In short

Paradise - B2 and B3 in Hadapsar is MahaRERA-registered (P52100049914) and was handed over in October 2026. Buyers have already registered 83 sales here at a median ₹10,666 per sq ft of carpet — not an asking price. About 94% of the 88 units are sold. 1 complaint sits on the filing. Kevin Properties is the promoter.

Stock image, not a photograph of Paradise - B2 and B3 Stock image
Where
Hadapsar
pincode 411036
Sold here at
₹10,666
per sq ft, 83 registered sales
Available
2 BHK
5 left · 786 sq ft
Now due
Oct 2026
4 months later than first promised
A stock photograph, not Paradise - B2 and B3. We have no picture of this site yet.

Where this is

Hadapsar, PMC, Pune, 411036

Village
Hadapsar
Taluka
Haveli
Pincode
411036
Coordinates
18.521388, 73.924639

The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.

Flat sizes on file

All 88 flats are filed unit by unit with the authority, the highest on floor 11. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.

2 BHK 88 units · 5 available

1 unit 764 sq ft 71.0 sq m as filed
40 units 775 sq ft 72.0 sq m as filed
39 units 786 sq ft 73.0 sq m as filed
5 units 802 sq ft 74.5 sq m as filed
2 units 807 sq ft 75.0 sq m as filed
1 unit 813 sq ft 75.5 sq m as filed
Units sold

83 / 88

Nearly sold out

94% absorption rate

Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.

What each size looks like

Generic layouts, not this project's plans. Only the carpet area is from the register — the rooms are the usual shares of a flat that size, and where the promoter actually put the kitchen or which way the balcony faces is not filed anywhere. Read them for scale, which is the part that is arithmetic on the register: each room is drawn to its share of the area filed for that flat, and each flat to its size against the largest one drawn below.

2 BHK 88 flats · 5 available

775 sq ft carpet as drawn, from 764–813 sq ft filed in this configuration

Carpet, filed
775 sq ft
Built-up
about 930 sq ft
Super built-up
about 1,085 sq ft
Every room in this flat

Living and dining about 226 sq ft, Master bedroom about 150 sq ft, Second bedroom about 120 sq ft, Kitchen about 90 sq ft, Bath about 53 sq ft, Balcony about 53 sq ft, Second bath about 45 sq ft, Passage about 38 sq ft.

The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.

What buyers actually paid

₹10,666 per sq ft of carpet, median of 83 registered sales
Range across those sales ₹8,800 to ₹14,739 per sq ft
Sold and booked 83 sold, 0 booked
Still available 5 flats, 764–813 sq ft

A registered price is what a buyer contracted to pay, so it is the closest thing to a real number this market produces. It still is not a quote for you: these agreements were signed on different dates as the project progressed, floor and facing move the rate, and what a builder asks today may be higher or lower. Unsold flats carry a government ready-reckoner valuation instead of a price, and that is a different thing, so it is not mixed into the figures above.

Timeline audit

Original proposed Jun 2026
Current status Handed over Oct 2026

Revised projection

The completion date has moved from June 2026 to October 2026, 4 months later, on the promoter's own revised filing.

Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.

Advertisement
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.

The land itself

Sr. No. 134 Hissa No. 1/1A/1A is the plot this project is built on, as filed
Revenue village Hadapsar
TalukaHaveli
Street, as filed BG Shirke Road
Bounded north by 24m wide D P Road
Bounded east by Plot no 1 out of the layout
Bounded south by Land bearing s no 134 part
Bounded west by Land bearing s no 133 part

Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.

"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.

Who is behind this project

Filed by the promoter with MahaRERA.

Promoter on the registerKevin Properties
Registered office2413, Kumar Capital, East Street, Besides Axis Bank, Camp, Pune 411001
Registered agents 368 licensed agents may sell this project

Professionals named on the filing

Architect Milind Patil CA/89/12285
Engineer Harshad Pendse
Engineer Jitendra Jadhav
Chartered Accountant GMKS & Co. 134685
Chartered Accountant Supriya Abhijit Mundada 156545

The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.

Complaints filed with MahaRERA

1 case against this project, 0 with an order on record. Complainants' names are published by the authority; we leave them out. Quote the case number to look one up.

Case numberFiledOutcome
CC12604863 Aug 2026 No order on record

A complaint is not proof of wrongdoing, and a project with none is not necessarily well run — most buyers never file. What the pattern shows is whether disputes here reached the regulator and whether they were decided.

Title and ownership papers

16 February 2023 is when an advocate last certified the title to this land
Title report 2_Legal Title Report_1_Format A.pdf 16 February 2023 1 older version on file
Promoter's declaration, Form B _Form B_Declaration.pdf 6 December 2022

No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.

So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.

RERA filing records

View all

Every figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.

FieldAs filed with MahaRERA
Registration numberP52100049914
Promoter Kevin Properties
Project typeResidential / Group Housing · Building development
LocalityHadapsar — Haveli taluka, pincode 411036
Applied on17 February 2023
Registered on06 March 2023
Completion, as first filed10 June 2026
Handed over10 October 2026 4 months later
Units declared88
Units sold 83 of 88 sold (94%), 5 still unsold
Complaints1 on record with MahaRERA
Certificate on file Original registration certificate, issued 06 March 2023
Application referenceREA52100132301
Current statusCompleted
Record last changed 06 March 2023 · over 3 years ago

Where the sold count comes from, and whether it holds up. 83 of 88 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 88 flats and reaches the same answer — 83 sold, every one with money recorded as received against a named flat, and 5 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 06 March 2023.

Common questions

Is Paradise - B2 and B3 registered with MahaRERA?
Yes. It is registered as P52100049914, filed on 06 March 2023, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
Has Paradise - B2 and B3 been handed over?
Yes. The completion date on the register is October 2026.
Has Paradise - B2 and B3 been delayed?
Yes. The first date filed was June 2026. It now stands at October 2026, 4 months later.
What did buyers actually pay in Paradise - B2 and B3?
A median of ₹10,666 per square foot of carpet, across 83 sale agreements registered in this project. That is what was paid and stamped, not what is being asked.
How many flats are left in Paradise - B2 and B3?
5 of 88 were still unsold at the promoter's last filing, in 2 BHK, from 786 sq ft of carpet.
Are there complaints against Paradise - B2 and B3?
1 case has been filed with MahaRERA against this project. A complaint is an allegation that has been lodged, not a finding against the promoter.
Who is building Paradise - B2 and B3?
Kevin Properties, as the promoter named on the registration.

Check this yourself

This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100049914 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.

MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.

Other projects in Hadapsar

Stock image, not a photograph of Eraville Phase I Stock image
Valued from
₹8,023
On offer
Shops
Ready to move

Eraville Phase I

Neha Constructions · Hadapsar

79 sold
Slipped 3.5 years
Done
Dec 2024
Units
38
Carpet
266–2,667
Sold at
₹35 lakh
P52100016089
Stock image, not a photograph of Felicia Wing A Stock image
Registered here
₹7,379
On offer
3 BHK
Ready to move

Felicia Wing A

Anand Builders · Hadapsar

98 sold
Slipped 1.5 years
Done
Jun 2026
Units
88
Carpet
742–778
Sold at
₹47.5 lakh
P52100028478