Z Zomefy

RERA registered P52100080288 Active

Stella

Hadapsar, Pune · Residential / Group Housing by Dilip Baburao Tupe

Official record Updated from the register 06 November 2026. Anything filed since then is not here yet.

In short

Stella in Hadapsar is MahaRERA-registered (P52100080288) and still under construction, with possession filed for July 2028. Buyers have already registered 55 sales here at a median ₹4,769 per sq ft of carpet — not an asking price. About 71% of the 78 units are sold. Dilip Baburao Tupe is the promoter.

Stock image, not a photograph of Stella Stock image
Where
Hadapsar
pincode 411028
Sold here at
₹4,769
per sq ft, 55 registered sales
Available
2 BHK
23 left · 450–494 sq ft
Now due
Jul 2028
4 months later than first promised
A stock photograph, not Stella. We have no picture of this site yet.
Plot Demarcation

Land & Survey Location

Official parcel address and geographic coordinates as declared to MahaRERA.

Jurisdiction Hadapsar · Haveli

Hadapsar, PMC, Pune, 411028

Village Hadapsar
Taluka Haveli
Pincode 411028

No coordinate was filed for this project, so this searches Maps by name and locality rather than dropping a pin we cannot vouch for.

Flat sizes on file

All 78 flats are filed unit by unit with the authority, the highest on floor 13. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

Configuration Mix & Volume Proportional share of project density
78 Total Licenced Units
Residential Typology • 100.0% of tower

2 BHK Residences

23 Available 78 registered total
Estimated Market Window ₹21.5 lakh – ₹23.6 lakh
Locality Benchmark ₹4,769 / sq ft
Carpet Variations as Filed Span: 450 to 494 sq ft
450 sq ft 41.8 sq m 52 units
494 sq ft 45.88 sq m 26 units
Govt ASR Base: ₹21.4 lakh – ₹21.5 lakh 23 of 78 available

Carpet Area vs. Loading Factor Arithmetic

How statutory carpet translates to standard Pune market quoted areas (+20% Built-up, +40% Super Built-up)

Unit Configuration Statutory RERA Carpet (Actual) Approx Built-up (+20%) Super Built-up (+40% Loading) Available Inventory
2 BHK 450 – 494 sq ft (41.8 – 45.88 sq m) ~540 – 593 sq ft ~630 – 692 sq ft 23 left of 78
Units sold

55 / 78

Selling steadily

71% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 78 flats · 23 available

450 sq ft carpet as drawn, from 450–494 sq ft filed in this configuration

Carpet, filed
450 sq ft
Built-up
about 540 sq ft
Super built-up
about 630 sq ft
Every room in this flat

Living and dining about 131 sq ft, Master bedroom about 87 sq ft, Second bedroom about 70 sq ft, Kitchen about 52 sq ft, Bath about 31 sq ft, Balcony about 31 sq ft, Second bath about 26 sq ft, Passage about 22 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹4,769 per sq ft of carpet, median of 55 registered sales
Range across those sales ₹4,327 to ₹4,769 per sq ft
Sold and booked 0 sold, 55 booked
Still available 23 flats, 450–494 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Filing Compliance

Timeline audit & delivery schedule

Possession milestones tracked directly against original MahaRERA declarations.

Filing State Revised (+4 months)
Original Baseline
Mar 2028
Declared at registration
Current Statutory Date
Due
Jul 2028
4 months later than filed

Revised delivery projection

The completion date has moved from March 2028 to July 2028, 4 months later, on the promoter's own revised filing.

Under section 18 of the Real Estate (Regulation and Development) Act, a buyer whose possession is delayed beyond the date in the agreement may withdraw and claim a refund with interest, or stay and claim interest for every month of delay. That right attaches to the date in your agreement, not the date on this page.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

207/208/1A/1B/3 is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed BS Tupe (DP) Road
Bounded north by Project Land Boundary
Bounded east by Project Land Boundary
Bounded south by CTS No 4305
Bounded west by Adjacent CTS No 4316

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerDilip Baburao Tupe
Registered office208/1B, Bs Tupe (Dp) Road,, Behind Sadhana Girls High School, Malwadi, Survey No. 208/1B, Pune 411028

Professionals named on the filing

Architect Amit Bhat Architects
Architect Ar. Mangesh Gotal CA/2005/36501
Architect Mangesh Gotal
Engineer Abhishek Potphode ProTech Safe
Engineer Ashwin Bagde Envirosphere Consultant and Engineer
Engineer Neha Balasaheb Bhakare
Engineer Strudcom Pvt Ltd
Chartered Accountant Milani & Associates 132864
Chartered Accountant S Kodwani & Co 449574

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Title and ownership papers

3 March 2025 is when an advocate last certified the title to this land
Title report STELLA TITLE REPORT REVISED.pdf 3 March 2025
Promoter's declaration, Form B DocScanner 3 Mar 2025 19-18.pdf 4 March 2025

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100080288
Promoter Dilip Baburao Tupe
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411028
Applied on24 March 2025
Registered on19 May 2025
Completion, as first filed31 March 2028
Due31 July 2028 4 months later
Units declared78
Units sold 55 of 78 sold (71%), 23 still unsold
Complaints0 on record with MahaRERA
Certificate on file Corrected certificate, issued 19 August 2026
Application referenceREA52100168358
Current statusActive
Record last changed 12 September 2025 · 14 months ago

Where the sold count comes from, and whether it holds up. 55 of 78 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 78 flats and reaches the same answer — 0 sold, 55 booked with a price agreed but nothing received yet, and 23 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 12 September 2025.

Public Due Diligence

Common questions & statutory checks

Direct answers to questions buyers ask, verified strictly against the MahaRERA filing and registered deed records.

Verified Checks 7 Direct Answers
Is Stella registered with MahaRERA?
Yes. It is registered as P52100080288, filed on 19 May 2025, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
When is Stella due to be handed over?
The promoter has told MahaRERA July 2028. That is a declaration to the authority rather than a promise to a buyer; the date in your own agreement is the one that binds.
Has Stella been delayed?
Yes. The first date filed was March 2028. It now stands at July 2028, 4 months later.
What did buyers actually pay in Stella?
A median of ₹4,769 per square foot of carpet, across 55 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Stella?
23 of 78 were still unsold at the promoter's last filing, in 2 BHK, from 450–494 sq ft of carpet.
Are there complaints against Stella?
None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
Who is building Stella?
Dilip Baburao Tupe, as the promoter named on the registration.

Verify Government Filings Yourself

This dossier restates public records as filed on 06 November 2026. The authority's own registry page for P52100080288 carries sanctioned layout drawings, escrow accounts, quarterly progress filings, and title documents.

MahaRERA requires a CAPTCHA first. That is their verification gate, not a broken link.

Other projects in Hadapsar