RERA registered P52100046370 Active
Tungabhadra Co Op Hsg Soc
Kothrud, Pune · Residential / Group Housing by Pravin Keshav Badhekar
Official record Updated from the register 12 September 2026. Anything filed since then is not here yet.
In short
Tungabhadra Co Op Hsg Soc in Kothrud is MahaRERA-registered (P52100046370). Possession was filed for August 2026, and that date has passed without a handover on the register. Buyers have already registered 9 sales here at a median ₹13,743 per sq ft of carpet — not an asking price. About 22% of the 40 units are sold. Pravin Keshav Badhekar is the promoter.
- Sold here at
- ₹13,743
- per sq ft, 9 registered sales
- Available
- 1, 2, 3 BHK
- 31 left · 489–1,115 sq ft
- Was due
- Aug 2026
- 14 days past its date, not handed over
Where this is
Kothrud, PMC, Pune, 411038
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Flat sizes on file
All 40 flats are filed unit by unit with the authority, the highest on floor 10. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 1 unit · all available
2 BHK 20 units · 15 available
3 BHK 19 units · 15 available
9 / 40
22% absorption rate
Visual area guide See what the filed sizes feel like 3 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.
1 BHK 1 flat · 1 available
489 sq ft carpet as drawn
- Carpet, filed
- 489 sq ft
- Built-up
- about 587 sq ft
- Super built-up
- about 685 sq ft
Every room in this flat
Living and dining about 183 sq ft, Master bedroom about 122 sq ft, Kitchen about 73 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Passage about 24 sq ft.
2 BHK 20 flats · 15 available
602 sq ft carpet as drawn, from 576–813 sq ft filed in this configuration
- Carpet, filed
- 602 sq ft
- Built-up
- about 722 sq ft
- Super built-up
- about 843 sq ft
Every room in this flat
Living and dining about 175 sq ft, Master bedroom about 117 sq ft, Second bedroom about 94 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 29 sq ft.
3 BHK 19 flats · 15 available
1,096 sq ft carpet as drawn, from 976–1,115 sq ft filed in this configuration
- Carpet, filed
- 1,096 sq ft
- Built-up
- about 1,315 sq ft
- Super built-up
- about 1,534 sq ft
Every room in this flat
Living and dining about 270 sq ft, Master bedroom about 180 sq ft, Second bedroom about 144 sq ft, Third bedroom about 117 sq ft, Kitchen about 108 sq ft, Bath about 63 sq ft, Balcony about 63 sq ft, Second bath about 54 sq ft, Passage about 54 sq ft, Third bath about 45 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹10,584 to ₹15,495 per sq ft |
|---|---|
| Sold and booked | 7 sold, 2 booked |
| Still available | 31 flats, 489–1115 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from April 2025 to August 2026, 16 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kothrud |
|---|---|
| Taluka | Haveli |
| Street, as filed | LOKMANYA COLONY |
| Bounded north by | SNEH CO OP HSG SOC LTD |
| Bounded east by | SHIVRAJ CO OP HSG SOC LTD |
| Bounded south by | 9M INTERNAL ROAD |
| Bounded west by | 6M INTERNAL ROAD |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Badhekar Developers |
|---|---|
| Registered office | 2, S. No. 140/A, Disha Palace, Karve Road, Yashwantrao Chavan Natyagruha, Bhelke Nagar, Pune 411038 |
Professionals named on the filing
| Architect | Paras Netragaonkar CA/96/19695 |
|---|---|
| Engineer | Dipali Kulkarni 0743/17 |
| Engineer | Structus Consultantss Pvt Ltd 87 |
| Chartered Accountant | Dinesh Gandhi 044008 |
| Chartered Accountant | Shrikant Mantri And Co. 111204 |
| Chartered Accountant | Shrikant Mantri 111204 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Title Search Tungabhadra.pdf | 4 May 2022 |
|---|---|
| Promoter's declaration, Form B Tungabhadra Form B 310826.pdf | 5 April 2025 2 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100046370 |
| Promoter | Pravin Keshav Badhekar |
| Project type | Residential / Group Housing · Building development |
| Locality | Kothrud — Haveli taluka, pincode 411038 |
| Applied on | 15 April 2022 |
| Registered on | 22 June 2022 |
| Completion, as first filed | 30 April 2025 |
| Was due | 31 August 2026 16 months later |
| Units declared | 40 |
| Units sold | 9 of 40 sold (22%), 31 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 20 July 2022 |
| Application reference | REA52100106736 |
| Current status | Active |
| Record last changed | 11 April 2025 · 17 months ago |
Where the sold count comes from, and whether it holds up. 9 of 40 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 40 flats and reaches the same answer — 7 sold, every one with money recorded as received against a named flat, 2 booked with a price agreed but nothing received yet, and 31 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 11 April 2025.
Common questions
- Is Tungabhadra Co Op Hsg Soc registered with MahaRERA?
- Yes. It is registered as P52100046370, filed on 22 June 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When was Tungabhadra Co Op Hsg Soc due to be handed over?
- August 2026, and that date has passed without a handover being filed — 14 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
- What did buyers actually pay in Tungabhadra Co Op Hsg Soc?
- A median of ₹13,743 per square foot of carpet, across 9 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many flats are left in Tungabhadra Co Op Hsg Soc?
- 31 of 40 were still unsold at the promoter's last filing, in 1, 2, 3 BHK, from 489–1,115 sq ft of carpet.
- Are there complaints against Tungabhadra Co Op Hsg Soc?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Tungabhadra Co Op Hsg Soc?
- Pravin Keshav Badhekar, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 12 September 2026. The authority's own page for P52100046370 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kothrud
Stock image
- Nearby
- ₹15,282–17,382
- On offer
- 2, 3 BHK
- Due
- Apr 2028
- Units
- 21
- Carpet
- 843–1,099
- Typical flat
- ~₹1.5 crore
Stock image
- Nearby
- ₹13,538–17,382
- On offer
- 2, 3 BHK + 1 RK
- Due
- Dec 2028
- Units
- 13
- Carpet
- 300–1,302
- Typical flat
- ~₹1.1 crore
Stock image
- Registered here
- ₹17,548
- On offer
- 2, 3 BHK
- Due
- Oct 2026
- Units
- 28
- Carpet
- 721–1,052
- Sold at
- ₹1.5 crore