RERA registered P52100076906 Active
Nirman Anamika
Sadashiv Peth, Pune · Residential / Group Housing by Nirman Developers
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Nirman Anamika in Sadashiv Peth is MahaRERA-registered (P52100076906) and still under construction, with possession filed for April 2028. No sales are registered in this project yet. Units the same size elsewhere in Sadashiv Peth have registered at ₹16,094 per sq ft of carpet — the neighbourhood, not this building. About 4% of the 28 units are sold. 1 complaint sits on the filing. Nirman Developers is the promoter.
- Nearby at
- ₹16,094
- per sq ft, same sizes in Sadashiv Peth
- Available
- 3 BHK
- 27 left · 932–1,452 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Sadashiv Peth, PMC, Pune, 411030
No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.
Flat sizes on file
All 28 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
3 BHK 28 units · 27 available
7 further sizes, 7 units between them
1 / 28
4% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
3 BHK 28 flats · 27 available
999 sq ft carpet as drawn, from 811–1,452 sq ft filed in this configuration
- Carpet, filed
- 999 sq ft
- Built-up
- about 1,199 sq ft
- Super built-up
- about 1,399 sq ft
Every room in this flat
Living and dining about 246 sq ft, Master bedroom about 164 sq ft, Second bedroom about 131 sq ft, Third bedroom about 106 sq ft, Kitchen about 98 sq ft, Bath about 57 sq ft, Balcony about 57 sq ft, Second bath about 49 sq ft, Passage about 49 sq ft, Third bath about 41 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What flats like these cost nearby
No sale has been registered at Nirman Anamika yet. 1 agreement has been filed, which is too few to divide into a rate anyone should act on.
| On sale here | Registered in Sadashiv Peth | Which for this size is |
|---|---|---|
| 3 BHK 811–1,452 sq ft | ₹16,094/sq ft 57 sales, 15 projects | ₹1.3 crore–₹2.3 crore middle half ₹14,226–17,369/sq ft |
Each rate is what buyers contracted to pay for the same configuration in Sadashiv Peth, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Sadashiv Peth.
The state values these at ₹8,937 per sq ft of carpet — one rate across all 15 still available, which puts the smallest at ₹83.3 lakh and the largest at ₹95.2 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (M Corp.) · shown on this site as Sadashiv Peth |
|---|---|
| Taluka | Pune City |
| Street, as filed | NAVI PETH |
| Bounded north by | ADJC F P NO 1000 P |
| Bounded east by | 12 M WIDW DP ROAD |
| Bounded south by | ADJC F P NO 1000 P |
| Bounded west by | ADJC F P NO 1000 P |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Nirman Developers |
|---|---|
| Registered office | 205, Citi Center, Karve Road, Oppo Ayurved Rashala, Erandwane, Pune 411004 |
Professionals named on the filing
| Architect | Prakash Kulkarni CA/98/22909 |
|---|---|
| Engineer | G A bhilare Consultants pvt ltd M145316/5 |
| Engineer | Mahesh Pawar |
| Chartered Accountant | S.L. Bagadi and Co. 041009 |
| Chartered Accountant | Vinay Chordia 132825 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| SM12500230 | Nov 2025 | Order passed Nov 2025 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Revised TSR - Rera Format.pdf | 26 June 2024 |
|---|---|
| Promoter's declaration, Form B Form B - Sandeep Sir.pdf | 15 June 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100076906 |
| Promoter | Nirman Developers |
| Project type | Residential / Group Housing · Building development |
| Locality | Sadashiv Peth — Pune City taluka, pincode 411030 |
| Applied on | 20 June 2024 |
| Registered on | 09 July 2024 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 28 |
| Units sold | 1 of 28 sold (4%), 27 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 20 August 2026 |
| Application reference | REA52100163230 |
| Current status | Active |
| Record last changed | 28 November 2025 · 10 months ago |
Where the sold count comes from, and whether it holds up. 1 of 28 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 28 flats and reaches the same answer — 1 sold, and 27 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 28 November 2025.
Common questions
- Is Nirman Anamika registered with MahaRERA?
- Yes. It is registered as P52100076906, filed on 09 July 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Nirman Anamika due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Nirman Anamika been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What does a flat in Nirman Anamika cost?
- Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Sadashiv Peth have registered at ₹16,094 per square foot of carpet — the neighbourhood, not this building.
- How many flats are left in Nirman Anamika?
- 27 of 28 were still unsold at the promoter's last filing, in 3 BHK, from 932–1,452 sq ft of carpet.
- Are there complaints against Nirman Anamika?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Nirman Anamika?
- Nirman Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100076906 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Sadashiv Peth
Stock image
- Nearby
- ₹13,502–16,094
- On offer
- 2, 3 BHK + 1 RK
- Due
- Apr 2031
- Units
- 25
- Carpet
- 579–1,050
- Typical flat
- ~₹1.4 crore
Stock image
- Nearby
- ₹13,502–16,094
- On offer
- 2, 3 BHK + offices
- Due
- Aug 2030
- Units
- 19
- Carpet
- 485–1,345
- Typical unit
- ~₹1.6 crore
Stock image
- Nearby
- ₹13,502–16,094
- On offer
- 2, 3 BHK
- Due
- Apr 2029
- Units
- 7
- Carpet
- 873–1,256
- Typical flat
- ~₹1.3 crore