Z Zomefy

RERA registered P52100048100 Completed

Adhish Residency

Kondhwa Budruk, Pune · Residential / Group Housing by A B Associates

Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.

In short

Adhish Residency in Kondhwa Budruk is MahaRERA-registered (P52100048100) and was handed over in October 2025. Buyers have already registered 43 sales here at a median ₹6,867 per sq ft of carpet — not an asking price. About 88% of the 49 units are sold. A B Associates is the promoter.

Stock image, not a photograph of Adhish Residency Stock image
Where
Kondhwa Budruk
pincode 411048
Sold here at
₹6,867
per sq ft, 43 registered sales
Available
2 BHK
6 left · 666 sq ft
Now due
Oct 2025
10 months later than first promised
A stock photograph, not Adhish Residency. We have no picture of this site yet.

Where this is

Kondhwa Budruk, PMC, Pune, 411048

Village
kondhwa BK
Taluka
Haveli
Pincode
411048

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 49 flats are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 49 units · 6 available

7 units 555 sq ft 51.56 sq m as filed
21 units 633 sq ft 58.85 sq m as filed
14 units 666 sq ft 61.87 sq m as filed
7 units 691 sq ft 64.21 sq m as filed
Units sold

43 / 49

Nearly sold out

88% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 49 flats · 6 available

633 sq ft carpet as drawn, from 555–691 sq ft filed in this configuration

Carpet, filed
633 sq ft
Built-up
about 760 sq ft
Super built-up
about 886 sq ft
Every room in this flat

Living and dining about 184 sq ft, Master bedroom about 123 sq ft, Second bedroom about 98 sq ft, Kitchen about 74 sq ft, Bath about 43 sq ft, Balcony about 43 sq ft, Second bath about 37 sq ft, Passage about 31 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹6,867 per sq ft of carpet, median of 43 registered sales
Range across those sales ₹6,315 to ₹7,568 per sq ft
Sold and booked 43 sold, 0 booked
Still available 6 flats, 555–691 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Dec 2024
Current status Handed over Oct 2025

Revised projection

The completion date has moved from December 2024 to October 2025, 10 months later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

58/5/1 + 5/2 + 6/1 & 58/3 (P) is the plot this project is built on, as filed
Revenue village kondhwa BK · shown on this site as Kondhwa Budruk
TalukaHaveli
Street, as filed Kondhwa
Bounded north by Road Shravan Apartment Society
Bounded east by Vitronics Company
Bounded south by Kamal Villa Society
Bounded west by S no 58 5 3A

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerA B Associates
Registered office608, Aaroh Dwelling, Dattanagar, Pune, Chowk 411046

Professionals named on the filing

Architect Sawan Chandak CA/2011/53219
Engineer Kalyani Sunil Jadhav 1621
Chartered Accountant Ganesh Prabhakar Dhindle 629374
Chartered Accountant Milind Padmakar Tilwankar 047498

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

2 December 2022 is when an advocate last certified the title to this land
Title report SEARCH REPORT 14R.pdf 2 December 2022
Promoter's declaration, Form B AFFIDAVIT FORM B.pdf 26 November 2024 1 older version on file

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100048100
Promoter A B Associates
Project typeResidential / Group Housing · Building development
LocalityKondhwa Budruk — Haveli taluka, pincode 411048
Applied on17 October 2022
Registered on12 December 2022
Completion, as first filed15 December 2024
Handed over30 October 2025 10 months later
Units declared49
Units sold 43 of 49 sold (88%), 6 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 12 August 2026
Application referenceREA52100121868
Current statusCompleted
Record last changed 12 August 2026 · 2 months ago

Where the sold count comes from, and whether it holds up. 43 of 49 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 49 flats and reaches the same answer — 43 sold, every one with money recorded as received against a named flat, and 6 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 August 2026.

Common questions

Is Adhish Residency registered with MahaRERA?
Yes. It is registered as P52100048100, filed on 12 December 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Adhish Residency been handed over?
Yes. The completion date on the register is October 2025.
Has Adhish Residency been delayed?
Yes. The first date filed was December 2024. It now stands at October 2025, 10 months later.
What did buyers actually pay in Adhish Residency?
A median of ₹6,867 per square foot of carpet, across 43 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Adhish Residency?
6 of 49 were still unsold at the promoter's last filing, in 2 BHK, from 666 sq ft of carpet.
Are there complaints against Adhish Residency?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Adhish Residency?
A B Associates, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100048100 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Kondhwa Budruk

Stock image, not a photograph of Aarambh Stock image
Registered here
₹6,069
On offer
2 BHK
Ready to move

Aarambh

R M S Developers · Kondhwa Budruk

50 sold
Slipped 17 months
Done
May 2026
Units
14
Carpet
650
Sold at
₹35.8 lakh
P52100050419
Stock image, not a photograph of Sai Arham Stock image
Registered here
₹5,815
On offer
2, 3 BHK
Ready to move

Sai Arham

Sai Anand Builders & Developers · Kondhwa Budruk

50 sold
Done
Dec 2026
Units
30
Carpet
799–1,118
Sold at
₹55 lakh
P52100052337