Z Zomefy

RERA registered P52100047348 Active

Space Paramount Tower

Kondhwa Khurd, Pune · Residential / Group Housing by Azhar Zuber Shaikh

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Space Paramount Tower in Kondhwa Khurd is MahaRERA-registered (P52100047348) and still under construction, with possession filed for April 2027. Buyers have already registered 19 sales here at a median ₹9,597 per sq ft of carpet — not an asking price. About 42% of the 48 units are sold. Azhar Zuber Shaikh is the promoter.

Stock image, not a photograph of Space Paramount Tower Stock image
Where
Kondhwa Khurd
pincode 411048
Sold here at
₹9,597
per sq ft, 19 registered sales
Available
3 BHK
28 left · 1,053–1,507 sq ft
Now due
Apr 2027
a year later than first promised
A stock photograph, not Space Paramount Tower. We have no picture of this site yet.

Where this is

Kondhwa Khurd, PMC, Pune, 411048

Street map of Kondhwa Khurd centred on the coordinate filed for Space Paramount Tower, about 1.4 km across.
Streets within about 700 m of the pin the promoter filed. Map data © OpenStreetMap contributors.
Village
kondhwa khurd
Taluka
Haveli
Pincode
411048
Coordinates
18.467222, 73.900556

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 48 flats are filed unit by unit with the authority, the highest on floor 16. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 48 units · 28 available

1 unit 108 sq ft 10.0 sq m as filed
15 units 1053 sq ft 97.8 sq m as filed
2 units 1074 sq ft 99.77 sq m as filed
27 units 1173 sq ft 109.0 sq m as filed
1 unit 1268 sq ft 117.82 sq m as filed
2 units 1507 sq ft 140.03 sq m as filed
Units sold

20 / 48

Selling steadily

42% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

3 BHK 48 flats · 28 available

1,173 sq ft carpet as drawn, from 108–1,507 sq ft filed in this configuration

Carpet, filed
1,173 sq ft
Built-up
about 1,408 sq ft
Super built-up
about 1,642 sq ft
Every room in this flat

Living and dining about 288 sq ft, Master bedroom about 192 sq ft, Second bedroom about 154 sq ft, Third bedroom about 125 sq ft, Kitchen about 115 sq ft, Bath about 67 sq ft, Balcony about 67 sq ft, Second bath about 58 sq ft, Passage about 58 sq ft, Third bath about 48 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹9,597 per sq ft of carpet, median of 19 registered sales
Range across those sales ₹8,608 to ₹11,052 per sq ft
Sold and booked 12 sold, 8 booked
Still available 28 flats, 108–1507 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. 1 sale is left out of the median because the filed area or price is not credible — the register is typed in by promoters and some entries are wrong. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed May 2026
Current status Due Apr 2027

Revised projection

The completion date has moved from May 2026 to April 2027, a year later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

SR NO 29 PLOT NO 14 & 15 is the plot this project is built on, as filed
Revenue village kondhwa khurd · shown on this site as Kondhwa Khurd
TalukaHaveli
Street, as filed NIBM
Bounded north by BY ROAD
Bounded east by BY PLOT NO 13 OUT OF THE SAID PRIVATE LAYOUT
Bounded south by PARTLY BY LAND BEARING SURVEY NO 34 KONDHWA KHURD
Bounded west by BY PLOT NO 16 OUT OF THE SAID PRIVATE LAYOUT

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerAzhar Zuber Shaikh
Registered officeFl 1, Megaspace, 13 Solapur Bazar Road, Near Deccan Tower, Camp, Pune 411001

Professionals named on the filing

Architect Space Designer Studio CA/2010/47093
Engineer SK Consultants & Engineer STATE/R/2024/APL/14306
Engineer Sultan Moinuddin Shaikh REG/PMC/STE/0721/23
Chartered Accountant Chirag P. Shah & Co. 176223
Chartered Accountant Rutuja Narsingh & Associates 188808
Chartered Accountant Rutuja Narsingh & Associates 188808
Chartered Accountant Vipin Gujarathi & Associates 160070

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

12 October 2022 is when an advocate last certified the title to this land
Title report 01-04.pdf 12 October 2022 1 older version on file
Promoter's declaration, Form B form b.pdf 26 March 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100047348
Promoter Azhar Zuber Shaikh
Project typeResidential / Group Housing · Building development
LocalityKondhwa Khurd — Haveli taluka, pincode 411048
Applied on27 September 2022
Registered on20 October 2022
Completion, as first filed01 May 2026
Due27 April 2027 a year later
Units declared48
Units sold 20 of 48 sold (42%), 28 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 12 August 2026
Application referenceREA52100120772
Current statusActive
Record last changed 06 July 2025 · 15 months ago

Where the sold count comes from, and whether it holds up. 20 of 48 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 48 flats and reaches the same answer — 12 sold, every one with money recorded as received against a named flat, 8 booked with a price agreed but nothing received yet, and 28 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 July 2025.

Common questions

Is Space Paramount Tower registered with MahaRERA?
Yes. It is registered as P52100047348, filed on 20 October 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Space Paramount Tower due to be handed over?
The promoter has told MahaRERA April 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Space Paramount Tower been delayed?
Yes. The first date filed was May 2026. It now stands at April 2027, a year later.
What did buyers actually pay in Space Paramount Tower?
A median of ₹9,597 per square foot of carpet, across 19 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Space Paramount Tower?
28 of 48 were still unsold at the promoter's last filing, in 3 BHK, from 1,053–1,507 sq ft of carpet.
Are there complaints against Space Paramount Tower?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Space Paramount Tower?
Azhar Zuber Shaikh, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100047348 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kondhwa Khurd

Stock image, not a photograph of Noon Paradise Stock image
Nearby
₹8,046–9,130
On offer
2, 3 BHK
Under construction

Noon Paradise

Noon Development LLP · Kondhwa Khurd

0 sold
Slipped 4 months
Due
May 2028
Units
24
Carpet
605–1,005
Typical flat
~₹53.5 lakh
PR1260002501800