RERA registered P52100033276 Active
Eastern River Residency Wing D
Pimple Gurav, Pune · Residential / Group Housing by Kishor Shankar Garve
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Eastern River Residency Wing D in Pimple Gurav is MahaRERA-registered (P52100033276) and still under construction, with possession filed for December 2026. Buyers have already registered 131 sales here at a median ₹10,653 per sq ft of carpet — not an asking price. About 94% of the 140 units are sold. 8 complaints sit on the filing. Kishor Shankar Garve is the promoter.
- Sold here at
- ₹10,653
- per sq ft, 131 registered sales
- Available
- None left
- every flat filed as sold or held
- Now due
- Dec 2026
- a year later than first promised
Where this is
Pimple Gurav, PCMC, Pune, 411061
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 140 flats are filed unit by unit with the authority, the highest on floor 24. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 92 units · none available
3 BHK 48 units · none available
131 / 140
94% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 92 flats · none available
638 sq ft carpet as drawn, from 626–638 sq ft filed in this configuration
- Carpet, filed
- 638 sq ft
- Built-up
- about 766 sq ft
- Super built-up
- about 893 sq ft
Every room in this flat
Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Second bedroom about 99 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.
3 BHK 48 flats · none available
864 sq ft carpet as drawn
- Carpet, filed
- 864 sq ft
- Built-up
- about 1,037 sq ft
- Super built-up
- about 1,210 sq ft
Every room in this flat
Living and dining about 212 sq ft, Master bedroom about 142 sq ft, Second bedroom about 113 sq ft, Third bedroom about 92 sq ft, Kitchen about 85 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 42 sq ft, Passage about 42 sq ft, Third bath about 35 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,523 to ₹11,591 per sq ft |
|---|---|
| Sold and booked | 131 sold, 0 booked |
| Still available | 0 flats, 626–864 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2025 to December 2026, a year later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Pimpale Gurav · shown on this site as Pimple Gurav |
|---|---|
| Taluka | Haveli |
| Street, as filed | Kashid Park |
| Bounded north by | Property of S No 90-1 |
| Bounded east by | Property of S No 90-1 |
| Bounded south by | Property of Adjoining S No 90-2 |
| Bounded west by | Property of S No 90-1 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | M/s Vinayak Enterprises |
|---|---|
| Registered office | Survey Number 90/1, 90, Eastern River Residency, Bhosari-Wakad Brt Road, Near Kalpataru Hsg, Kashid Park, Pune 411027 |
Professionals named on the filing
| Architect | Milind Patil CA/89/12285 |
|---|---|
| Engineer | Prathamesh Sugate EN1837416 |
| Engineer | VKG Associates PCMC/LE/678/2021 |
| Engineer | Venkangouda V Jadiyappagoudar PMC/STE/2628/17 |
| Chartered Accountant | Chaudhari Agarwal and Associates 144540 |
| Chartered Accountant | Jsg & Co 150876 |
| Chartered Accountant | Tejas Sathe & Associates 145345 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Complaints filed with MahaRERA
8 cases against this project, 0 with an order on record, filed between Apr 2026 and May 2026. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.
| Case number | Filed | Outcome |
|---|---|---|
| CC12602726 | May 2026 | No order on record |
| CC12602725 | May 2026 | No order on record |
| CC12602636 | May 2026 | No order on record |
| CC12602383 | Apr 2026 | No order on record |
| CC12602321 | Apr 2026 | No order on record |
| CC12602310 | Apr 2026 | No order on record |
| CC12602293 | Apr 2026 | No order on record |
| CC12602294 | Apr 2026 | No order on record |
A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.
Title and ownership papers
| Title report Legal Title Report ERR.PDF | 12 February 2022 |
|---|---|
| Promoter's declaration, Form B Declaration Form B by Promoter.pdf | 19 January 2022 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100033276 |
| Promoter | Kishor Shankar Garve |
| Project type | Residential / Group Housing · Building development |
| Locality | Pimple Gurav — Haveli taluka, pincode 411061 |
| Applied on | 13 January 2022 |
| Registered on | 15 February 2022 |
| Completion, as first filed | 31 December 2025 |
| Due | 31 December 2026 a year later |
| Units declared | 140 |
| Units sold | 131 of 140 sold (94%), 9 still unsold |
| Complaints | 8 on record with MahaRERA |
| Certificate on file | Extension certificate, issued 14 August 2026 |
| Application reference | REA52100101870 |
| Current status | Active |
| Record last changed | 14 August 2026 · 2 months ago |
Where the sold count comes from, and whether it holds up. 131 of 140 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 140 flats and reaches the same answer — 131 sold, every one with money recorded as received against a named flat, and 0 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.
Common questions
- Is Eastern River Residency Wing D registered with MahaRERA?
- Yes. It is registered as P52100033276, filed on 15 February 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Eastern River Residency Wing D due to be handed over?
- The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Eastern River Residency Wing D been delayed?
- Yes. The first date filed was December 2025. It now stands at December 2026, a year later.
- What did buyers actually pay in Eastern River Residency Wing D?
- A median of ₹10,653 per square foot of carpet, across 131 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Eastern River Residency Wing D?
- None. All 140 are filed as sold or booked.
- Are there complaints against Eastern River Residency Wing D?
- 8 cases have been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
- Who is building Eastern River Residency Wing D?
- Kishor Shankar Garve, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100033276 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Pimple Gurav
Stock image
- Nearby
- ₹10,795
- On offer
- 2 BHK
- Due
- Dec 2028
- Units
- 29
- Carpet
- 362–763
- Typical flat
- ~₹41.6 lakh
Stock image
- Due
- Oct 2026
- Units
- —
- Carpet
- —
- Typical flat
- —
Stock image
- Registered here
- ₹10,582
- On offer
- 3 BHK
- Due
- Apr 2029
- Units
- 126
- Carpet
- 904
- Sold at
- ₹80.9 lakh