RERA registered P52100054383 Active
Eternity Towers
Pimpri, Pune · Others by Siddhivinayak Skylish Developers
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Eternity Towers in Pimpri is MahaRERA-registered (P52100054383) and still under construction, with possession filed for July 2029. Buyers have already registered 49 sales here at a median ₹9,936 per sq ft of carpet — not an asking price. About 76% of the 78 units are sold. Siddhivinayak Skylish Developers is the promoter.
- Sold here at
- ₹9,936
- per sq ft, 49 registered sales
- Available
- 2 BHK, Office Space, Shops
- 19 left · 306–2,965 sq ft
- Now due
- Jul 2029
- 4 months later than first promised
Where this is
Pimpri, Pune, 411018
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 78 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 25 units · 1 available
3 BHK 25 units · all sold
Office Space 2 units · 1 available
Shops 17 units · all available
Showroom 9 units · all sold
59 / 78
76% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 25 units · 1 available
712 sq ft carpet as drawn, from 711–824 sq ft filed in this configuration
- Carpet, filed
- 712 sq ft
- Built-up
- about 854 sq ft
- Super built-up
- about 997 sq ft
Every room in this unit
Living and dining about 207 sq ft, Master bedroom about 138 sq ft, Second bedroom about 111 sq ft, Kitchen about 83 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 35 sq ft.
3 BHK 25 units · none available
1,025 sq ft carpet as drawn, from 1,025–1,700 sq ft filed in this configuration
- Carpet, filed
- 1,025 sq ft
- Built-up
- about 1,230 sq ft
- Super built-up
- about 1,435 sq ft
Every room in this unit
Living and dining about 252 sq ft, Master bedroom about 168 sq ft, Second bedroom about 134 sq ft, Third bedroom about 109 sq ft, Kitchen about 101 sq ft, Bath about 59 sq ft, Balcony about 59 sq ft, Second bath about 50 sq ft, Passage about 50 sq ft, Third bath about 42 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,836 to ₹10,498 per sq ft |
|---|---|
| Sold and booked | 52 sold, 7 booked |
| Still available | 19 units, 306–3090 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from March 2029 to July 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpri Chinchawad (M Corp.) · shown on this site as Pimpri |
|---|---|
| Taluka | Haveli |
| Street, as filed | Mumbai Pune Road |
| Bounded north by | By Mumbai Pune Road |
| Bounded east by | By Nalla and partly by Mumbai Pune Road |
| Bounded south by | By Railway Line |
| Bounded west by | By Railway Line and Partly by Sr No 191 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Siddhivinayak Skylish Developers |
|---|---|
| Registered office | D 10 & 11, Jai Ganesh Vision, Near Aangan Hotel, Aangan Hotel, Akurdi, Pune 411035 |
Professionals named on the filing
| Architect | Cubix Architects Associates CA/2001/28514 |
|---|---|
| Engineer | Balkrishna Ramdas Kalbhor |
| Chartered Accountant | Navdeep Jindal & Associates 164075 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Final_11zon.pdf | 29 December 2023 |
|---|---|
| Promoter's declaration, Form B Form B_Promoter_Correct.pdf | 20 November 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100054383 |
| Promoter | Siddhivinayak Skylish Developers |
| Project type | Others · Building development |
| Locality | Pimpri — Haveli taluka, pincode 411018 |
| Applied on | 21 November 2023 |
| Registered on | 18 January 2024 |
| Completion, as first filed | 31 March 2029 |
| Due | 31 July 2029 4 months later |
| Units declared | 78 |
| Units sold | 59 of 78 sold (76%), 19 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 20 August 2024 |
| Application reference | REA52100149613 |
| Current status | Active |
| Record last changed | 30 May 2024 · over 2 years ago 2 years untouched |
Where the sold count comes from, and whether it holds up. 59 of 78 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 78 units and reaches the same answer — 52 sold, every one with money recorded as received against a named unit, 7 booked with a price agreed but nothing received yet, and 19 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 30 May 2024.
MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.
Common questions
- Is Eternity Towers registered with MahaRERA?
- Yes. It is registered as P52100054383, filed on 18 January 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Eternity Towers due to be handed over?
- The promoter has told MahaRERA July 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Eternity Towers been delayed?
- Yes. The first date filed was March 2029. It now stands at July 2029, 4 months later.
- What did buyers actually pay in Eternity Towers?
- A median of ₹9,936 per square foot of carpet, across 49 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Eternity Towers?
- 19 of 78 were still unsold at the promoter's last filing, in 2 BHK +2 more, from 306–2,965 sq ft of carpet.
- Are there complaints against Eternity Towers?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Eternity Towers?
- Siddhivinayak Skylish Developers, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100054383 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pimpri
Stock image
- Due
- Apr 2028
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹11,625
- On offer
- 2, 3, 4 BHK
- Due
- Apr 2028
- Units
- 142
- Carpet
- 614–1,333
- Sold at
- ₹71.7 lakh
Stock image
- Registered here
- ₹6,196
- On offer
- 1 BHK
- Due
- Oct 2026
- Units
- 24
- Carpet
- 425–475
- Sold at
- ₹27.7 lakh