RERA registered PM1260002601008 Active
Basil Fab 11
Mohammadwadi, Pune · Mixed by KAPN Associates LLP
Official record Updated from the register 21 November 2026. Anything filed since then is not here yet.
In short
Basil Fab 11 in Mohammadwadi is MahaRERA-registered (PM1260002601008) and still under construction, with possession filed for November 2029. Buyers have already registered 6 sales here at a median ₹7,463 per sq ft of carpet — not an asking price. About 17% of the 66 units are sold. KAPN Associates LLP is the promoter.
- Sold here at
- ₹7,463
- per sq ft, 6 registered sales
- Available
- 2 BHK, 3 BHK, Office Space, Shops
- 55 left · 573–924 sq ft
- Now due
- Nov 2029
- 4 months later than first promised
Mohammadwadi, PMC, Pune, 411060
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 66 units are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK Residences
3 BHK Residences
Office Space Suite
Shops Suite
Carpet Area vs. Loading Factor Arithmetic
How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)
| Unit Configuration | Statutory RERA Carpet (Actual) | Approx Built-up (+20%) | Super Built-up (+40% Loading) | Available Inventory |
|---|---|---|---|---|
| 2 BHK | 721 sq ft (66.99 sq m) | ~865 sq ft | ~1009 sq ft | 1 left of 1 |
| 3 BHK | 901 – 902 sq ft (83.74 – 83.84 sq m) | ~1081 – 1082 sq ft | ~1261 – 1263 sq ft | 37 left of 43 |
| Office Space | 573 – 924 sq ft (53.23 – 85.87 sq m) | ~688 – 1109 sq ft | ~802 – 1294 sq ft | 13 left of 14 |
| Shops | 577 – 686 sq ft (53.65 – 63.69 sq m) | ~692 – 823 sq ft | ~808 – 960 sq ft | 4 left of 8 |
11 / 66
17% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 1 unit · 1 available
721 sq ft carpet as drawn
- Carpet, filed
- 721 sq ft
- Built-up
- about 865 sq ft
- Super built-up
- about 1,009 sq ft
Every room in this unit
Living and dining about 210 sq ft, Master bedroom about 140 sq ft, Second bedroom about 112 sq ft, Kitchen about 84 sq ft, Bath about 49 sq ft, Balcony about 49 sq ft, Second bath about 42 sq ft, Passage about 35 sq ft.
3 BHK 43 units · 37 available
901 sq ft carpet as drawn, from 901–902 sq ft filed in this configuration
- Carpet, filed
- 901 sq ft
- Built-up
- about 1,081 sq ft
- Super built-up
- about 1,261 sq ft
Every room in this unit
Living and dining about 222 sq ft, Master bedroom about 148 sq ft, Second bedroom about 118 sq ft, Third bedroom about 96 sq ft, Kitchen about 89 sq ft, Bath about 52 sq ft, Balcony about 52 sq ft, Second bath about 44 sq ft, Passage about 44 sq ft, Third bath about 37 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹7,173 to ₹11,141 per sq ft |
|---|---|
| Sold and booked | 0 sold, 11 booked |
| Still available | 55 units, 573–924 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 1 sale is left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
3 further sales are set aside. They divide out beyond ₹18,658 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Revised delivery projection
The completion date has moved from July 2029 to November 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | MOHAMMADWADI · shown on this site as Mohammadwadi |
|---|---|
| Taluka | Haveli |
| Street, as filed | Katraj-Hadapsar Bypass Rd |
| Bounded north by | Undri Mohammadwadi Road |
| Bounded east by | Land out of S.No 10/1+2A |
| Bounded south by | Land out of S.No 10/1+2A |
| Bounded west by | Land out of S.No 10/1+2A |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | KAPN Associates LLP |
|---|---|
| Registered office | 3, 1205/3/3, Business Embassy, Dr.Nanasaheb Deshpande Road, Shivaji Nagar, Pune 411004 |
Professionals named on the filing
| Architect | Cubix Architects Associates CA/2001/28514 |
|---|---|
| Engineer | CTM Engineer & Consultant 1836/19 |
| Chartered Accountant | Ajitsingh K and Associates 187464 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report compressed-5mb-Search Report RERA format_compressed.pdf | 28 May 2026 |
|---|---|
| Promoter's declaration, Form B Form B Pramotor.pdf | 28 May 2026 |
| Annexure A declaration kapn annexture A (1).pdf | 3 June 2026 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002601008 |
| Promoter | KAPN Associates LLP |
| Project type | Mixed · Building development |
| Locality | Mohammadwadi — Haveli taluka, pincode 411060 |
| Applied on | 03 June 2026 |
| Registered on | 02 July 2026 |
| Completion, as first filed | 31 July 2029 |
| Due | 30 November 2029 4 months later |
| Units declared | 66 |
| Units sold | 11 of 66 sold (17%), 55 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 02 July 2026 |
| Application reference | ACK26052601177 |
| Current status | Active |
| Record last changed | 02 July 2026 · 5 months ago |
Where the sold count comes from, and whether it holds up. 11 of 66 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 66 units and reaches the same answer — 0 sold, 11 booked with a price agreed but nothing received yet, and 55 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 02 July 2026.
- Is Basil Fab 11 registered with MahaRERA?
- Yes. It is registered as PM1260002601008, filed on 02 July 2026, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Basil Fab 11 due to be handed over?
- The promoter has told MahaRERA November 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Basil Fab 11 been delayed?
- Yes. The first date filed was July 2029. It now stands at November 2029, 4 months later.
- What did buyers actually pay in Basil Fab 11?
- A median of ₹7,463 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Basil Fab 11?
- 55 of 66 were still unsold at the promoter's last filing, in 2, 3 BHK +2 more, from 573–924 sq ft of carpet.
- Are there complaints against Basil Fab 11?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Basil Fab 11?
- KAPN Associates LLP, as the promoter named on the registration.
Verify Government Filings Yourself
This dossier restates public records as filed on 21 November 2026. The authority's own registry page for PM1260002601008 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.
MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.
Other projects in Mohammadwadi
Stock image
- Registered here
- ₹8,172
- On offer
- 2, 3 BHK
- Due
- Nov 2027
- Units
- 44
- Carpet
- 1,020–1,285
- Sold at
- ₹1 crore
Stock image
- Valued from
- ₹6,879
1 complaint
- Due
- Dec 2026
- Units
- 50
- Carpet
- 216–5,452
- Typical unit
- ~₹31.2 lakh
Stock image
- Registered here
- ₹11,210
- On offer
- 2, 3 BHK
- Due
- Dec 2026
- Units
- 114
- Carpet
- 792–2,476
- Sold at
- ₹1.2 crore