RERA registered P52100016089 Completed
Eraville Phase I
Hadapsar, Pune · Commercial by Neha Constructions
Official record Updated from the register 04 October 2026. Anything filed since then is not here yet.
In short
Eraville Phase I in Hadapsar is MahaRERA-registered (P52100016089) and was handed over in December 2024. No registered sales are on file here yet. The government values the units from ₹8,023 per sq ft of carpet, a stamp-duty floor rather than a market price. About 79% of the 38 units are sold. Neha Constructions is the promoter.
- Valued from
- ₹8,023
- per sq ft, the government’s floor
- Available
- Shops
- 8 left · 266–2,667 sq ft
- Now due
- Dec 2024
- 3.5 years later than first promised
Where this is
Hadapsar, PMC, Pune, 411028
The coordinates are the promoter's own, filed with MahaRERA. We have not checked them on the ground, and a filed pin is occasionally a few kilometres from the survey number on the same filing — if it does not look right, search by name.
Unit sizes on file
All 38 units are filed unit by unit with the authority, the highest on floor 4. Sizes are RERA carpet area — the floor you can actually walk on, not a built-up or saleable figure. The register holds them in square metres, so that figure is printed under each one: it is what you will see if you open the filing, and the square feet are our arithmetic on it.
Nothing filed here is a home. Every unit is registered as non-residential — shops, offices or similar — which is the promoter's own answer on the register rather than anything read off the areas below.
Configuration not filed 6 units · 5 available
Shops 32 units · 3 available
30 / 38
79% absorption rate
Visual area guide See what the filed sizes feel like 1 generic footprint scaled from the registered carpet areas.
What each size looks like
Footprints, not plans. What is registered here is sold as a shell, and the register files its area and nothing else — so each box below is one unit's filed carpet area, drawn to its size against the largest one here, and it says nothing about how the space is divided up.
Shops 32 units · 3 available
266 sq ft carpet as drawn, from 159–354 sq ft filed in this configuration
- Carpet, filed
- 266 sq ft
- Built-up
- about 319 sq ft
- Super built-up
- about 372 sq ft
The built-up and super built-up figures are ours, not the promoter's: carpet plus 20% and plus 40%, which is the usual Pune loading. A promoter can load more, and the number they quote is the one to check against the agreement. Which of the three you are actually buying, and why the register only records one of them, is in our guide to carpet against super built-up area.
What these units are valued at
No sale has been registered at Eraville Phase I yet. The promoter has filed no agreement values, so nothing below is this project's own price.
That is the Annual Statement of Rates figure the promoter filed against every unsold unit here, one rate across all of them, which puts the smallest at ₹21.3 lakh and the largest at ₹2.1 crore. Stamp duty is charged on whichever is higher, this or the agreement value, so nothing here can be registered below it. Read it as the floor under the price you will be quoted, which in most Pune localities sits well above it.
Timeline audit
Revised projection
The completion date has moved from June 2021 to December 2024, 3.5 years later, on the promoter's own revised filing.
Buyers who took possession late here may still have had a claim under section 18 of the Real Estate (Regulation and Development) Act, which entitles them to interest for every month of delay beyond the date in their agreement. More usefully for anyone buying today, this is a record of how this promoter performed against their own filed date.
Deep due diligence Open the complete registry dossier Land, promoter, complaints, title papers, plans and the raw MahaRERA record.
The land itself
| Revenue village | Hadapsar |
|---|---|
| Taluka | Haveli |
| Street, as filed | Sadesataranali |
| Bounded north by | Sr No 181 Part |
| Bounded east by | Sr No 183 Part |
| Bounded south by | Sr No 182 Part |
| Bounded west by | Sr No 181 9 1 |
Every promoter has to file the survey numbers of the land and what lies on each of its four sides. It is the driest thing on this page and the most useful if you are serious: the survey number is what the revenue record is keyed on, so it is what you quote to check the seven-twelve extract, and the boundaries are how you confirm on site that the plot you were shown is the plot that was registered.
"Street" is the register's own field name and promoters fill it with whatever they have — a road, a locality, sometimes the survey numbers again. It is printed as filed rather than tidied up.
Who is behind this project
Filed by the promoter with MahaRERA.
| Promoter on the register | Neha Constructions |
|---|---|
| Registered office | 302, 1, Westville, High Street Shivneri Park, Opposite Seimens Company, Balewadi, Pune 411045 |
| Registered agents | 1 licensed agent may sell this project |
Professionals named on the filing
| Architect | VK:a ARCHITECTURE |
|---|---|
| Engineer | Swapnil Dattatray Rasane |
| Chartered Accountant | K K S S And Associates 135254 |
| Chartered Accountant | N N Bagwan and Associates 611753 |
The promoter appoints these, and MahaRERA requires the architect and engineer to certify progress before money can be drawn from the project account. A name that recurs across several of a builder's projects is normal; one that recurs across several lapsed ones is worth a question.
Title and ownership papers
| Title report Search Report.pdf | 21 March 2018 |
|---|---|
| Promoter's declaration, Form B Form B.pdf | 12 July 2024 2 older versions on file |
No project reaches the register without an advocate's report on the title to its land, so a title report on file is the floor and not a distinction. What the date tells you is how recently somebody qualified looked. What none of it tells you is whether the title is clear: a report can record an objection, a pending suit or a missing consent and still be a perfectly valid filing, and nothing here reads the contents of the document.
So read it yourself before you pay a booking amount, and read the newest one. Every document above is on the authority's page for this project, under the filename shown — the link is in Check this yourself. What to look for in each one, and what having it on file does not prove, is set out in our guide to a project's title papers.
RERA filing records
View allEvery figure here is the authority's, not ours, as of the date at the top of this page. This is the raw record, reproduced without alteration.
| Field | As filed with MahaRERA |
|---|---|
| Registration number | P52100016089 |
| Promoter | Neha Constructions |
| Project type | Commercial · Building development |
| Locality | Hadapsar — Haveli taluka, pincode 411028 |
| Applied on | 10 April 2018 |
| Registered on | 16 April 2018 |
| Completion, as first filed | 30 June 2021 |
| Handed over | 31 December 2024 3.5 years later |
| Units declared | 38 |
| Units sold | 30 of 38 sold (79%), 8 still unsold |
| Complaints | 0 on record with MahaRERA |
| Certificate on file | Original registration certificate, issued 19 June 2020 |
| Application reference | REA52100035913 |
| Current status | Completed |
| Record last changed | 29 July 2024 · over 2 years ago |
Where the sold count comes from, and whether it holds up. 30 of 38 is the promoter's own figure, from the quarterly progress report every registered project has to file. Nobody audits that. But they file a second, separate thing with the same authority: the building unit by unit. That list accounts for all 38 units and reaches the same answer — 30 sold, every one with money recorded as received against a named unit, and 8 still unsold. Two filings, made separately, agreeing to the unit. That is not an audit, but it is a good deal harder to fudge than one round number. Either way, this is only as current as the last change to the record, 29 July 2024.
Common questions
- Is Eraville Phase I registered with MahaRERA?
- Yes. It is registered as P52100016089, filed on 16 April 2018, and the registration is current. The authority's own record is the place to confirm that; this page restates it.
- Has Eraville Phase I been handed over?
- Yes. The completion date on the register is December 2024.
- Has Eraville Phase I been delayed?
- Yes. The first date filed was June 2021. It now stands at December 2024, 3.5 years later.
- What does a unit in Eraville Phase I cost?
- Nothing has been registered here yet. The government values the units at ₹8,023 per square foot of carpet, which is the floor stamp duty is charged on and is normally below what anyone pays.
- How many units are left in Eraville Phase I?
- 8 of 38 were still unsold at the promoter's last filing, in Shops, from 266–2,667 sq ft of carpet.
- Are there complaints against Eraville Phase I?
- None appear against this project in the register. That covers cases filed with MahaRERA, and nothing about disputes settled elsewhere or never filed.
- Who is building Eraville Phase I?
- Neha Constructions, as the promoter named on the registration.
Check this yourself
This page restates one public record as we read it on 04 October 2026. The authority's own page for P52100016089 carries more that we do not republish: the registration certificate, every quarterly progress report, the sanctioned plans, parking allocation, the project bank account, and any declared litigation.
MahaRERA will ask you to type a CAPTCHA first. That is their gate, not a broken link — and it is the reason this page exists, because a register you have to solve a puzzle to read one project at a time is not one anybody comparing four projects will actually use.
Other projects in Hadapsar
Stock image
- Registered here
- ₹6,953
- On offer
- 1 BHK
- Done
- Jul 2025
- Units
- 42
- Carpet
- 224–436
- Sold at
- ₹29.5 lakh
Stock image
- Registered here
- ₹11,674
Kumar Prospera - A6
Kumar Agro Products Pvt Ltd - Kumar Company (Now known as Kumar Construction and Properties Pvt Ltd) JV · Hadapsar
- Done
- Aug 2025
- Units
- 92
- Carpet
- 791–1146
- Sold at
- ₹1.1 crore
Stock image
- Registered here
- ₹9,931
- On offer
- 2 BHK
59 complaints
- Done
- Dec 2026
- Units
- 560
- Carpet
- 516–563
- Sold at
- ₹52.8 lakh