RERA registered P52100077582 Active
Memar Elara
Kondhwa Khurd, Pune · Others by Memar Infracon
Official record Updated from the register 24 September 2026. Anything filed since then is not here yet.
In short
Memar Elara in Kondhwa Khurd is MahaRERA-registered (P52100077582) and still under construction, with possession filed for April 2029. Buyers have already registered 21 sales here at a median ₹5,697 per sq ft of carpet — not an asking price. About 56% of the 41 units are sold. Memar Infracon is the promoter.
- Sold here at
- ₹5,697
- per sq ft, 21 registered sales
- Available
- 2 BHK, 3 BHK, Shops
- 18 left · 238–870 sq ft
- Now due
- Apr 2029
- 4 months later than first promised
Where this is
Kondhwa Khurd, PMC, Pune, 411048
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 41 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
2 BHK 21 units · 7 available
3 BHK 14 units · 6 available
Shops 6 units · 5 available
23 / 41
56% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
2 BHK 21 units · 7 available
614 sq ft carpet as drawn, from 614–655 sq ft filed in this configuration
- Carpet, filed
- 614 sq ft
- Built-up
- about 737 sq ft
- Super built-up
- about 860 sq ft
Every room in this unit
Living and dining about 179 sq ft, Master bedroom about 119 sq ft, Second bedroom about 95 sq ft, Kitchen about 72 sq ft, Bath about 42 sq ft, Balcony about 42 sq ft, Second bath about 36 sq ft, Passage about 30 sq ft.
3 BHK 14 units · 6 available
870 sq ft carpet as drawn
- Carpet, filed
- 870 sq ft
- Built-up
- about 1,044 sq ft
- Super built-up
- about 1,218 sq ft
Every room in this unit
Living and dining about 214 sq ft, Master bedroom about 143 sq ft, Second bedroom about 114 sq ft, Third bedroom about 93 sq ft, Kitchen about 86 sq ft, Bath about 50 sq ft, Balcony about 50 sq ft, Second bath about 43 sq ft, Passage about 43 sq ft, Third bath about 36 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,138 to ₹11,756 per sq ft |
|---|---|
| Sold and booked | 0 sold, 23 booked |
| Still available | 18 units, 238–870 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
1 further sale is set aside. It divides out beyond ₹14,241 per sq ft, more than two and a half times this project's own median. A unit does not cost that much more than its neighbours on the same price list, so the usual cause is a carpet area filed too small for the agreement value printed beside it. Both figures are on the register exactly as shown — you can check them in the register itself — but no rate is computed from them here. Counted rather than quietly dropped.
Timeline audit
Revised projection
The completion date has moved from December 2028 to April 2029, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | kondhwa khurd · shown on this site as Kondhwa Khurd |
|---|---|
| Taluka | Haveli |
| Street, as filed | Next to Ashoka Mews Society |
| Bounded north by | Property of Ashoka Mews Co-op Hsg Soc |
| Bounded east by | 9 mtr wide road |
| Bounded south by | Property of Sr No 41 Hissa No 2A |
| Bounded west by | Property of Ashoka Mews Co-op Hsg Soc |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Memar Infracon |
|---|---|
| Registered office | Flat No. 104, 1st Floor, Sara Residency, Sr. No. 43, Near Unity Park, Kondhwa Khurd, Pune 411048 |
Professionals named on the filing
| Architect | Aetrium Design Studio CA/2018/100828 |
|---|---|
| Engineer | Javid Iqbal Shaikh NA |
| Chartered Accountant | P N Thombre & Associates 634859 |
| Chartered Accountant | SCT & Company 161385 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Adv Imtiyaz Tiltle Report 412B_compressed.pdf | 22 July 2024 2 older versions on file |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 22 July 2024 2 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100077582 |
| Promoter | Memar Infracon |
| Project type | Others · Building development |
| Locality | Kondhwa Khurd — Haveli taluka, pincode 411048 |
| Applied on | 24 July 2024 |
| Registered on | 15 October 2024 |
| Completion, as first filed | 31 December 2028 |
| Due | 30 April 2029 4 months later |
| Units declared | 41 |
| Units sold | 23 of 41 sold (56%), 18 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 15 October 2024 |
| Application reference | REA52100164100 |
| Current status | Active |
| Record last changed | 15 October 2024 · 23 months ago |
Where the sold count comes from, and whether it holds up. 23 of 41 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 41 units and reaches the same answer — 0 sold, 23 booked with a price agreed but nothing received yet, and 18 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 15 October 2024.
Common questions
- Is Memar Elara registered with MahaRERA?
- Yes. It is registered as P52100077582, filed on 15 October 2024, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Memar Elara due to be handed over?
- The promoter has told MahaRERA April 2029. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Memar Elara been delayed?
- Yes. The first date filed was December 2028. It now stands at April 2029, 4 months later.
- What did buyers actually pay in Memar Elara?
- A median of ₹5,697 per square foot of carpet, across 21 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Memar Elara?
- 18 of 41 were still unsold at the promoter's last filing, in 2, 3 BHK + shops, from 238–870 sq ft of carpet.
- Are there complaints against Memar Elara?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Memar Elara?
- Memar Infracon, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 24 September 2026. The authority's own page for P52100077582 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kondhwa Khurd
Stock image
- Nearby
- ₹8,047–9,130
- On offer
- 2, 3 BHK
- Due
- Dec 2030
- Units
- 16
- Carpet
- 1,015–1,227
- Typical flat
- ~₹97.3 lakh
Stock image
- Nearby
- ₹8,047–9,130
- On offer
- 2, 3 BHK
- Due
- Dec 2030
- Units
- 34
- Carpet
- 749–1,227
- Typical flat
- ~₹69.4 lakh
Stock image
- Registered here
- ₹9,216
- On offer
- 2 BHK
- Due
- Jun 2030
- Units
- 30
- Carpet
- 749–857
- Sold at
- ₹73.9 lakh