RERA registered P52100009270 Active
Rajveer Imperia
Pimpri, Pune · Others by Waghere Associates
Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.
In short
Rajveer Imperia in Pimpri is MahaRERA-registered (P52100009270) and still under construction, with possession filed for November 2026. Buyers have already registered 180 sales here at a median ₹9,321 per sq ft of carpet — not an asking price. About 81% of the 315 units are sold. Waghere Associates is the promoter.
- Sold here at
- ₹9,321
- per sq ft, 180 registered sales
- Available
- 2 BHK, 3 BHK, Shops
- 59 left · 250–841 sq ft
- Now due
- Nov 2026
- a year later than first promised
Where this is
Pimpri, Pune, 411018
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 315 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 8 units · all sold
2 BHK 204 units · 44 available
3 BHK 22 units · 10 available
Shops 81 units · 5 available
256 / 315
81% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 8 units · none available
439 sq ft carpet as drawn, from 439–570 sq ft filed in this configuration
- Carpet, filed
- 439 sq ft
- Built-up
- about 527 sq ft
- Super built-up
- about 615 sq ft
Every room in this unit
Living and dining about 165 sq ft, Master bedroom about 110 sq ft, Kitchen about 66 sq ft, Bath about 38 sq ft, Balcony about 38 sq ft, Passage about 22 sq ft.
2 BHK 204 units · 44 available
589 sq ft carpet as drawn, from 541–1,078 sq ft filed in this configuration
- Carpet, filed
- 589 sq ft
- Built-up
- about 707 sq ft
- Super built-up
- about 825 sq ft
Every room in this unit
Living and dining about 172 sq ft, Master bedroom about 114 sq ft, Second bedroom about 91 sq ft, Kitchen about 69 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Second bath about 34 sq ft, Passage about 29 sq ft.
3 BHK 22 units · 10 available
835 sq ft carpet as drawn, from 589–1,078 sq ft filed in this configuration
- Carpet, filed
- 835 sq ft
- Built-up
- about 1,002 sq ft
- Super built-up
- about 1,169 sq ft
Every room in this unit
Living and dining about 205 sq ft, Master bedroom about 137 sq ft, Second bedroom about 110 sq ft, Third bedroom about 89 sq ft, Kitchen about 82 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 41 sq ft, Third bath about 34 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹5,399 to ₹12,070 per sq ft |
|---|---|
| Sold and booked | 256 sold, 0 booked |
| Still available | 59 units, 167–1078 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
16 further sales are set aside. They divide out beyond ₹23,301 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from December 2025 to November 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpri Chinchawad (M Corp.) · shown on this site as Pimpri |
|---|---|
| Taluka | Haveli |
| Street, as filed | Opp Annasaheb Magar Stadium |
| Bounded north by | 25 MT ROAD |
| Bounded east by | 12 MT ROAD |
| Bounded south by | SHANTIVIHAR SOCIETY |
| Bounded west by | 25 MT ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Waghere Associates |
|---|---|
| Registered office | Cts 960/1 19, B R Waghere Building, Tapovan Mandir Road, Bsnl Telephone Exchange, Pimprigaon, Pune 411017 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | I.P.Associates PCMC/LAS/0545/2017 |
|---|---|
| Architect | Satyajeet Inamdar |
| Engineer | Chandrakant Sakole CHANDRAKANT SAKOLE |
| Chartered Accountant | Anjk & Co LLP 182099 |
| Chartered Accountant | GN Mantri and Associates 198137 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report title search Rajveer Imperia.pdf | 29 July 2017 |
|---|---|
| Promoter's declaration, Form B Affidavit Rajveer Imperia.pdf | 29 July 2017 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100009270 |
| Promoter | Waghere Associates |
| Project type | Others · Building development |
| Locality | Pimpri — Haveli taluka, pincode 411018 |
| Applied on | 01 August 2017 |
| Registered on | 22 August 2017 |
| Completion, as first filed | 30 December 2025 |
| Due | 30 November 2026 a year later |
| Units declared | 315 |
| Units sold | 256 of 315 sold (81%), 59 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 20 July 2026 |
| Application reference | REA52100019016 |
| Current status | Active |
| Record last changed | 26 July 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 256 of 315 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 315 units and reaches the same answer — 256 sold, every one with money recorded as received against a named unit, and 59 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 26 July 2026.
Common questions
- Is Rajveer Imperia registered with MahaRERA?
- Yes. It is registered as P52100009270, filed on 22 August 2017, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Rajveer Imperia due to be handed over?
- The promoter has told MahaRERA November 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Rajveer Imperia been delayed?
- Yes. The first date filed was December 2025. It now stands at November 2026, a year later.
- What did buyers actually pay in Rajveer Imperia?
- A median of ₹9,321 per square foot of carpet, across 180 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Rajveer Imperia?
- 59 of 315 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 250–841 sq ft of carpet.
- Are there complaints against Rajveer Imperia?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Rajveer Imperia?
- Waghere Associates, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100009270 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pimpri
Stock image
- Registered here
- ₹11,975
- Due
- Oct 2026
- Units
- 21
- Carpet
- 490–832
- Sold at
- ₹63.5 lakh
Stock image
- Registered here
- ₹7,990
- On offer
- 1, 2 BHK
1 complaint
- Due
- Mar 2027
- Units
- 94
- Carpet
- 415–881
- Sold at
- ₹58.1 lakh
Stock image
- Registered here
- ₹7,518
- On offer
- 1 BHK
- Due
- May 2027
- Units
- 67
- Carpet
- 418–454
- Sold at
- ₹32.3 lakh