RERA registered PR1261012500899 Active

Millennium Amara Phase 2

Mamurdi, Pune · Residential / Group Housing by Millennium Developers

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Millennium Amara Phase 2 in Mamurdi is MahaRERA-registered (PR1261012500899) and still under construction, with possession filed for April 2030. Buyers have already registered 67 sales here at a median ₹7,410 per sq ft of carpet — not an asking price. Millennium Developers is the promoter.

Stock image, not a photograph of Millennium Amara Phase 2 Stock image
Where
Mamurdi
pincode 412101
Sold here at
₹7,410
per sq ft, 67 registered sales
Available
1, 2 BHK
77 left · 497–783 sq ft
Now due
Apr 2030
4 months later than first promised
A stock photograph, not Millennium Amara Phase 2. We have no picture of this site yet.

Where this is

Mamurdi, PCMC, Pune, 412101

Street map of Mamurdi centred on the coordinate filed for Millennium Amara Phase 2, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
Mamurdi
Taluka
Haveli
Pincode
412101
Coordinates
18.667533, 73.716266

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 144 flats are filed unit by unit with the authority, the highest on floor 12. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 6 units · 1 available

2 units 439 sq ft 40.79 sq m as filed
4 units 497 sq ft 46.17 sq m as filed

2 BHK 138 units · 76 available

10 units 680 sq ft 63.17 sq m as filed
12 units 687 sq ft 63.82 sq m as filed
20 units 772 sq ft 71.73 sq m as filed
24 units 780 sq ft 72.47 sq m as filed
72 units 783 sq ft 72.75 sq m as filed
Units sold

38 / 144

Early sales

26% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 6 flats · 1 available

497 sq ft carpet as drawn, from 439–497 sq ft filed in this configuration

Carpet, filed
497 sq ft
Built-up
about 596 sq ft
Super built-up
about 696 sq ft
Every room in this flat

Living and dining about 186 sq ft, Master bedroom about 124 sq ft, Kitchen about 75 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Passage about 25 sq ft.

2 BHK 138 flats · 76 available

783 sq ft carpet as drawn, from 680–783 sq ft filed in this configuration

Carpet, filed
783 sq ft
Built-up
about 940 sq ft
Super built-up
about 1,096 sq ft
Every room in this flat

Living and dining about 228 sq ft, Master bedroom about 152 sq ft, Second bedroom about 122 sq ft, Kitchen about 91 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 46 sq ft, Passage about 38 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,410 per sq ft of carpet, median of 67 registered sales
Range across those sales ₹6,345 to ₹8,461 per sq ft
Sold and booked 67 sold, 0 booked
Still available 77 flats, 439–783 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2029
Current status Due Apr 2030

Revised projection

The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S.No.5/1B(P) & 5/1A(P) of Mouje-Mamurdi is the plot this project is built on, as filed
Revenue village Mamurdi
TalukaHaveli
Street, as filed Little Earth Road
Bounded north by Balance Property of Sr no 5
Bounded east by Millennium Amara Phase 1
Bounded south by Bal. Property of Sr no 5
Bounded west by Property bearing Sr no 4

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerMillennium Developers
Registered office1st Floor, Shop No. 21, Metro 9 Building, Rahatani, Opp To Park Street, Pune 411017

Professionals named on the filing

Architect Vastu Shaili CA/2010/49391
Engineer Salim Shaikh
Engineer Santosh Salunkhe 0106763400
Engineer Sujit Kondekar
Chartered Accountant Mrk & Company 634307
Chartered Accountant Pgmj & Associates 134039
Chartered Accountant Soniya Goel & Associates 410498

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

18 August 2025 is when an advocate last certified the title to this land
Title report R1 Title Flow_merged (1).pdf 18 August 2025 2 older versions on file
Conveyance deed Declaration of seperate Phase.pdf 6 August 2025 10 older versions on file
Promoter's declaration, Form B blank.pdf 18 August 2025 1 older version on file
Annexure A declaration Annexure A Order 50-2024.pdf 8 May 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberPR1261012500899
Promoter Millennium Developers
Project typeResidential / Group Housing · Building development
LocalityMamurdi — Haveli taluka, pincode 412101
Applied on28 May 2025
Registered on22 September 2025
Completion, as first filed31 December 2029
Due30 April 2030 4 months later
Units declared144
Units sold 38 of 144 sold (26%), 106 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 20 May 2026
Application referenceACK06052500067
Current statusActive
Record last changed 13 May 2026 · 5 months ago

Where the sold count comes from, and whether it holds up. 38 of 144 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 38 of 144 sold, leaving 106. The unit-by-unit list they file separately covers 144 flats and marks 67 sold with 77 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a flat is free. Either way, this is only as current as the last change to the record, 13 May 2026.

Common questions

Is Millennium Amara Phase 2 registered with MahaRERA?
Yes. It is registered as PR1261012500899, filed on 22 September 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Millennium Amara Phase 2 due to be handed over?
The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Millennium Amara Phase 2 been delayed?
Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
What did buyers actually pay in Millennium Amara Phase 2?
A median of ₹7,410 per square foot of carpet, across 67 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Millennium Amara Phase 2?
77 of 144 were still unsold at the promoter's last filing, in 1, 2 BHK, from 497–783 sq ft of carpet.
Are there complaints against Millennium Amara Phase 2?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Millennium Amara Phase 2?
Millennium Developers, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for PR1261012500899 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Mamurdi

Stock image, not a photograph of Meriton Heights Stock image
Registered here
₹8,048
On offer
1, 2, 3 BHK +3 more
Under construction

Meriton Heights

RBS Builder & Developers · Mamurdi

26 sold
Slipped 4 months
Due
Apr 2028
Units
382
Carpet
228–9,762
Sold at
₹55 lakh
P52100053019