RERA registered PM1260002500160 Active
Pradnyesh Shriniwas Phase 2
Kharabwadi, Pune · Mixed by Jj Mauli Developers LLP
Official record Updated from the register 21 September 2026. Anything filed since then is not here yet.
In short
Pradnyesh Shriniwas Phase 2 in Kharabwadi is MahaRERA-registered (PM1260002500160) and still under construction, with possession filed for April 2030. Buyers have already registered 25 sales here at a median ₹5,140 per sq ft of carpet — not an asking price. About 32% of the 81 units are sold. Jj Mauli Developers LLP is the promoter.
- Sold here at
- ₹5,140
- per sq ft, 25 registered sales
- Available
- 1 BHK, 2 BHK, Shops
- 55 left · 140–625 sq ft
- Now due
- Apr 2030
- 4 months later than first promised
Where this is
Kharabwadi, PMRDA, Pune, 410501
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 81 units are filed unit by unit with the authority, the highest on floor 7. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
1 BHK 34 units · 16 available
2 BHK 35 units · 28 available
Shops 12 units · 11 available
26 / 81
32% absorption rate
Visual area guide See what the filed sizes feel like 2 generic footprints scaled from the registered carpet areas.
What each size looks like
Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.
1 BHK 34 units · 16 available
415 sq ft carpet as drawn, from 415–416 sq ft filed in this configuration
- Carpet, filed
- 415 sq ft
- Built-up
- about 498 sq ft
- Super built-up
- about 581 sq ft
Every room in this unit
Living and dining about 156 sq ft, Master bedroom about 104 sq ft, Kitchen about 62 sq ft, Bath about 36 sq ft, Balcony about 36 sq ft, Passage about 21 sq ft.
2 BHK 35 units · 28 available
591 sq ft carpet as drawn, from 571–625 sq ft filed in this configuration
- Carpet, filed
- 591 sq ft
- Built-up
- about 709 sq ft
- Super built-up
- about 827 sq ft
Every room in this unit
Living and dining about 172 sq ft, Master bedroom about 115 sq ft, Second bedroom about 92 sq ft, Kitchen about 69 sq ft, Bath about 40 sq ft, Balcony about 40 sq ft, Second bath about 34 sq ft, Passage about 29 sq ft.
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What buyers actually paid
| Range across those sales | ₹4,997 to ₹5,564 per sq ft |
|---|---|
| Sold and booked | 26 sold, 0 booked |
| Still available | 55 units, 140–625 sq ft |
A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.
Timeline audit
Revised projection
The completion date has moved from December 2029 to April 2030, 4 months later, on the promoter's own revised filing.
Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Kharabwadi (CT) · shown on this site as Kharabwadi |
|---|---|
| Taluka | Khed |
| Street, as filed | TALEGAON CHAKAN ROAD |
| Bounded north by | GAT NO.67/5 |
| Bounded east by | INTERNAL ROAD |
| Bounded south by | GAT NO. 67/3 |
| Bounded west by | GAT NO. 68 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Jj Mauli Developers LLP |
|---|---|
| Registered office | Gat No. 67/5, Gat No.67/5, Pradnyesh Shriniwas, Chakan Talegaon Road, Near Kushal Swarnali, Kharabwadi Chakan, Pune 410501 |
Professionals named on the filing
| Architect | Milind Panchal And Associates CA/2006/38979 |
|---|---|
| Engineer | Akshay Nathu Borkar 16045302 |
| Engineer | Amol Bhalekar |
| Chartered Accountant | Asky & Co 141109 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report TITLE REPORT.pdf | 15 June 2025 |
|---|---|
| Conveyance deed SALE DEED 1.pdf | 21 May 2025 2 older versions on file |
| Promoter's declaration, Form B phase-2 Affidavit cum Declaration.pdf | 21 May 2025 |
| Annexure A declaration ANNEXURE A.pdf | 22 May 2025 |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | PM1260002500160 |
| Promoter | Jj Mauli Developers LLP |
| Project type | Mixed · Building development |
| Locality | Kharabwadi — Khed taluka, pincode 410501 |
| Applied on | 26 May 2025 |
| Registered on | 30 June 2025 |
| Completion, as first filed | 31 December 2029 |
| Due | 30 April 2030 4 months later |
| Units declared | 81 |
| Units sold | 26 of 81 sold (32%), 55 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 30 June 2025 |
| Application reference | ACK21052500606 |
| Current status | Active |
| Record last changed | 30 June 2025 · 15 months ago |
Where the sold count comes from, and whether it holds up. 26 of 81 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 81 units and reaches the same answer — 26 sold, every one with money recorded as received against a named unit, and 55 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 30 June 2025.
Common questions
- Is Pradnyesh Shriniwas Phase 2 registered with MahaRERA?
- Yes. It is registered as PM1260002500160, filed on 30 June 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- When is Pradnyesh Shriniwas Phase 2 due to be handed over?
- The promoter has told MahaRERA April 2030. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
- Has Pradnyesh Shriniwas Phase 2 been delayed?
- Yes. The first date filed was December 2029. It now stands at April 2030, 4 months later.
- What did buyers actually pay in Pradnyesh Shriniwas Phase 2?
- A median of ₹5,140 per square foot of carpet, across 25 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
- How many units are left in Pradnyesh Shriniwas Phase 2?
- 55 of 81 were still unsold at the promoter's last filing, in 1, 2 BHK + shops, from 140–625 sq ft of carpet.
- Are there complaints against Pradnyesh Shriniwas Phase 2?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Pradnyesh Shriniwas Phase 2?
- Jj Mauli Developers LLP, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 21 September 2026. The authority's own page for PM1260002500160 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Kharabwadi
Stock image
- Registered here
- ₹5,933
- On offer
- Row Houses
- Due
- Apr 2030
- Units
- 28
- Carpet
- 1,058–1,192
- Sold at
- ₹64.6 lakh
Stock image
- Registered here
- ₹5,080
- On offer
- 1, 2 BHK
- Due
- Apr 2030
- Units
- 125
- Carpet
- 408–639
- Sold at
- ₹25.4 lakh
Stock image
- On offer
- Shops
- Due
- Jul 2027
- Units
- 114
- Carpet
- 152
- Sold at
- ₹10.2 lakh