Z Zomefy

RERA registered P52100047933 Active

Divya Elite

Katraj, Pune · Others by Rrs Infracon LLP

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

Divya Elite in Katraj is MahaRERA-registered (P52100047933). Possession was filed for August 2026, and that date has passed without a handover on the register. Buyers have already registered 6 sales here at a median ₹7,315 per sq ft of carpet — not an asking price. About 67% of the 12 units are sold. Rrs Infracon LLP is the promoter.

Stock image, not a photograph of Divya Elite Stock image
Where
Katraj
pincode 411046
Sold here at
₹7,315
per sq ft, 6 registered sales
Available
3 BHK
1 left · 714 sq ft
Was due
Aug 2026
16 days past its date, not handed over
A stock photograph, not Divya Elite. We have no picture of this site yet.

Where this is

Katraj, PMC, Pune, 411046

Village
Pune (M Corp.)
Taluka
Pune City
Pincode
411046
Coordinates
18.448390, 73.880106

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Unit sizes on file

All 12 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

3 BHK 8 units · 1 available

8 units 714 sq ft 66.36 sq m as filed

Shops 4 units · none available

2 units 165 sq ft 15.29–15.3 sq m as filed
2 units 171 sq ft 15.92 sq m as filed
Units sold

8 / 12

Selling steadily

67% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a unit that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that unit, and each unit to its size against the largest one drawn below.

3 BHK 8 units · 1 available

714 sq ft carpet as drawn

Carpet, filed
714 sq ft
Built-up
about 857 sq ft
Super built-up
about 1,000 sq ft
Every room in this unit

Living and dining about 176 sq ft, Master bedroom about 117 sq ft, Second bedroom about 94 sq ft, Third bedroom about 76 sq ft, Kitchen about 70 sq ft, Bath about 41 sq ft, Balcony about 41 sq ft, Second bath about 35 sq ft, Passage about 35 sq ft, Third bath about 29 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹7,315 per sq ft of carpet, median of 6 registered sales
Range across those sales ₹7,315 to ₹7,315 per sq ft
Sold and booked 8 sold, 0 booked
Still available 1 unit, 165–714 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold units carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2025
Current status Was due Aug 2026

Revised projection

The completion date has moved from June 2025 to August 2026, 14 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

56/5/2/7 is the plot this project is built on, as filed
Revenue village Pune (M Corp.) · shown on this site as Katraj
TalukaPune City
Street, as filed KATRAJ KONDHWA ROAD
Bounded north by PROPERTY OF MR NAHAR BEARING PLOT NO 6
Bounded east by ISKON TEMPLE
Bounded south by 12 METER WIDE ROAD
Bounded west by PROPERTY OF MR KOTHARI BEARING PLOT NO A

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRrs Infracon LLP
Registered officePlot No 43, Shreeraj, Plot No. 43, Daulat Nagar Society, S.No. 30/2/1B, Near Post Office, Dhankawadi, Pune 411043

Professionals named on the filing

Architect Sagar Suresh Mehta CA/2007/40446
Engineer Rohit Rajiv Sheth
Chartered Accountant Rohit R Shah & Co 152107

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

18 October 2022 is when an advocate last certified the title to this land
Title report Scan format A legal title report.pdf 18 October 2022
Promoter's declaration, Form B Form B (2).pdf 18 October 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100047933
Promoter Rrs Infracon LLP
Project typeOthers · Building development
LocalityKatraj — Pune City taluka, pincode 411046
Applied on20 October 2022
Registered on01 December 2022
Completion, as first filed30 June 2025
Was due31 August 2026 14 months later
Units declared12
Units sold 8 of 12 sold (67%), 4 still unsold
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 18 May 2026
Application referenceREA52100122069
Current statusActive
Record last changed 18 May 2026 · 4 months ago

Where the sold count comes from, and whether it holds up. 8 of 12 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 12 units and reaches the same answer — 8 sold, every one with money recorded as received against a named unit, and 1 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 18 May 2026.

Common questions

Is Divya Elite registered with MahaRERA?
Yes. It is registered as P52100047933, filed on 01 December 2022, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When was Divya Elite due to be handed over?
August 2026, and that date has passed without a handover being filed — 16 days ago. Section 18 of the Act gives an allottee a remedy when a promoter misses the date in the agreement.
What did buyers actually pay in Divya Elite?
A median of ₹7,315 per square foot of carpet, across 6 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many units are left in Divya Elite?
1 of 12 were still unsold at the promoter's last filing, in 3 BHK, from 714 sq ft of carpet.
Are there complaints against Divya Elite?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Divya Elite?
Rrs Infracon LLP, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100047933 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Katraj