Z Zomefy

RERA registered PR1260002600100 Active

Advika Phase IV-C

Pisoli, Pune · Residential / Group Housing by Advika Constructions Private Limited

Official record Updated from the register 13 October 2026. Anything filed since then is not here yet.

In short

Advika Phase IV-C in Pisoli is MahaRERA-registered (PR1260002600100) and still under construction, with possession filed for December 2030. No sales are registered in this project yet. Units the same size elsewhere in Pisoli have registered at ₹6,977 per sq ft of carpet — the neighbourhood, not this building. None of the units are filed as sold yet. Advika Constructions Private Limited is the promoter.

Stock image, not a photograph of Advika Phase IV-C Stock image
Where
Pisoli
pincode 411048
Nearby at
₹6,977
per sq ft, same sizes in Pisoli
Available
2 BHK
60 left · 609–635 sq ft
Possession
Dec 2030
as filed with MahaRERA
A stock photograph, not Advika Phase IV-C. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pisoli · Haveli

Pisoli, PMC, Pune, 411048

Street map of Pisoli centred on the coordinate filed for Advika Phase IV-C, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village Pisoli
Taluka Haveli
Pincode 411048
Promoter Pin Coordinates 18.444866, 73.898616

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 60 flats are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
60 Total Licenced Units
Residential Typology • 100.0% of tower

2 BHK Residences

60 Available 60 registered total
Estimated Market Window ₹42.5 lakh – ₹44.3 lakh
Locality Benchmark ₹6,977 / sq ft
Carpet Variations as Filed Span: 609 to 635 sq ft
609 sq ft 56.55 sq m 30 units
621 sq ft 57.73 sq m 5 units
622 sq ft 57.77 sq m 5 units
623 sq ft 57.85 sq m 10 units
635 sq ft 58.95 sq m 10 units
Govt ASR Base: ₹37.9 lakh – ₹43.4 lakh 60 of 60 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 609 – 635 sq ft (56.55 – 58.95 sq m) ~731 – 762 sq ft ~853 – 889 sq ft 60 left of 60
Units sold

0 / 60

Pre-launch / early phase

0% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 60 flats · 60 available

609 sq ft carpet as drawn, from 609–635 sq ft filed in this configuration

Carpet, filed
609 sq ft
Built-up
about 731 sq ft
Super built-up
about 853 sq ft
Every room in this flat

Living and dining about 177 sq ft, Master bedroom about 118 sq ft, Second bedroom about 95 sq ft, Kitchen about 71 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 30 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What flats like these cost nearby

No sale has been registered at Advika Phase IV-C yet. The promoter has filed no agreement values, so nothing below is this project's own price.

Independent Market Intelligence

Registered Agreement Rates in Pisoli

Based on 629 government-stamped sale deeds registered for identical carpet bands across nearby developments.

2 BHK 609–635 sq ft
₹6,977 / sq ft

629 registered sale agreements across 10 nearby developments.

Estimated Unit Market Window ₹42.5 lakh – ₹44.3 lakh
Middle Half (IQR) ₹5,648 – ₹7,399 / sq ft
25th percentile: ₹5,648 75th percentile: ₹7,399

Each rate is what buyers contracted to pay for the same configuration in Pisoli, over the carpet area on the same filing. Floor and facing move a rate, and a project new on the register can open above or below what its neighbours sold at two years ago, so the last column is arithmetic rather than a quote. See every rate registered in Pisoli.

The state values these at ₹6,564 per sq ft of carpet — one rate across all 60 still available, which puts the smallest at ₹37.9 lakh and the largest at ₹43.4 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State On Scheduled Baseline
Original Baseline
Dec 2030
Declared at registration
Current Statutory Date
Due
Dec 2030
Identical to original baseline

Stable delivery projection

Stable project schedule. Zero slippage or revision requests reported since initial registration. Construction is recorded against the original baseline date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

32/5C is the plot this project is built on, as filed
Revenue village Pisoli
TalukaHaveli
Street, as filed Katraj Kondhwa Road
Bounded north by Property out of S.NO.32 part
Bounded east by Property out of S.No.32 part
Bounded south by Remaining Land of S.No.32
Bounded west by Kondhwa Budruk Boundary Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAdvika Constructions Pvt.Ltd
Registered office5, The Retreat, 100/4 Gidney Park, Poonawala Garden, Salisbury Park, Pune 411037

Professionals named on the filing

Architect Ankur Associates CA/98/22909
Engineer Sudhir Sheth REG/PMC/STE/1823/20
Chartered Accountant Kr Manik And Co 009550
Chartered Accountant Vinay Chordia 132825

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

6 March 2026 is when an advocate last certified the title to this land
Title report Title and Search Report.pdf 6 March 2026
Conveyance deed Advika Land Ownership Document.pdf 12 January 2026
Promoter's declaration, Form B Declaration Form B.pdf 12 January 2026
Annexure A declaration Annexure A - Declaration cum undertaking.pdf 12 January 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002600100
Promoter Advika Constructions Private Limited
Project typeResidential / Group Housing · Building development
LocalityPisoli — Haveli taluka, pincode 411048
Applied on21 January 2026
Registered on15 April 2026
Completion, as first filed31 December 2030
Due31 December 2030
Units declared60
Units sold None sold yet, all 60 on the market
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 15 April 2026
Application referenceACK12012606012
Current statusActive
Record last changed 15 April 2026 · 6 months ago

Nothing has sold yet. The promoter's quarterly progress report says none of the 60 flats are gone, and the unit-by-unit list they file separately says the same: all 60 still unsold. On a project this new that is normal rather than a warning, and it means every carpet area filed here is still available. Either way, this is only as current as the last change to the record, 15 April 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Advika Phase IV-C registered with MahaRERA?
Yes. It is registered as PR1260002600100, filed on 15 April 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Advika Phase IV-C due to be handed over?
The promoter has told MahaRERA December 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Advika Phase IV-C been delayed?
No. December 2030 is the date first filed with the authority and it has not moved since.
What does a flat in Advika Phase IV-C cost?
Nothing has been registered in this project yet, so it has no price of its own. Units the same size elsewhere in Pisoli have registered at ₹6,977 per square foot of carpet — the neighbourhood, not this building.
How many flats are left in Advika Phase IV-C?
60 of 60 were still unsold at the promoter's last filing, in 2 BHK, from 609–635 sq ft of carpet.
Are there complaints against Advika Phase IV-C?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Advika Phase IV-C?
Advika Constructions Private Limited, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 13 October 2026. The authority's own registry page for PR1260002600100 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Pisoli

Stock image, not a photograph of Banka Sapphire Stock image
Registered here
₹6,713
On offer
1, 2 BHK + shops
Under construction

Banka Sapphire

Banka Constructions · Pisoli

10 sold
Slipped 4 months
Due
Apr 2031
Units
77
Carpet
217–773
Sold at
₹39.7 lakh
P52100080598
Stock image, not a photograph of Casa Mia A Stock image
Registered here
₹4,726
On offer
2, 3 BHK +2 more
Under construction

Casa Mia A

R R Constructions · Pisoli

55 sold
Slipped 9.5 years
Due
Dec 2028
Units
126
Carpet
164–2,283
Sold at
₹41.5 lakh
P52100011432