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Morya Park in Saswad is MahaRERA-registered (P52100054837) and still under construction, with possession filed for April 2028. Buyers have already registered 35 sales here at a median ₹4,282 per sq ft of carpet — not an asking price. About 24% of the 158 units are sold. Gajdant Constructions LLP is the promoter.

Stock image, not a photograph of Morya Park Stock image
Where
Saswad
pincode 412301
Sold here at
₹4,282
per sq ft, 35 registered sales
Available
1 BHK, Shops
120 left · 156–850 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Morya Park. We have no picture of this site yet.

Where this is

Saswad, Purandar, Pune, 412301

Village
Sasvad (M Cl)
Taluka
Purandhar
Pincode
412301

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 158 units are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 148 units · 113 available

14 units 424 sq ft 39.41 sq m as filed
10 units 436 sq ft 40.5 sq m as filed
10 units 455 sq ft 42.27 sq m as filed
10 units 458 sq ft 42.57 sq m as filed
8 units 600 sq ft 55.71 sq m as filed
10 units 606 sq ft 56.3 sq m as filed
8 units 618 sq ft 57.4 sq m as filed
10 units 619 sq ft 57.53 sq m as filed
10 units 622 sq ft 57.79 sq m as filed
9 units 663 sq ft 61.61 sq m as filed
10 units 771 sq ft 71.6 sq m as filed
10 units 783 sq ft 72.7 sq m as filed
5 further sizes, 29 units between them
7 units 444 sq ft 41.24 sq m as filed
7 units 484 sq ft 45.0 sq m as filed
6 units 487 sq ft 45.25 sq m as filed
8 units 629 sq ft 58.45 sq m as filed
1 unit 850 sq ft 78.97 sq m as filed

Shops 10 units · 7 available

1 unit 131 sq ft 12.15 sq m as filed
1 unit 156 sq ft 14.45 sq m as filed
1 unit 168 sq ft 15.62 sq m as filed
1 unit 169 sq ft 15.74 sq m as filed
1 unit 186 sq ft 17.3 sq m as filed
2 units 215 sq ft 20.0–20.01 sq m as filed
1 unit 216 sq ft 20.11 sq m as filed
1 unit 257 sq ft 23.92 sq m as filed
1 unit 269 sq ft 25.01 sq m as filed
Units sold

38 / 158

Early sales

24% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

1 BHK 148 units · 113 available

424 sq ft carpet as drawn, from 424–850 sq ft filed in this configuration

Carpet, filed
424 sq ft
Built-up
about 509 sq ft
Super built-up
about 594 sq ft
Every room in this unit

Living and dining about 159 sq ft, Master bedroom about 106 sq ft, Kitchen about 64 sq ft, Bath about 37 sq ft, Balcony about 37 sq ft, Passage about 21 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹4,282 per sq ft of carpet, median of 35 registered sales
Range across those sales ₹3,379 to ₹5,574 per sq ft
Sold and booked 38 sold, 0 booked
Still available 120 units, 131–850 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SR.NO.68/2/B/2/2/1,2,3 is the plot this project is built on, as filed
Revenue village Sasvad (M Cl) · shown on this site as Saswad
TalukaPurandhar
Street, as filed SASWAD SONORI ROAD
Bounded north by SR NO 68 2 B 2BHINTADE AND KUMBHARKAR PLOT
Bounded east by 60 FTDP ROADAND SR NO 69
Bounded south by SR NO 68 2 C
Bounded west by SR NO 68 2 B 1 AND SASWAD SONORI ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGajdant Constructions LLP
Registered officeS.No.11, B.No. 2-8, Flat No 501, Lake Town Co.Op.Hsg Soc Ltd, Katraj, Near Katraj Lake, Pune 411046

Professionals named on the filing

Architect vishal kumbharkar CA/2017/82838
Engineer Avinash Vitthal Kumbharkar 1717340113
Engineer Sameer Kumbharkar
Chartered Accountant omkar deokar 172409

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

6 February 2024 is when an advocate last certified the title to this land
Title report search report_compressed.pdf 6 February 2024
Promoter's declaration, Form B fORM b.pdf 11 December 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100054837
Promoter Gajdant Constructions LLP
Project typeOthers · Building development
LocalitySaswad — Purandhar taluka, pincode 412301
Applied on12 December 2023
Registered on15 February 2024
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared158
Units sold 38 of 158 sold (24%), 120 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 February 2024
Application referenceREA52100150597
Current statusActive
Record last changed 15 February 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 38 of 158 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 158 units and reaches the same answer — 38 sold, 37 of them with money recorded as received against a named unit, and 120 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 February 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Morya Park registered with MahaRERA?
Yes. It is registered as P52100054837, filed on 15 February 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Morya Park due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Morya Park been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Morya Park?
A median of ₹4,282 per square foot of carpet, across 35 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Morya Park?
120 of 158 were still unsold at the promoter's last filing, in 1 BHK + shops, from 156–850 sq ft of carpet.
Are there complaints against Morya Park?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Morya Park?
Gajdant Constructions LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100054837 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Saswad

Stock image, not a photograph of Jp Tower Stock image
Locality median
₹4,292
On offer
Offices + shops
Under construction

Jp Tower

Jp Buildcon · Saswad

1 sold
Slipped 4 months
Due
Sep 2027
Units
140
Carpet
152–2,882
Typical unit
~₹9.8 lakh
P52100078594
Stock image, not a photograph of Kanishka Grand Plaza Stock image
Valued from
₹3,393
On offer
Amenity +2 more
Under construction

Kanishka Grand Plaza

Platinum Lifespace Developers · Saswad

8 sold
Slipped a year
Due
Dec 2026
Units
171
Carpet
349–1,835
Sold at
₹39.4 lakh
P52100049774