Z Zomefy

RERA registered P52100055358 Active

Building C1 Eon Homes

Maan, Pune · Residential / Group Housing by Hinjawadi Infradevelopment Pvt Ltd

Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.

In short

Building C1 Eon Homes in Maan is MahaRERA-registered (P52100055358) and still under construction, with possession filed for May 2029. Buyers have already registered 47 sales here at a median ₹13,043 per sq ft of carpet — not an asking price. About 52% of the 91 units are sold. 1 complaint sits on the filing. Hinjawadi Infradevelopment Pvt Ltd is the promoter.

Stock image, not a photograph of Building C1 Eon Homes Stock image
Where
Maan
pincode 411057
Sold here at
₹13,043
per sq ft, 47 registered sales
Available
3 BHK
44 left · 1,150 sq ft
Now due
May 2029
4 months later than first promised
A stock photograph, not Building C1 Eon Homes. We have no picture of this site yet.

Where this is

Maan, PMRDA, Pune, 411057

Village
Man
Taluka
Mulshi
Pincode
411057
Coordinates
18.578948, 73.689265

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 91 flats are filed unit by unit with the authority, the highest on floor 23. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 91 units · 44 available

91 units 1150 sq ft 106.8–106.84 sq m as filed
Units sold

47 / 91

Selling steadily

52% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 91 flats · 44 available

1,150 sq ft carpet as drawn

Carpet, filed
1,150 sq ft
Built-up
about 1,380 sq ft
Super built-up
about 1,610 sq ft
Every room in this flat

Living and dining about 283 sq ft, Master bedroom about 189 sq ft, Second bedroom about 151 sq ft, Third bedroom about 123 sq ft, Kitchen about 113 sq ft, Bath about 66 sq ft, Balcony about 66 sq ft, Second bath about 57 sq ft, Passage about 57 sq ft, Third bath about 47 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹13,043 per sq ft of carpet, median of 47 registered sales
Range across those sales ₹9,130 to ₹13,539 per sq ft
Sold and booked 41 sold, 6 booked
Still available 44 flats, 1150–1150 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jan 2029
Current status Due May 2029

Revised projection

The completion date has moved from January 2029 to May 2029, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Plot R-3/1 part is the plot this project is built on, as filed
Revenue village Man · shown on this site as Maan
TalukaMulshi
Street, as filed Rajeev Gandhi IT Park Hinjawadi Phase III
Bounded north by Building C2
Bounded east by Portion of layout
Bounded south by Portion of layout
Bounded west by Portion of layout

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerHinjawadi Infradevelelopment Private Limited
Registered office1, 202, Adams Court, Baner Road, Opp.Hotel Mahabaleshwar, Baner, Pune 411045
Registered agents 13 licensed agents may sell this project

Professionals named on the filing

Chartered Accountant Mantri Maru and Co. 148821

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 1 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12504366 Dec 2025 Order passed Dec 2025

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

24 January 2024 is when an advocate last certified the title to this land
Title report Title Report.pdf 24 January 2024
Promoter's declaration, Form B Form B Affidavit cum declaration.PDF 24 January 2024

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100055358
Promoter Hinjawadi Infradevelopment Pvt Ltd
Project typeResidential / Group Housing · Building development
LocalityMaan — Mulshi taluka, pincode 411057
Applied on24 January 2024
Registered on22 March 2024
Completion, as first filed31 January 2029
Due31 May 2029 4 months later
Units declared91
Units sold 47 of 91 sold (52%), 44 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 22 March 2024
Application referenceREA52100152603
Current statusActive
Record last changed 22 March 2024 · over 2 years ago 2 years untouched

Where the sold count comes from, and whether it holds up. 47 of 91 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 91 flats and reaches the same answer — 41 sold, every one with money recorded as received against a named flat, 6 booked with a price agreed but nothing received yet, and 44 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 22 March 2024.

MahaRERA has not recorded a change to this project's record in 2 years, while still listing it as under construction. That date moves on status changes and system updates as well as on anything the promoter files, so it is not proof the site is idle — but on a project still being sold, it is worth asking the promoter what has been filed since.

Common questions

Is Building C1 Eon Homes registered with MahaRERA?
Yes. It is registered as P52100055358, filed on 22 March 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Building C1 Eon Homes due to be handed over?
The promoter has told MahaRERA May 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Building C1 Eon Homes been delayed?
Yes. The first date filed was January 2029. It now stands at May 2029, 4 months later.
What did buyers actually pay in Building C1 Eon Homes?
A median of ₹13,043 per square foot of carpet, across 47 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Building C1 Eon Homes?
44 of 91 were still unsold at the promoter's last filing, in 3 BHK, from 1,150 sq ft of carpet.
Are there complaints against Building C1 Eon Homes?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Building C1 Eon Homes?
Hinjawadi Infradevelopment Pvt Ltd, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100055358 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Maan

Stock image, not a photograph of Parth Kiona Stock image
Registered here
₹9,653
On offer
1, 2 BHK
Under construction

Parth Kiona

Edenic Enterprises Pvt Ltd · Maan

60 sold
Due
Dec 2029
Units
244
Carpet
518–682
Sold at
₹64.8 lakh
P52100055852