Z Zomefy

RERA registered P52100033399 Active

T11 named as Raheja Stellar in RV Premiere

Mohammadwadi, Pune · Residential / Group Housing by Cavalcade Properties Private Limited

Official record Updated from the register 10 October 2026. Anything filed since then is not here yet.

In short

T11 named as Raheja Stellar in RV Premiere in Mohammadwadi is MahaRERA-registered (P52100033399) and still under construction, with possession filed for December 2026. Buyers have already registered 201 sales here at a median ₹13,534 per sq ft of carpet — not an asking price. About 96% of the 209 units are sold. 1 complaint sits on the filing. Cavalcade Properties Private Limited is the promoter.

Stock image, not a photograph of T11 named as Raheja Stellar in RV Premiere Stock image
Where
Mohammadwadi
pincode 411060
Sold here at
₹13,534
per sq ft, 201 registered sales
Available
3, 4 BHK
8 left · 2,048–2,357 sq ft
Possession
Dec 2026
as filed with MahaRERA
A stock photograph, not T11 named as Raheja Stellar in RV Premiere. We have no picture of this site yet.

Where this is

Mohammadwadi, PMC, Pune, 411060

Village
MOHAMMADWADI
Taluka
Haveli
Pincode
411060

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 209 flats are filed unit by unit with the authority, the highest on floor 29. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 5 units · all sold

5 units 1128 sq ft 104.81 sq m as filed

3 BHK 120 units · 2 available

58 units 1051 sq ft 97.61 sq m as filed
60 units 1530 sq ft 142.12–142.13 sq m as filed
2 units 2048 sq ft 190.27–190.28 sq m as filed

4 BHK 84 units · 6 available

1 unit 1538 sq ft 142.91 sq m as filed
24 units 1642 sq ft 152.55 sq m as filed
1 unit 1872 sq ft 173.92 sq m as filed
58 units 2357 sq ft 218.98–219.0 sq m as filed
Units sold

201 / 209

Nearly sold out

96% absorption rate

Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 5 flats · none available

1,128 sq ft carpet as drawn

Carpet, filed
1,128 sq ft
Built-up
about 1,354 sq ft
Super built-up
about 1,579 sq ft
Every room in this flat

Living and dining about 329 sq ft, Master bedroom about 219 sq ft, Second bedroom about 175 sq ft, Kitchen about 131 sq ft, Bath about 77 sq ft, Balcony about 77 sq ft, Second bath about 66 sq ft, Passage about 55 sq ft.

3 BHK 120 flats · 2 available

1,530 sq ft carpet as drawn, from 1,051–2,048 sq ft filed in this configuration

Carpet, filed
1,530 sq ft
Built-up
about 1,836 sq ft
Super built-up
about 2,142 sq ft
Every room in this flat

Living and dining about 376 sq ft, Master bedroom about 251 sq ft, Second bedroom about 201 sq ft, Third bedroom about 163 sq ft, Kitchen about 150 sq ft, Bath about 88 sq ft, Balcony about 88 sq ft, Second bath about 75 sq ft, Passage about 75 sq ft, Third bath about 63 sq ft.

4 BHK 84 flats · 6 available

2,357 sq ft carpet as drawn, from 1,538–2,357 sq ft filed in this configuration

Carpet, filed
2,357 sq ft
Built-up
about 2,828 sq ft
Super built-up
about 3,300 sq ft
Every room in this flat

Living and dining about 524 sq ft, Master bedroom about 349 sq ft, Second bedroom about 279 sq ft, Third bedroom about 227 sq ft, Kitchen about 210 sq ft, Fourth bedroom about 210 sq ft, Bath about 122 sq ft, Balcony about 122 sq ft, Passage about 122 sq ft, Second bath about 105 sq ft, Third bath about 87 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹13,534 per sq ft of carpet, median of 201 registered sales
Range across those sales ₹12,056 to ₹16,808 per sq ft
Sold and booked 201 sold, 0 booked
Still available 8 flats, 1051–2357 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2026
Current status Due Dec 2026

Stable projection

No delay reported in the latest RERA filings. Construction is recorded against the original baseline date the promoter registered.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No.27/4 and other parts of land is the plot this project is built on, as filed
Revenue village MOHAMMADWADI · shown on this site as Mohammadwadi
TalukaHaveli
Street, as filed NIBM Road
Bounded north by Driveway
Bounded east by Driveway and RG
Bounded south by Driveway
Bounded west by Driveway

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerCavalcade Properties Private Limited
Registered officePlot No.C-30, Block G, Block G, Raheja Tower, Bandra Kurla Complex, Opp.Sidbi, Bandra East, Mumbai Suburban 400051
Registered agents 5 licensed agents may sell this project

Professionals named on the filing

Architect Malwadkar Architects Private Limited CA/93/15629
Architect Mayur Jadhav NA
Engineer JW Consultants LLP 18
Engineer Jayadrath M Gaikwad NA
Engineer Nilesh Soni
Engineer Shagaf Nallamandu
Chartered Accountant A K P J & Associates 156299
Chartered Accountant K G Somani & Co LLP 550889
Chartered Accountant S N Doshi and Associates 035645

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12503599 Oct 2025 Order passed Oct 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

6 February 2024 is when an advocate last certified the title to this land
Title report Title Report 30082023.pdf 6 February 2024 7 older versions on file
Promoter's declaration, Form B Form B Tower 11.pdf 29 February 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100033399
Promoter Cavalcade Properties Private Limited
Project typeResidential / Group Housing · Building development
LocalityMohammadwadi — Haveli taluka, pincode 411060
Applied on02 February 2022
Registered on16 February 2022
Completion, as first filed31 December 2026
Due31 December 2026
Units declared209
Units sold 201 of 209 sold (96%), 8 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 24 July 2024
Application referenceREA52100102843
Current statusActive
Record last changed 10 July 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 201 of 209 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 209 flats and reaches the same answer — 201 sold, every one with money recorded as received against a named flat, and 8 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 10 July 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is T11 named as Raheja Stellar in RV Premiere registered with MahaRERA?
Yes. It is registered as P52100033399, filed on 16 February 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is T11 named as Raheja Stellar in RV Premiere due to be handed over?
The promoter has told MahaRERA December 2026. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has T11 named as Raheja Stellar in RV Premiere been delayed?
No. December 2026 is the date first filed with the authority and it has not moved since.
What did buyers actually pay in T11 named as Raheja Stellar in RV Premiere?
A median of ₹13,534 per square foot of carpet, across 201 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in T11 named as Raheja Stellar in RV Premiere?
8 of 209 were still unsold at the promoter's last filing, in 3, 4 BHK, from 2,048–2,357 sq ft of carpet.
Are there complaints against T11 named as Raheja Stellar in RV Premiere?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building T11 named as Raheja Stellar in RV Premiere?
Cavalcade Properties Private Limited, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 10 October 2026. The authority's own page for P52100033399 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Mohammadwadi

Stock image, not a photograph of Queens Tower Stock image
Registered here
₹8,552
On offer
1, 2, 3 BHK + shops
Under construction

Queens Tower

Fineline Construction Company · Mohammadwadi

22 sold
Slipped 1.5 years
Due
Jun 2027
Units
126
Carpet
455–1,088
Sold at
₹60.6 lakh
P52100046665