RERA registered P52100052677 Completed
Nb Towers
Moshi, Pune · Residential / Group Housing by Shekhar Infratech
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Nb Towers in Moshi is MahaRERA-registered (P52100052677) and was handed over in June 2026. Buyers have already registered 94 sales here at a median ₹9,038 per sq ft of carpet — not an asking price. About 64% of the 179 units are sold. Shekhar Infratech is the promoter.
- Sold here at
- ₹9,038
- per sq ft, 94 registered sales
- Available
- 2 BHK, 3 BHK, Shops
- 54 left · 344–841 sq ft
- Possession
- Jun 2026
- as filed with MahaRERA
Where this is
Moshi, PCMC, Pune, 412105
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 179 units are filed unit by unit with the authority, the highest on floor 20. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 81 units · 14 available
3 BHK 75 units · 39 available
Shops 23 units · 1 available
115 / 179
64% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 81 units · 14 available
670 sq ft carpet as drawn, from 529–681 sq ft filed in this configuration
- Carpet, filed
- 670 sq ft
- Built-up
- about 804 sq ft
- Super built-up
- about 938 sq ft
Every room in this unit
Living and dining about 195 sq ft, Master bedroom about 130 sq ft, Second bedroom about 104 sq ft, Kitchen about 78 sq ft, Bath about 46 sq ft, Balcony about 46 sq ft, Second bath about 39 sq ft, Passage about 33 sq ft.
3 BHK 75 units · 39 available
817 sq ft carpet as drawn, from 658–841 sq ft filed in this configuration
- Carpet, filed
- 817 sq ft
- Built-up
- about 980 sq ft
- Super built-up
- about 1,144 sq ft
Every room in this unit
Living and dining about 201 sq ft, Master bedroom about 134 sq ft, Second bedroom about 107 sq ft, Third bedroom about 87 sq ft, Kitchen about 80 sq ft, Bath about 47 sq ft, Balcony about 47 sq ft, Second bath about 40 sq ft, Passage about 40 sq ft, Third bath about 33 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹6,127 to ₹9,837 per sq ft |
|---|---|
| Sold and booked | 115 sold, 0 booked |
| Still available | 54 units, 246–841 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹22,595 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Stable projection
No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Moshi |
|---|---|
| Taluka | Haveli |
| Street, as filed | SPINE ROAD |
| Bounded north by | BALANCE PLOT OF SAME SECTOR |
| Bounded east by | BALANCE PLOT OF SAME SECTOR |
| Bounded south by | 45 METER WIDE ROAD |
| Bounded west by | 15 METER WIDE ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Shekhar Infratech |
|---|---|
| Registered office | Sector Number 11, Sector No 11, Plot Number 148, Near Tulsi Landmark, Spin Road, Pcntda, Pune 412105 |
Professionals named on the filing
| Architect | Vishal Bafana CA/2009/44257 |
|---|---|
| Engineer | Ajinkya Lahigud |
| Chartered Accountant | CA Mohmedyasir A Bagwan 625692 |
| Chartered Accountant | Vinit D Achha And Associates 145537 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report ilovepdf_merged_compressed.pdf | 6 September 2023 |
|---|---|
| Promoter's declaration, Form B FORM B AFFIDAVITE.pdf | 26 August 2023 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100052677 |
| Promoter | Shekhar Infratech |
| Project type | Residential / Group Housing · Building development |
| Locality | Moshi — Haveli taluka, pincode 412105 |
| Applied on | 27 August 2023 |
| Registered on | 20 September 2023 |
| Completion, as first filed | 30 June 2026 |
| Handed over | 30 June 2026 |
| Units declared | 179 |
| Units sold | 115 of 179 sold (64%), 64 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 15 January 2024 |
| Application reference | REA52100145554 |
| Current status | Completed |
| Record last changed | 04 December 2023 · over 2 years ago |
Where the sold count comes from, and whether it holds up. 115 of 179 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 179 units and reaches the same answer — 115 sold, every one with money recorded as received against a named unit, and 54 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 04 December 2023.
Common questions
- Is Nb Towers registered with MahaRERA?
- Yes. It is registered as P52100052677, filed on 20 September 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- Has Nb Towers been handed over?
- Yes. The completion date on the register is June 2026.
- Has Nb Towers been delayed?
- No. June 2026 is the date first filed with the authority and it has not moved since.
- What did buyers actually pay in Nb Towers?
- A median of ₹9,038 per square foot of carpet, across 94 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Nb Towers?
- 54 of 179 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 344–841 sq ft of carpet.
- Are there complaints against Nb Towers?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Nb Towers?
- Shekhar Infratech, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100052677 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Moshi
Stock image
- Registered here
- ₹6,861
- On offer
- 2 BHK
- Done
- Dec 2026
- Units
- 25
- Carpet
- 619–655
- Sold at
- ₹44.9 lakh
Stock image
- Registered here
- ₹8,542
- On offer
- 2, 3 BHK
- Done
- Jan 2026
- Units
- 104
- Carpet
- 496–1,035
- Sold at
- ₹42.7 lakh
Stock image
- Registered here
- ₹5,893
- On offer
- 1, 3 BHK
- Done
- Jun 2026
- Units
- 124
- Carpet
- 435–966
- Sold at
- ₹41.8 lakh