Puneville Phase III Cluster B
Punawale, Pune · Residential / Group Housing by Benchmarrk Realty LLP
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Puneville Phase III Cluster B in Punawale is MahaRERA-registered (P52100047694) and still under construction, with possession filed for June 2029. Buyers have already registered 120 sales here at a median ₹8,710 per sq ft of carpet — not an asking price. About 57% of the 214 units are sold. Benchmarrk Realty LLP is the promoter.
- Sold here at
- ₹8,710
- per sq ft, 120 registered sales
- Available
- 2 BHK
- 1 left · 665 sq ft
- Possession
- Jun 2029
- as filed with MahaRERA
Where this is
Punawale, PCMC, Pune, 411033
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 214 flats are filed unit by unit with the authority, the highest on floor 22. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 214 units · 1 available
121 / 214
57% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 214 flats · 1 available
651 sq ft carpet as drawn, from 525–7,858 sq ft filed in this configuration
- Carpet, filed
- 651 sq ft
- Built-up
- about 781 sq ft
- Super built-up
- about 911 sq ft
Every room in this flat
Living and dining about 190 sq ft, Master bedroom about 126 sq ft, Second bedroom about 101 sq ft, Kitchen about 76 sq ft, Bath about 44 sq ft, Balcony about 44 sq ft, Second bath about 38 sq ft, Passage about 32 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,558 to ₹9,574 per sq ft |
|---|---|
| Sold and booked | 121 sold, 0 booked |
| Still available | 1 flat, 525–7858 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹21,768 per sq ft, more than two and a half times this project's own median. A flat does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Punawale |
|---|---|
| Taluka | Mulshi |
| Street, as filed | Kate Wasti |
| Bounded north by | By P Wing |
| Bounded east by | By Podium Parking-4 |
| Bounded south by | By M Wing |
| Bounded west by | Driveway |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Benchmarrk Realty Private Limited |
|---|---|
| Registered office | Ground Floor Sr No. 17P, 18P, 19P, Puneville Pharande Spaces, Mumbai Bengaluru Highway, Punawale, Near Kate Vasti, Pune 411033 |
Professionals named on the filing
| Architect | VK architecture CA/2002/29235 |
|---|---|
| Engineer | Abhijit Shivaji Gaikwad |
| Chartered Accountant | Anjk & Co LLP 182099 |
| Chartered Accountant | G N Mantri & Associates 198137 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TITLE REPORT.pdf | 13 August 2022 |
|---|---|
| Promoter's declaration, Form B FORM-B.pdf | 30 May 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100047694 |
| Promoter | Benchmarrk Realty LLP |
| Project type | Residential / Group Housing · Building development |
| Locality | Punawale — Mulshi taluka, pincode 411033 |
| Applied on | 26 July 2022 |
| Registered on | 21 November 2022 |
| Completion, as first filed | 30 June 2029 |
| Due | 30 June 2029 |
| Units declared | 214 |
| Units sold | 121 of 214 sold (57%), 93 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 21 November 2022 |
| Application reference | REA52100116128 |
| Current status | Active |
| Record last changed | 21 November 2022 · over 3 years ago 3 years untouched |
Where the sold count comes from, and whether it holds up. 121 of 214 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 214 flats and reaches the same answer — 121 sold, every one with money recorded as received against a named flat, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 21 November 2022.
MahaRERA has not recorded a change to this project's record in 3 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Puneville Phase III Cluster B registered with MahaRERA?
- Yes. It is registered as P52100047694, filed on 21 November 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Puneville Phase III Cluster B due to be handed over?
- The promoter has told MahaRERA June 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Puneville Phase III Cluster B been delayed?
- No. June 2029 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Puneville Phase III Cluster B?
- A median of ₹8,710 per square foot of carpet, across 120 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Puneville Phase III Cluster B?
- 1 of 214 were still unsold at the promoter's last filing, in 2 BHK, from 665 sq ft of carpet.
- Are there complaints against Puneville Phase III Cluster B?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Puneville Phase III Cluster B?
- Benchmarrk Realty LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100047694 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Punawale
Stock image
- Registered here
- ₹11,020
- On offer
- 2, 3, 4 BHK
2 complaints
- Due
- Apr 2035
- Units
- 670
- Carpet
- 727–1,529
- Sold at
- ₹1.2 crore
Stock image
- Registered here
- ₹10,327
- On offer
- 2, 3 BHK
- Due
- Jan 2027
- Units
- 20
- Carpet
- 592–782
- Sold at
- ₹65.2 lakh
Stock image
Registration lapsed
- Was due
- Sep 2026
- Units
- —
- Carpet
- —
- Typical unit
- —