Z Zomefy

RERA registered PC1260002501197 Active

Ganga Imperia Commercial

Mohammadwadi, Pune · Commercial by Ganraj Homes LLP

Official record Updated from the register 14 October 2026. Anything filed since then is not here yet.

In short

Ganga Imperia Commercial in Mohammadwadi is MahaRERA-registered (PC1260002501197) and still under construction, with possession filed for April 2030. No registered sale rate is on file for this project or its locality yet. About 79% of the 14 units are sold. Ganraj Homes LLP is the promoter.

Stock image, not a photograph of Ganga Imperia Commercial Stock image
Where
Mohammadwadi
pincode 411060
Price
Not filed
no agreement or valuation on the register
Available
Shops
3 left · 5,309–8,469 sq ft
Now due
Apr 2030
4 months later than first promised
A stock photograph, not Ganga Imperia Commercial. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Pune (M Corp.) · Pune City

Mohammadwadi, PMC, Pune, 411060

Street map of Mohammadwadi centred on the coordinate filed for Ganga Imperia Commercial, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village Pune (M Corp.)
Taluka Pune City
Pincode 411060
Promoter Pin Coordinates 18.464522, 73.911525

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 14 units are filed unit by unit with the authority, the highest on floor 0. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Configuration Mix & Volume Proportional share of project density
14 Total Licenced Units
Commercial Footprint • 100.0% of project

Shops Suite

3 Available 14 registered total
State Min Valuation ₹4 crore – ₹6.4 crore
ASR Govt Rate ₹7,568 / sq ft
Carpet Variations as Filed Span: 1729 to 8469 sq ft
1729 sq ft 160.66 sq m 1 unit
2192 sq ft 203.63 sq m 1 unit
2621 sq ft 243.51 sq m 1 unit
2984 sq ft 277.19 sq m 1 unit
3303 sq ft 306.9 sq m 1 unit
3382 sq ft 314.17 sq m 1 unit
3394 sq ft 315.3 sq m 1 unit
3419 sq ft 317.59 sq m 1 unit
3835 sq ft 356.27 sq m 1 unit
4443 sq ft 412.8 sq m 1 unit
5309 sq ft 493.2 sq m 1 unit
5863 sq ft 544.7 sq m 1 unit
8469 sq ft 786.77 sq m 1 unit
Govt ASR Base: ₹4 crore – ₹6.4 crore 3 of 14 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
Shops 1729 – 8469 sq ft (160.66 – 786.77 sq m) ~2075 – 10163 sq ft ~2421 – 11857 sq ft 3 left of 14
Units sold

11 / 14

Selling steadily

79% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Shops 14 units · 3 available

1,729 sq ft carpet as drawn, from 1,729–8,469 sq ft filed in this configuration

Carpet, filed
1,729 sq ft
Built-up
about 2,075 sq ft
Super built-up
about 2,421 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 months)
Original Baseline
Dec 2029
Declared at registration
Current Statutory Date
Due
Apr 2030
4 months later than filed

Revised delivery projection

The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SURVEY NO. 20 Hissa No 9 to 15 & 16(1+2+3) PLOT NO D Mohammadwadi is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Mohammadwadi
TalukaPune City
Street, as filed MOHAMMADWADI
Bounded north by 18 M WIDE DP ROAD
Bounded east by 24 M WIDE DP ROAD
Bounded south by ADJ S NO 21
Bounded west by AMENITY SPACE AND S NO 20-8

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerGanraj Homes LLP
Registered officeOffice No 6 Second Floor, 206, San Mahu Complex, 5 Bund Garden Road, Opposite Poona Club, Pune Camp, Pune 411001

Professionals named on the filing

Architect Creative Designs CA/2000/25800
Engineer Nitin Temgire
Chartered Accountant Atul Hattarge 135888
Chartered Accountant Mahesh Chandorkar 155572

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

22 September 2025 is when an advocate last certified the title to this land
Title report TITLE REPORT REVISED.pdf 22 September 2025
Conveyance deed POA - GHLLP.pdf 2 September 2025 1 older version on file
Promoter's declaration, Form B FORM B - DEVELOPER.pdf 4 October 2025
Annexure A declaration ORDER 50.pdf 9 September 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPC1260002501197
Promoter Ganraj Homes LLP
Project typeCommercial · Building development
LocalityMohammadwadi — Pune City taluka, pincode 411060
Applied on09 September 2025
Registered on13 October 2025
Completion, as first filed31 December 2029
Due30 April 2030 4 months later
Units declared14
Units sold 11 of 14 sold (79%), 3 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 13 October 2025
Application referenceACK27082503009
Current statusActive
Record last changed 04 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 11 of 14 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 14 units and reaches the same answer — 2 sold, every one with money recorded as received against a named unit, 9 booked with a price agreed but nothing received yet, and 3 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 04 August 2026.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 6 Direct Answers
Is Ganga Imperia Commercial registered with MahaRERA?
Yes. It is registered as PC1260002501197, filed on 13 October 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Ganga Imperia Commercial due to be handed over?
The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Ganga Imperia Commercial been delayed?
Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
How many units are left in Ganga Imperia Commercial?
3 of 14 were still unsold at the promoter's last filing, in Shops, from 5,309–8,469 sq ft of carpet.
Are there complaints against Ganga Imperia Commercial?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Ganga Imperia Commercial?
Ganraj Homes LLP, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 14 October 2026. The authority's own registry page for PC1260002501197 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Mohammadwadi

Stock image, not a photograph of Tenside Stock image
Nearby
₹8,855
On offer
1 BHK
Under construction

Tenside

Tenside Reality · Mohammadwadi

0 sold
Slipped 4 months
Due
Mar 2028
Units
18
Carpet
381–386
Typical flat
~₹34.2 lakh
PR1260002502245
Stock image, not a photograph of Samarth Rise Stock image
Registered here
₹6,754
On offer
1 BHK
Lapsed

Samarth Rise

Shri Samarth Developers · Mohammadwadi

40 sold

Registration lapsed

Was due
Aug 2026
Units
10
Carpet
414
Sold at
₹30.8 lakh
P52100079090