Z Zomefy

RERA registered PR1260002600629 Active

Shankeshwar Tatva

Moshi, Pune · Residential / Group Housing by Munisuvrat Properties

Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.

In short

Shankeshwar Tatva in Moshi is MahaRERA-registered (PR1260002600629) and still under construction, with possession filed for July 2029. Buyers have already registered 8 sales here at a median ₹7,945 per sq ft of carpet — not an asking price. About 14% of the 56 units are sold. Munisuvrat Properties is the promoter.

Stock image, not a photograph of Shankeshwar Tatva Stock image
Where
Moshi
pincode 412105
Sold here at
₹7,945
per sq ft, 8 registered sales
Available
2 BHK
48 left · 553–711 sq ft
Now due
Jul 2029
4 months later than first promised
A stock photograph, not Shankeshwar Tatva. We have no picture of this site yet.

Where this is

Moshi, PCMC, Pune, 412105

Street map of Moshi centred on the coordinate filed for Shankeshwar Tatva, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Moshi
Taluka
Haveli
Pincode
412105
Coordinates
18.669642, 73.859480

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 56 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 56 units · 48 available

7 units 553 sq ft 51.37 sq m as filed
7 units 582 sq ft 54.1 sq m as filed
14 units 583 sq ft 54.17 sq m as filed
7 units 585 sq ft 54.34 sq m as filed
7 units 616 sq ft 57.25 sq m as filed
7 units 620 sq ft 57.62 sq m as filed
7 units 711 sq ft 66.04 sq m as filed
Units sold

8 / 56

Early sales

14% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 56 flats · 48 available

583 sq ft carpet as drawn, from 553–711 sq ft filed in this configuration

Carpet, filed
583 sq ft
Built-up
about 700 sq ft
Super built-up
about 816 sq ft
Every room in this flat

Living and dining about 170 sq ft, Master bedroom about 113 sq ft, Second bedroom about 91 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Second bath about 34 sq ft, Passage about 28 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,945 per sq ft of carpet, median of 8 registered sales
Range across those sales ₹6,276 to ₹8,393 per sq ft
Sold and booked 0 sold, 8 booked
Still available 48 flats, 553–711 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Mar 2029
Current status Due Jul 2029

Revised projection

The completion date has moved from March 2029 to July 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

GAT NO. 334(P),409/1(P),409/2, Moshi, Pune is the plot this project is built on, as filed
Revenue village Moshi
TalukaHaveli
Bounded north by Shankeshwar Sparsh Project
Bounded east by Gairan
Bounded south by Gairan and Gat / Block no. 411
Bounded west by 12 Mtrs Internal Road & Shankeshwar Sparsh Project

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMunisuvrat Properties
Registered officeShop No. 9, 10, 15 And 16,, B Wing, Mahalaxmi Heights Commercial Centre, Survey No. 32/7, Near Pimpri Central Mall, Morwadi, Pimpri Chinchwad, Pune 411018

Professionals named on the filing

Architect Karan CA/2014/63509
Engineer Raghuveer Jambhale
Chartered Accountant Ganesh Sinil Mandlecha 620213
Chartered Accountant NPSR & Associates 170951

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

15 April 2026 is when an advocate last certified the title to this land
Title report Legat Title Report.pdf 15 April 2026
Conveyance deed Sale Deed - compressed.pdf 15 April 2026 1 older version on file
Promoter's declaration, Form B FORM B Affidavit Developer (1).pdf 15 April 2026
Annexure A declaration Annex A - Declaration.pdf 18 April 2026

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1260002600629
Promoter Munisuvrat Properties
Project typeResidential / Group Housing · Building development
LocalityMoshi — Haveli taluka, pincode 412105
Applied on18 April 2026
Registered on02 June 2026
Completion, as first filed31 March 2029
Due31 July 2029 4 months later
Units declared56
Units sold 8 of 56 sold (14%), 48 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 31 August 2026
Application referenceACK14042600255
Current statusActive
Record last changed 06 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 8 of 56 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 56 flats and reaches the same answer — 0 sold, 8 booked with a price agreed but nothing received yet, and 48 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 August 2026.

Common questions

Is Shankeshwar Tatva registered with MahaRERA?
Yes. It is registered as PR1260002600629, filed on 02 June 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shankeshwar Tatva due to be handed over?
The promoter has told MahaRERA July 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shankeshwar Tatva been delayed?
Yes. The first date filed was March 2029. It now stands at July 2029, 4 months later.
What did buyers actually pay in Shankeshwar Tatva?
A median of ₹7,945 per square foot of carpet, across 8 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Shankeshwar Tatva?
48 of 56 were still unsold at the promoter's last filing, in 2 BHK, from 553–711 sq ft of carpet.
Are there complaints against Shankeshwar Tatva?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Shankeshwar Tatva?
Munisuvrat Properties, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 21 September 2026. The authority's own page for PR1260002600629 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Moshi

Stock image, not a photograph of Infinity Planet A Wing Stock image
Valued from
₹5,404
On offer
Offices + shops
Under construction

Infinity Planet A Wing

Tulip Properties · Moshi

5 sold
Slipped 4 months
Due
Oct 2027
Units
389
Carpet
90–928
Sold at
₹25.1 lakh
P52100078903
Stock image, not a photograph of Kesar Treetown Phase 3 Stock image
Registered here
₹6,998
On offer
2, 3 BHK + shops
Under construction

Kesar Treetown Phase 3

Kesar Vighnaharta Group · Moshi

91 sold
Slipped a year
Due
Dec 2026
Units
292
Carpet
127–808
Sold at
₹44.7 lakh
P52100045320