RERA registered P52100013230 Active
Tamara
Rahatani, Pune · Residential / Group Housing by Goldfinger Kataria Urban Developments
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Tamara in Rahatani is MahaRERA-registered (P52100013230) and still under construction, with possession filed for December 2026. Buyers have already registered 241 sales here at a median ₹9,544 per sq ft of carpet — not an asking price. 1 complaint sits on the filing. Goldfinger Kataria Urban Developments is the promoter.
- Sold here at
- ₹9,544
- per sq ft, 241 registered sales
- Available
- 2 BHK, 3 BHK, 4 BHK, Office Space, Shops
- 155 left · 242–4,686 sq ft
- Now due
- Dec 2026
- 9 years later than first promised
Where this is
Rahatani, PCMC, Pune, 411017
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 396 units are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 213 units · 65 available
3 BHK 122 units · 49 available
4 BHK 16 units · 12 available
Configuration not filed 21 units · 5 available
Office Space 12 units · all available
Shops 12 units · all available
230 / 396
58% absorption rate · the promoter's two filings disagree
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 213 units · 65 available
736 sq ft carpet as drawn, from 641–911 sq ft filed in this configuration
- Carpet, filed
- 736 sq ft
- Built-up
- about 883 sq ft
- Super built-up
- about 1,030 sq ft
Every room in this unit
Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 36 sq ft.
3 BHK 122 units · 49 available
1,080 sq ft carpet as drawn, from 742–1,270 sq ft filed in this configuration
- Carpet, filed
- 1,080 sq ft
- Built-up
- about 1,296 sq ft
- Super built-up
- about 1,512 sq ft
Every room in this unit
Living and dining about 266 sq ft, Master bedroom about 177 sq ft, Second bedroom about 142 sq ft, Third bedroom about 115 sq ft, Kitchen about 106 sq ft, Bath about 62 sq ft, Balcony about 62 sq ft, Second bath about 53 sq ft, Passage about 53 sq ft, Third bath about 44 sq ft.
4 BHK 16 units · 12 available
1,886 sq ft carpet as drawn, from 1,886–1,972 sq ft filed in this configuration
- Carpet, filed
- 1,886 sq ft
- Built-up
- about 2,263 sq ft
- Super built-up
- about 2,640 sq ft
Every room in this unit
Living and dining about 419 sq ft, Master bedroom about 279 sq ft, Second bedroom about 224 sq ft, Third bedroom about 182 sq ft, Kitchen about 168 sq ft, Fourth bedroom about 168 sq ft, Bath about 98 sq ft, Balcony about 98 sq ft, Passage about 98 sq ft, Second bath about 84 sq ft, Third bath about 70 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,848 to ₹12,283 per sq ft |
|---|---|
| Sold and booked | 241 sold, 0 booked |
| Still available | 155 units, 242–4686 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2017 to December 2026, 9 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Rahatani |
|---|---|
| Taluka | Haveli |
| Street, as filed | Pimple Saudhagar |
| Bounded north by | Property owned by Kokane and Nakate |
| Bounded east by | Kashitish Co operative Hsg Society |
| Bounded south by | 18 M wide road |
| Bounded west by | Rose e meher society |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Goldfinger Kataria Urban Developments |
|---|---|
| Registered office | S No 48, 4-10, Hissa No 4 10, Rahatni, Beside Reliance Mall, Pune 411017 |
| Registered agents | 12 licensed agents may sell this project |
Professionals named on the filing
| Architect | Sanjvee Bhosale CA/92/14809 |
|---|---|
| Engineer | G A Bhilare Consultants Private Limited |
| Engineer | Ranjeet Kadam |
| Chartered Accountant | Sagar B Shelvane 136478 |
| Chartered Accountant | Vinod S Sabu And Co. 165870 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12504065 | Nov 2025 | Order passed Nov 2025 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Format A and Search and title Report.pdf | 13 July 2026 4 older versions on file |
|---|---|
| Promoter's declaration, Form B Promoter form B-1.pdf | 3 July 2026 1 older version on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100013230 |
| Promoter | Goldfinger Kataria Urban Developments |
| Project type | Residential / Group Housing · Building development |
| Locality | Rahatani — Haveli taluka, pincode 411017 |
| Applied on | 31 July 2017 |
| Registered on | 21 September 2017 |
| Completion, as first filed | 31 December 2017 |
| Due | 30 December 2026 9 years later |
| Units declared | 396 |
| Units sold | 230 of 396 sold (58%), 166 still unsoldfilings disagree |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Corrected certificate, issued 31 July 2026 |
| Application reference | REA52100017723 |
| Current status | Active |
| Record last changed | 04 May 2026 · 4 months ago |
Where the sold count comes from, and whether it holds up. 230 of 396 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 230 of 396 sold, leaving 166. The unit-by-unit list they file separately covers 396 units and marks 241 sold with 155 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 04 May 2026.
Common questions
- Is Tamara registered with MahaRERA?
- Yes. It is registered as P52100013230, filed on 21 September 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Tamara due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Tamara been delayed?
- Yes. The first date filed was December 2017. It now stands at December 2026, 9 years later.
- What did buyers actually pay in Tamara?
- A median of ₹9,544 per square foot of carpet, across 241 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Tamara?
- 155 of 396 were still unsold at the promoter's last filing, in 2, 3, 4 BHK +2 more, from 242–4,686 sq ft of carpet.
- Are there complaints against Tamara?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Tamara?
- Goldfinger Kataria Urban Developments, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100013230 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Rahatani
Stock image
- Locality median
- ₹9,544
- On offer
- 1, 2, 3 BHK
- Due
- Dec 2029
- Units
- 59
- Carpet
- 542–1,028
- Typical flat
- ~₹71.2 lakh
Stock image
- Locality median
- ₹9,544
- On offer
- 2, 3 BHK
- Due
- Dec 2030
- Units
- 84
- Carpet
- 680–962
- Typical flat
- ~₹64.9 lakh
Stock image
- Locality median
- ₹9,544
- On offer
- Shops
- Due
- Oct 2028
- Units
- 72
- Carpet
- 300–685
- Sold at
- ₹76 lakh