RERA registered PR1262022501044 Active
Birla Punya Phase II
Pune Camp, Pune · Residential / Group Housing by Birla Estates Private Limited
Official record Updated from the register 14 November 2026. Anything filed since then is not here yet.
In short
Birla Punya Phase II in Pune Camp is MahaRERA-registered (PR1262022501044) and still under construction, with possession filed for October 2032. Buyers have already registered 156 sales here at a median ₹26,709 per sq ft of carpet — not an asking price. About 53% of the 293 units are sold. 1 complaint sits on the filing. Birla Estates Private Limited is the promoter.
- Sold here at
- ₹26,709
- per sq ft, 156 registered sales
- Available
- 2, 3, 4 BHK
- 137 left · 636–4,260 sq ft
- Now due
- Oct 2032
- 4 months later than first promised
Pune Camp, Pune, 411001
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 293 units are filed unit by unit with the authority, the highest on floor 25. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK Residences
2 BHK Residences
3 BHK Residences
4 BHK Residences
Other Suite
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 1 BHK | 505 – 601 sq ft (46.87 – 55.84 sq m) | ~606 – 721 sq ft | ~707 – 841 sq ft | 0 left of 8 |
| 2 BHK | 636 – 643 sq ft (59.13 – 59.72 sq m) | ~763 – 772 sq ft | ~890 – 900 sq ft | 68 left of 184 |
| 3 BHK | 1270 – 1271 sq ft (117.96 – 118.07 sq m) | ~1524 – 1525 sq ft | ~1778 – 1779 sq ft | 2 left of 11 |
| 4 BHK | 1282 – 1288 sq ft (119.1 – 119.67 sq m) | ~1538 – 1546 sq ft | ~1795 – 1803 sq ft | 58 left of 81 |
| Other | 917 – 4260 sq ft (85.15 – 395.8 sq m) | ~1100 – 5112 sq ft | ~1284 – 5964 sq ft | 9 left of 9 |
156 / 293
53% absorption rate
Visual area guide See what the filed sizes feel like 4 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 8 units · none available
505 sq ft carpet as drawn, from 505–601 sq ft filed in this configuration
- Carpet, filed
- 505 sq ft
- Built-up
- about 606 sq ft
- Super built-up
- about 707 sq ft
Every room in this unit
Living and dining about 189 sq ft, Master bedroom about 126 sq ft, Kitchen about 76 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Passage about 25 sq ft.
2 BHK 184 units · 68 available
640 sq ft carpet as drawn, from 636–643 sq ft filed in this configuration
- Carpet, filed
- 640 sq ft
- Built-up
- about 768 sq ft
- Super built-up
- about 896 sq ft
Every room in this unit
Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Second bedroom about 99 sq ft, Kitchen about 75 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 11 units · 2 available
1,270 sq ft carpet as drawn, from 1,270–1,271 sq ft filed in this configuration
- Carpet, filed
- 1,270 sq ft
- Built-up
- about 1,524 sq ft
- Super built-up
- about 1,778 sq ft
Every room in this unit
Living and dining about 312 sq ft, Master bedroom about 208 sq ft, Second bedroom about 167 sq ft, Third bedroom about 135 sq ft, Kitchen about 125 sq ft, Bath about 73 sq ft, Balcony about 73 sq ft, Second bath about 62 sq ft, Passage about 62 sq ft, Third bath about 52 sq ft.
4 BHK 81 units · 58 available
1,282 sq ft carpet as drawn, from 1,282–1,288 sq ft filed in this configuration
- Carpet, filed
- 1,282 sq ft
- Built-up
- about 1,538 sq ft
- Super built-up
- about 1,795 sq ft
Every room in this unit
Living and dining about 285 sq ft, Master bedroom about 190 sq ft, Second bedroom about 152 sq ft, Third bedroom about 123 sq ft, Kitchen about 114 sq ft, Fourth bedroom about 114 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Passage about 66 sq ft, Second bath about 57 sq ft, Third bath about 47 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹20,550 to ₹37,572 per sq ft |
|---|---|
| Sold and booked | 0 sold, 156 booked |
| Still available | 137 units, 505–4260 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Revised delivery projection
The completion date has moved from June 2032 to October 2032, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pune (M Corp.) · shown on this site as Pune Camp |
|---|---|
| Taluka | Pune City |
| Street, as filed | Near RTO Office on Station Road |
| Bounded north by | Tower C |
| Bounded east by | 24M.W Road |
| Bounded south by | Adj Final Plot No-89 |
| Bounded west by | 9M.W Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Birla Estates Private Limited |
|---|---|
| Registered office | Level 8, Birla Aurora, Dr. Annie Besant Road, Opposite Century Bazar, Worli, Mumbai City 400030 |
Professionals named on the filing
| Architect | Venkataramanan Associates CA/97/21866 |
|---|---|
| Engineer | Amit R Ichake |
| Engineer | Nilesh Sudam Ghadge |
| Chartered Accountant | Anil R Gupta & Co 142713 |
| Chartered Accountant | S R B C & Co LLP Chartered Accountants 049365 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12602605 | May 2026 | Order passed May 2026 |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Complete Legal Title Report Birla Punya Phase 2.pdf | 5 December 2025 1 older version on file |
|---|---|
| Conveyance deed Sale Deed Birla Estates Pvt Ltd-Page1-40.pdf | 20 September 2025 1 older version on file |
| Promoter's declaration, Form B Form B (3).pdf | 20 September 2025 |
| Annexure A declaration Signed order 50.pdf | 26 September 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PR1262022501044 |
| Promoter | Birla Estates Private Limited |
| Project type | Residential / Group Housing · Building development |
| Locality | Pune Camp — Pune City taluka, pincode 411001 |
| Applied on | 27 September 2025 |
| Registered on | 01 October 2025 |
| Completion, as first filed | 30 June 2032 |
| Due | 30 October 2032 4 months later |
| Units declared | 293 |
| Units sold | 156 of 293 sold (53%), 137 still unsold |
| Complaints | 1 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 01 October 2025 |
| Application reference | ACK18092503461 |
| Current status | Active |
| Record last changed | 01 October 2025 · 13 months ago |
Where the sold count comes from, and whether it holds up. 156 of 293 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 293 units and reaches the same answer — 0 sold, 156 booked with a price agreed but nothing received yet, and 137 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 01 October 2025.
- Is Birla Punya Phase II registered with MahaRERA?
- Yes. It is registered as PR1262022501044, filed on 01 October 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Birla Punya Phase II due to be handed over?
- The promoter has told MahaRERA October 2032. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Birla Punya Phase II been delayed?
- Yes. The first date filed was June 2032. It now stands at October 2032, 4 months later.
- What did buyers actually pay in Birla Punya Phase II?
- A median of ₹26,709 per square foot of carpet, across 156 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Birla Punya Phase II?
- 137 of 293 were still unsold at the promoter's last filing, in 2, 3, 4 BHK, from 636–4,260 sq ft of carpet.
- Are there complaints against Birla Punya Phase II?
- 1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Birla Punya Phase II?
- Birla Estates Private Limited, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 14 November 2026. The authority's own registry page for PR1262022501044 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Pune Camp
Stock image
- Valued from
- ₹13,510
- On offer
- Offices
- Due
- Mar 2029
- Units
- 40
- Carpet
- 507–1,820
- Typical unit
- ~₹1.5 crore
Stock image
- Registered here
- ₹19,151
- On offer
- 1 RK
- Due
- Dec 2029
- Units
- 79
- Carpet
- 461–2,946
- Sold at
- ₹4.5 crore
Stock image
- Registered here
- ₹24,454
- On offer
- 3, 4, 5, 6 BHK
Marvel Basilo A AND B Building
Vvv Realtors And Developers Private Limited · Pune Camp
9 complaints
- Due
- Dec 2027
- Units
- 92
- Carpet
- 1,034–2,900
- Sold at
- ₹2.8 crore