Z Zomefy

RERA registered P52100053032 Active

The Work Club Hadapsar

Hadapsar, Pune · Commercial by Ravima Developer

Official record Updated from the register 16 September 2026. Anything filed since then is not here yet.

In short

The Work Club Hadapsar in Hadapsar is MahaRERA-registered (P52100053032) and still under construction, with possession filed for December 2027. No registered sales are on file here yet. The government values the units from ₹8,857 per sq ft of carpet, a stamp-duty floor rather than a market price. Ravima Developer is the promoter.

Stock image, not a photograph of The Work Club Hadapsar Stock image
Where
Hadapsar
pincode 411028
Valued from
₹8,857
per sq ft, the government’s floor
Available
Shops
14 left · 317–1,017 sq ft
Now due
Dec 2027
2 years later than first promised
A stock photograph, not The Work Club Hadapsar. We have no picture of this site yet.

Where this is

Hadapsar, PMC, Pune, 411028

Village
Hadapsar
Taluka
Haveli
Pincode
411028

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Unit sizes on file

All 16 units are filed unit by unit with the authority, the highest on floor 1. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.

Shops 16 units · 14 available

7 units 317 sq ft 29.42 sq m as filed
7 units 337 sq ft 31.34–31.35 sq m as filed
1 unit 595 sq ft 55.28 sq m as filed
1 unit 1017 sq ft 94.49 sq m as filed
Units sold

1 / 16

Early sales

6% absorption rate · the promoter's two filings disagree

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.

Shops 16 units · 14 available

317 sq ft carpet as drawn, from 317–1,017 sq ft filed in this configuration

Carpet, filed
317 sq ft
Built-up
about 380 sq ft
Super built-up
about 444 sq ft

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What these units are valued at

No sale has been registered at The Work Club Hadapsar yet. The promoter has filed no agreement values, so nothing below is this project's own price.

₹8,857 per sq ft of carpet, the state's own valuation of all 14 units still available here

That is the Annual Statement of Rates figure the promoter filed against every unsold unit here, one rate across all of them, which puts the smallest at ₹29.9 lakh and the largest at ₹89.3 lakh. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.

Timeline audit

Original proposed Dec 2025
Current status Due Dec 2027

Revised projection

The completion date has moved from December 2025 to December 2027, 2 years later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Survey No. 71/3/2C at Hadapsar is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed Survey No. 71/3/2C
Bounded north by 18 Mtr D P Road
Bounded east by Part of Survey No 71 3 2C
Bounded south by Part of Survey No 71 and ECP Vastu
Bounded west by Road and Part of Survey No 71 3 2C

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerRavima Developer
Registered office703-704, Majestic City View, Market Yard Road, Opposite Apasara Theator, Gultekadi, Pune 411037

Professionals named on the filing

Architect Cubix Architects Associates CA/2001/28514
Engineer Amol Hattarge
Engineer Mahesh Kulkarni
Chartered Accountant A R Baheti And Co 124812
Chartered Accountant Chandorkar & Limaye 149217

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

28 August 2023 is when an advocate last certified the title to this land
Title report Search Report.pdf 28 August 2023 1 older version on file
Promoter's declaration, Form B form B.pdf 26 July 2023

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100053032
Promoter Ravima Developer
Project typeCommercial · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on11 August 2023
Registered on10 October 2023
Completion, as first filed30 December 2025
Due31 December 2027 2 years later
Units declared16
Units sold 1 of 16 sold (6%), 15 still unsoldfilings disagree
Complaints0 on record with MahaRERA
Certificate on file Extension certificate, issued 14 August 2026
Application referenceREA52100143614
Current statusActive
Record last changed 14 August 2026 · 33 days ago

Where the sold count comes from, and whether it holds up. 1 of 16 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. And here the promoter's two filings do not agree. The quarterly report says 1 of 16 sold, leaving 15. The unit-by-unit list they file separately covers 16 units and marks 2 sold with 14 left. We show both rather than quietly pick one, and the number to distrust is what is still available — ask the promoter which filing is current before believing a unit is free. Either way, this is only as current as the last change to the record, 14 August 2026.

Common questions

Is The Work Club Hadapsar registered with MahaRERA?
Yes. It is registered as P52100053032, filed on 10 October 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is The Work Club Hadapsar due to be handed over?
The promoter has told MahaRERA December 2027. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has The Work Club Hadapsar been delayed?
Yes. The first date filed was December 2025. It now stands at December 2027, 2 years later.
What does a unit in The Work Club Hadapsar cost?
Nothing has been registered here yet. The government values the units at ₹8,857 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
How many units are left in The Work Club Hadapsar?
14 of 16 were still unsold at the promoter's last filing, in Shops, from 317–1,017 sq ft of carpet.
Are there complaints against The Work Club Hadapsar?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building The Work Club Hadapsar?
Ravima Developer, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 16 September 2026. The authority's own page for P52100053032 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hadapsar