In short
Panchsheel Garden Building - A in Pirangut is MahaRERA-registered (P52100024377) and still under construction, with possession filed for June 2028. Buyers have already registered 121 sales here at a median ₹6,684 per sq ft of carpet — not an asking price. About 92% of the 131 units are sold. Shankar Dattatray Kemse is the promoter.
- Sold here at
- ₹6,684
- per sq ft, 121 registered sales
- Available
- 2 BHK
- 10 left · 479–484 sq ft
- Now due
- Jun 2028
- 4.5 years later than first promised
Where this is
Pirangut, PMRDA, Pune, 412115
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 131 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 83 units · all sold
2 BHK 48 units · 10 available
121 / 131
92% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 83 flats · none available
336 sq ft carpet as drawn, from 336–412 sq ft filed in this configuration
- Carpet, filed
- 336 sq ft
- Built-up
- about 403 sq ft
- Super built-up
- about 470 sq ft
Every room in this flat
Living and dining about 126 sq ft, Master bedroom about 84 sq ft, Kitchen about 50 sq ft, Bath about 29 sq ft, Balcony about 29 sq ft, Passage about 17 sq ft.
2 BHK 48 flats · 10 available
479 sq ft carpet as drawn, from 412–484 sq ft filed in this configuration
- Carpet, filed
- 479 sq ft
- Built-up
- about 575 sq ft
- Super built-up
- about 671 sq ft
Every room in this flat
Living and dining about 140 sq ft, Master bedroom about 93 sq ft, Second bedroom about 74 sq ft, Kitchen about 56 sq ft, Bath about 33 sq ft, Balcony about 33 sq ft, Second bath about 28 sq ft, Passage about 23 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,164 to ₹9,698 per sq ft |
|---|---|
| Sold and booked | 121 sold, 0 booked |
| Still available | 10 flats, 336–484 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2023 to June 2028, 4.5 years later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pirangut |
|---|---|
| Taluka | Mulshi |
| Street, as filed | MAIN PAUD ROAD |
| Bounded north by | GAT NO 3800 OLD |
| Bounded east by | B WING |
| Bounded south by | GAT NO 1242 NEW |
| Bounded west by | 6M WIDE ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shankar Dattatray Kemse |
|---|---|
| Registered office | Sr No 78, Plot No 11, Shop No.9, Shivprasad Apartment, Paud Road, Near Kothrud Depot, Right Bhusari Colony, Pune 411038 |
Professionals named on the filing
| Architect | Milind N Panchal CA/2006/38979 |
|---|---|
| Engineer | Avinash Ghorpade |
| Engineer | Rajendra Dhokchawale |
| Chartered Accountant | Dinesh Gandhi 044008 |
| Chartered Accountant | Shrikant Mantri and Co. 111204 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Panchshil Search Report_compressed.pdf | 28 December 2019 |
|---|---|
| Promoter's declaration, Form B Form B Affidavit cum Declaration SA.pdf | 2 August 2024 2 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100024377 |
| Promoter | Shankar Dattatray Kemse |
| Project type | Residential / Group Housing · Building development |
| Locality | Pirangut — Mulshi taluka, pincode 412115 |
| Applied on | 27 January 2020 |
| Registered on | 10 February 2020 |
| Completion, as first filed | 30 December 2023 |
| Due | 30 June 2028 4.5 years later |
| Units declared | 131 |
| Units sold | 121 of 131 sold (92%), 10 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 05 August 2026 |
| Application reference | REA52100068899 |
| Current status | Active |
| Record last changed | 12 August 2026 · 33 days ago |
Where the sold count comes from, and whether it holds up. 121 of 131 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 131 flats and reaches the same answer — 121 sold, every one with money recorded as received against a named flat, and 10 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 August 2026.
Common questions
- Is Panchsheel Garden Building - A registered with MahaRERA?
- Yes. It is registered as P52100024377, filed on 10 February 2020, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Panchsheel Garden Building - A due to be handed over?
- The promoter has told MahaRERA June 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Panchsheel Garden Building - A been delayed?
- Yes. The first date filed was December 2023. It now stands at June 2028, 4.5 years later.
- What did buyers actually pay in Panchsheel Garden Building - A?
- A median of ₹6,684 per square foot of carpet, across 121 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Panchsheel Garden Building - A?
- 10 of 131 were still unsold at the promoter's last filing, in 2 BHK, from 479–484 sq ft of carpet.
- Are there complaints against Panchsheel Garden Building - A?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Panchsheel Garden Building - A?
- Shankar Dattatray Kemse, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100024377 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pirangut
Stock image
- Registered here
- ₹5,765
- On offer
- 1, 2 BHK
- Due
- Dec 2029
- Units
- 119
- Carpet
- 451–698
- Sold at
- ₹28 lakh
Stock image
- Locality median
- ₹6,026
- On offer
- Row Houses
- Due
- May 2027
- Units
- 15
- Carpet
- 1,734–1,971
- Typical flat
- ~₹1.1 crore
Stock image
- Locality median
- ₹6,026
- On offer
- Row Houses
- Due
- May 2027
- Units
- 9
- Carpet
- 1,218–1,913
- Typical flat
- ~₹1 crore