In short

Shivam Heights in Mohammadwadi is MahaRERA-registered (P52100028393) and still under construction, with possession filed for March 2027. Buyers have already registered 20 sales here at a median ₹5,958 per sq ft of carpet — not an asking price. About 35% of the 62 units are sold. M/S Space Realtor is the promoter.

Stock image, not a photograph of Shivam Heights Stock image
Where
Mohammadwadi
pincode 411028
Sold here at
₹5,958
per sq ft, 20 registered sales
Available
2 BHK, 3 BHK, Shops
34 left · 208–840 sq ft
Now due
Mar 2027
3.2 years later than first promised
A stock photograph, not Shivam Heights. We have no picture of this site yet.

Where this is

Mohammadwadi, PMC, Pune, 411028

Street map of Mohammadwadi centred on the coordinate filed for Shivam Heights, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
MOHAMMADWADI
Taluka
Haveli
Pincode
411028
Coordinates
18.475146, 73.916325

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 62 units are filed unit by unit with the authority, the highest on floor 6. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 42 units · 23 available

6 units 599 sq ft 55.65 sq m as filed
6 units 668 sq ft 62.06 sq m as filed
6 units 680 sq ft 63.17 sq m as filed
6 units 693 sq ft 64.38 sq m as filed
6 units 713 sq ft 66.24 sq m as filed
6 units 720 sq ft 66.89 sq m as filed
6 units 727 sq ft 67.54 sq m as filed

3 BHK 6 units · 3 available

6 units 840 sq ft 78.04 sq m as filed

Shops 14 units · 8 available

2 units 208 sq ft 19.35 sq m as filed
2 units 251 sq ft 23.35 sq m as filed
1 unit 260 sq ft 24.17 sq m as filed
1 unit 266 sq ft 24.73 sq m as filed
1 unit 274 sq ft 25.43 sq m as filed
1 unit 275 sq ft 25.59 sq m as filed
1 unit 278 sq ft 25.87 sq m as filed
1 unit 283 sq ft 26.29 sq m as filed
1 unit 288 sq ft 26.73 sq m as filed
1 unit 304 sq ft 28.21 sq m as filed
1 unit 306 sq ft 28.42 sq m as filed
1 unit 375 sq ft 34.83 sq m as filed
Units sold

22 / 62

Early sales

35% absorption rate

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

2 BHK 42 units · 23 available

599 sq ft carpet as drawn, from 599–727 sq ft filed in this configuration

Carpet, filed
599 sq ft
Built-up
about 719 sq ft
Super built-up
about 839 sq ft
Every room in this unit

Living and dining about 174 sq ft, Master bedroom about 116 sq ft, Second bedroom about 93 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.

3 BHK 6 units · 3 available

840 sq ft carpet as drawn

Carpet, filed
840 sq ft
Built-up
about 1,008 sq ft
Super built-up
about 1,176 sq ft
Every room in this unit

Living and dining about 207 sq ft, Master bedroom about 138 sq ft, Second bedroom about 110 sq ft, Third bedroom about 90 sq ft, Kitchen about 83 sq ft, Bath about 48 sq ft, Balcony about 48 sq ft, Second bath about 41 sq ft, Passage about 41 sq ft, Third bath about 34 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹5,958 per sq ft of carpet, median of 20 registered sales
Range across those sales ₹5,275 to ₹7,649 per sq ft
Sold and booked 22 sold, 0 booked
Still available 34 units, 208–840 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

2 further sales are set aside. They divide out beyond ₹14,896 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.

Timeline audit

Original proposed Dec 2023
Current status Due Mar 2027

Revised projection

The completion date has moved from December 2023 to March 2027, 3.2 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

53 is the plot this project is built on, as filed
Revenue village MOHAMMADWADI · shown on this site as Mohammadwadi
TalukaHaveli
Street, as filed S no 53
Bounded north by Land belonging to manohar kondhalkar
Bounded east by Plot No 2 Wing C
Bounded south by D P Road and land belonging to Mr Tikhe
Bounded west by D P Road

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerM/S Space Realtor
Registered officeB-18, Kpct Mall, Fatima Nagar, Wanawadi, Pune 411013

Professionals named on the filing

Architect Ana Consortium Pvt Ltd CA/89/11974
Architect Swati Mangale 2012
Engineer Rajendra Machindra Bare
Engineer Shrikant Kamthe 12435
Chartered Accountant Manoj R Agarwal & Co 114260
Chartered Accountant Pravin Pise & Associates 151625
Chartered Accountant Shruti Agarwal 170121

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

7 February 2020 is when an advocate last certified the title to this land
Title report Search and title space realtor_compressed.pdf 7 February 2020
Promoter's declaration, Form B Form-B.pdf 13 March 2025 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100028393
Promoter M/S Space Realtor
Project typeOthers · Building development
LocalityMohammadwadi — Haveli taluka, pincode 411028
Applied on20 March 2020
Registered on02 March 2021
Completion, as first filed30 December 2023
Due31 March 2027 3.2 years later
Units declared62
Units sold 22 of 62 sold (35%), 40 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 14 August 2026
Application referenceREA52100071317
Current statusActive
Record last changed 14 August 2026 · 33 days ago

Where the sold count comes from, and whether it holds up. 22 of 62 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 62 units and reaches the same answer — 22 sold, 19 of them with money recorded as received against a named unit, and 34 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 14 August 2026.

Common questions

Is Shivam Heights registered with MahaRERA?
Yes. It is registered as P52100028393, filed on 02 March 2021, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Shivam Heights due to be handed over?
The promoter has told MahaRERA March 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Shivam Heights been delayed?
Yes. The first date filed was December 2023. It now stands at March 2027, 3.2 years later.
What did buyers actually pay in Shivam Heights?
A median of ₹5,958 per square foot of carpet, across 20 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Shivam Heights?
34 of 62 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 208–840 sq ft of carpet.
Are there complaints against Shivam Heights?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Shivam Heights?
M/S Space Realtor, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100028393 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Mohammadwadi

Stock image, not a photograph of Ganga Vasant Stock image
Registered here
₹6,122
On offer
1, 2 BHK
Under construction

Ganga Vasant

Ganraj Township LLP · Mohammadwadi

33 sold
Slipped 3.5 years
Due
Jun 2028
Units
112
Carpet
395–530
Sold at
₹29.9 lakh
P52100027099