RERA registered P52100055134 Active
Aalaap - I at Nanded City
Nanded, Pune · Residential / Group Housing by Nanded City Development & Construction Co. Ltd.
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Aalaap - I at Nanded City in Nanded is MahaRERA-registered (P52100055134) and still under construction, with possession filed for April 2028. Buyers have already registered 873 sales here at a median ₹10,029 per sq ft of carpet — not an asking price. About 93% of the 936 units are sold. Nanded City Development & Construction Co. Ltd. is the promoter.
- Sold here at
- ₹10,029
- per sq ft, 873 registered sales
- Available
- 2, 3 BHK
- 63 left · 795–1,191 sq ft
- Now due
- Apr 2028
- 4 months later than first promised
Where this is
Nanded, PMC, Pune, 411068
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 936 flats are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 219 units · 5 available
3 BHK 358 units · 50 available
Configuration not filed 359 units · 8 available
873 / 936
93% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
2 BHK 219 flats · 5 available
795 sq ft carpet as drawn, from 795–946 sq ft filed in this configuration
- Carpet, filed
- 795 sq ft
- Built-up
- about 954 sq ft
- Super built-up
- about 1,113 sq ft
Every room in this flat
Living and dining about 232 sq ft, Master bedroom about 154 sq ft, Second bedroom about 123 sq ft, Kitchen about 93 sq ft, Bath about 54 sq ft, Balcony about 54 sq ft, Second bath about 46 sq ft, Passage about 39 sq ft.
3 BHK 358 flats · 50 available
1,191 sq ft carpet as drawn, from 1,112–1,191 sq ft filed in this configuration
- Carpet, filed
- 1,191 sq ft
- Built-up
- about 1,429 sq ft
- Super built-up
- about 1,667 sq ft
Every room in this flat
Living and dining about 293 sq ft, Master bedroom about 195 sq ft, Second bedroom about 156 sq ft, Third bedroom about 127 sq ft, Kitchen about 117 sq ft, Bath about 68 sq ft, Balcony about 68 sq ft, Second bath about 59 sq ft, Passage about 59 sq ft, Third bath about 49 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹9,468 to ₹11,084 per sq ft |
|---|---|
| Sold and booked | 838 sold, 35 booked |
| Still available | 63 flats, 795–1191 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Nanded |
|---|---|
| Taluka | Haveli |
| Street, as filed | Sinhagad Road |
| Bounded north by | 15 M Road |
| Bounded east by | NGD 43 |
| Bounded south by | 24 M Road NRD - 14B |
| Bounded west by | 24 M Road |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Nanded City Development & Construction Co. Ltd. |
|---|---|
| Registered office | 5, Aditi Garden, Magarpatta City, Next To Deccan Harvest Restaurant, Hadapsar, Pune 411013 |
| Registered agents | 56 licensed agents may sell this project |
Professionals named on the filing
| Architect | Associated Space Designers CA/2009/45427 |
|---|---|
| Engineer | JW Consultants LLP |
| Engineer | Prashant Kanikdale STATE/R/2025/APL/20809 |
| Chartered Accountant | D R B S V & Associates 044641 |
| Chartered Accountant | SDB & Company 141687 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Format A - Legal Title Report.pdf | 24 February 2024 |
|---|---|
| Promoter's declaration, Form B Affidavit.pdf | 26 February 2024 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100055134 |
| Promoter | Nanded City Development & Construction Co. Ltd. |
| Project type | Residential / Group Housing · Building development |
| Locality | Nanded — Haveli taluka, pincode 411068 |
| Applied on | 27 February 2024 |
| Registered on | 04 March 2024 |
| Completion, as first filed | 31 December 2027 |
| Due | 30 April 2028 4 months later |
| Units declared | 936 |
| Units sold | 873 of 936 sold (93%), 63 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 04 March 2024 |
| Application reference | REA52100154814 |
| Current status | Active |
| Record last changed | 11 March 2025 · 18 months ago |
Where the sold count comes from, and whether it holds up. 873 of 936 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 936 flats and reaches the same answer — 838 sold, every one with money recorded as received against a named flat, 35 booked with a price agreed but nothing received yet, and 63 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 11 March 2025.
Common questions
- Is Aalaap - I at Nanded City registered with MahaRERA?
- Yes. It is registered as P52100055134, filed on 04 March 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Aalaap - I at Nanded City due to be handed over?
- The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Aalaap - I at Nanded City been delayed?
- Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
- What did buyers actually pay in Aalaap - I at Nanded City?
- A median of ₹10,029 per square foot of carpet, across 873 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Aalaap - I at Nanded City?
- 63 of 936 were still unsold at the promoter's last filing, in 2, 3 BHK, from 795–1,191 sq ft of carpet.
- Are there complaints against Aalaap - I at Nanded City?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Aalaap - I at Nanded City?
- Nanded City Development & Construction Co. Ltd., as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for P52100055134 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Nanded
Stock image
- Registered here
- ₹6,386
- On offer
- 1, 2 BHK
- Due
- Sep 2027
- Units
- 144
- Carpet
- 410–643
- Sold at
- ₹29.5 lakh
Stock image
- Registered here
- ₹14,585
- Due
- Jan 2030
- Units
- 56
- Carpet
- 1,633–2,017
- Sold at
- ₹2.7 crore
Stock image
- Registered here
- ₹11,167
- On offer
- 1, 2, 3 BHK
- Due
- Dec 2029
- Units
- 648
- Carpet
- 579–1,274
- Sold at
- ₹1.4 crore