Sportsville Phase 1

Maan, Pune · Residential / Group Housing by Yellowstone Skyscrapers LLP

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Sportsville Phase 1 in Maan is MahaRERA-registered (P52100056334) and still under construction, with possession filed for April 2028. Buyers have already registered 56 sales here at a median ₹3,373 per sq ft of carpet — not an asking price. About 80% of the 70 units are sold. Yellowstone Skyscrapers LLP is the promoter.

Stock image, not a photograph of Sportsville Phase 1 Stock image
Where
Maan
pincode 411057
Sold here at
₹3,373
per sq ft, 56 registered sales
Available
1 BHK
14 left · 456 sq ft
Now due
Apr 2028
4 months later than first promised
A stock photograph, not Sportsville Phase 1. We have no picture of this site yet.

Where this is

Maan, PMRDA, Pune, 411057

Village
Man
Taluka
Mulshi
Pincode
411057
Coordinates
18.574351, 73.722519

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 70 flats are filed unit by unit with the authority, the highest on floor 18. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

1 BHK 70 units · 14 available

70 units 456 sq ft 42.35 sq m as filed
Units sold

56 / 70

Nearly sold out

80% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

1 BHK 70 flats · 14 available

456 sq ft carpet as drawn

Carpet, filed
456 sq ft
Built-up
about 547 sq ft
Super built-up
about 638 sq ft
Every room in this flat

Living and dining about 171 sq ft, Master bedroom about 114 sq ft, Kitchen about 68 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Passage about 23 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹3,373 per sq ft of carpet, median of 56 registered sales
Range across those sales ₹3,373 to ₹3,373 per sq ft
Sold and booked 56 sold, 0 booked
Still available 14 flats, 456 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2027
Current status Due Apr 2028

Revised projection

The completion date has moved from December 2027 to April 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

S NO 47/1/A P VILLAGE MAAN TAL MULSHI DIST PUNE is the plot this project is built on, as filed
Revenue village Man · shown on this site as Maan
TalukaMulshi
Street, as filed MAAN
Bounded north by S NO 42 PROPOSED 110 MTR RING ROAD AND S NO 52
Bounded east by BY S NO 52 and 49
Bounded south by S NO 47 P S NO 48 AND S NO 49 P
Bounded west by SURVEY NO 47 1 A PART PROPOSED 110 MTR RING ROAD

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerYellowstone Skyscrapers LLP
Registered officeA 102, ,, Icc Trade Tower, Senapati Bapat Road, Near Pavillion Mall, Pune 411016

Professionals named on the filing

Architect Ar.Hrishikesh Kulkarni CA/2002/29235
Engineer Planedge Consultants Pvt. Ltd REG/PMC/STE/1227/22
Chartered Accountant Bhandari S A A J & Associates 032548
Chartered Accountant Jayesh N Jain & Associates 600461
Chartered Accountant Vinod N Nikam 141559

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

25 April 2024 is when an advocate last certified the title to this land
Title report Title Report RERA.pdf 25 April 2024
Promoter's declaration, Form B FORM B.pdf 26 April 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100056334
Promoter Yellowstone Skyscrapers LLP
Project typeResidential / Group Housing · Building development
LocalityMaan — Mulshi taluka, pincode 411057
Applied on26 April 2024
Registered on29 May 2024
Completion, as first filed31 December 2027
Due30 April 2028 4 months later
Units declared70
Units sold 56 of 70 sold (80%), 14 still unsold
Complaints0 on record with MahaRERA
Certificate on file Original registration certificate, issued 29 May 2024
Application referenceREA52100157620
Current statusActive
Record last changed 29 May 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 56 of 70 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 70 flats and reaches the same answer — 56 sold, every one with money recorded as received against a named flat, and 14 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 29 May 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Sportsville Phase 1 registered with MahaRERA?
Yes. It is registered as P52100056334, filed on 29 May 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Sportsville Phase 1 due to be handed over?
The promoter has told MahaRERA April 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Sportsville Phase 1 been delayed?
Yes. The first date filed was December 2027. It now stands at April 2028, 4 months later.
What did buyers actually pay in Sportsville Phase 1?
A median of ₹3,373 per square foot of carpet, across 56 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Sportsville Phase 1?
14 of 70 were still unsold at the promoter's last filing, in 1 BHK, from 456 sq ft of carpet.
Are there complaints against Sportsville Phase 1?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Sportsville Phase 1?
Yellowstone Skyscrapers LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100056334 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.